You are on page 1of 4

Revision Zapata Central carga axial y momento biaxial

Geometria de zapata

B 350 cm
L 600 cm
h 60 cm
r 5 cm
d h r = 55 cm
b 130 cm
l 130 cm

Reacciones Mx 14.45 tonnef m + 4.3 tonnef m

P 62.2 tonnef 50.36 tonnef = 112.56 tonnef

Materiales My 139.96 tonnef m 45.54 tonnef m = 185.5 tonnef m


kgf kgf kgf
f'c 250 f#c 0.8 f'c = 200 fy 4200
cm 2 cm 2 cm 2

1 = 0.85
kgf
f''c 1 f#c = 170
cm 2

Revision de mecanismo de falla a penetracion c1 b = 130 cm c2 l = 130 cm


kgf tonnef
Vu P h B L 2400 ((2 m h)) B L 1.8 = 195.72 tonnef
m3 m3
Acr 2 d c1 + c2 + 2 d = 40700 cm 2

c1 + d c2 + d
cAB = 92.5 cm cAC = 92.5 cm
2 2
3 2
d c1 + d c1 + d d 3 d c2 + d c1 + d
Jcx + + = 2.373 10 8 cm 4
6 6 2
3 2
d c2 + d c2 + d d 3 d c1 + d c2 + d
Jcy + + = 2.373 10 8 cm 4
6 6 2

1
1 = 0.401
2
c1 + d
1 + 0.67
c2 + d

Vu Mx cAB My cAC kgf


vuA + + = 7.417
Acr Jcy Jcx cm 2
1
1 = 0.401
2
c1 + d
1 + 0.67
c2 + d

Vu Mx cAB My cAC kgf


vuA + + = 7.417
Acr Jcy Jcx cm 2 Los signos positivos son
tensiones
Vu Mx cAB My cAC kgf
vuB + = 8.003
Acr Jcy Jcx cm 2

Vu Mx cAB My cAC kgf


vuC + = 1.614
Acr Jcy Jcx cm 2

Vu Mx cAB My cAC kgf


vuD = 2.201
Acr Jcy Jcx cm 2

FR 0.8
vd
kgf
vd = 11.314
cm 2

vuA vuB vuC vuD


= 0.656 = 0.707 = 0.143 = 0.195
vd vd vd vd

Revison de mecanismo de falla a felxion

A B L = 21 m 2

Vu 6 Mx 6 My kgf
1 + + = 2.357 Los signos positivos son
A BL 2
LB 2
cm 2 tensiones
Vu 6 Mx 6 My kgf
2 + = 2.536
A B L2 L B2 cm 2

Vu 6 Mx 6 My kgf
3 + = 0.672
A BL 2
LB 2
cm 2

Vu 6 Mx 6 My kgf
4 = 0.493
A BL 2
LB 2
cm 2

tonnef Vu tonnef
qu 23.3 = 9.32
m2 A m2

2
B
q L b
2
u 2 qu B ((110 cm ))
MB ML
2 2
MB = 84.579 tonnef m ML = 49.338 tonnef m

6 #B 2
#B in AvB = 2.85 cm 2
8 4

sB 20 cm

L
AsB AvB = 85.507 cm 2
sB

AsB 0.7
f#c'
pB = 0.00259 pminf = 0.00236
Ld fy

pB fy
qB = 0.064
f''c
MRB FR AsB fy d 1 0.5 qB = 152.959 tonnef m

6 #L 2
#L in AvL = 2.85 cm 2
8 4

sL 20 cm

B
AsL AvL = 49.879 cm 2
sL

AsL 0.7
f#c'
pL = 0.00259 pminf = 0.00236
Bd fy

pL fy
qL = 0.064
f''c
MRL FR AsL fy d 1 0.5 qL = 89.226 tonnef m

MB ML
= 0.553 = 0.553
MRB MRL
B b
VB qu L = 153.78 tonnef VL
qu B ((110 cm ))
= 89.705 tonnef
2

VRB 0.5 FR L d
f#c' = 186.676 tonnef

VRL 0.5 FR B d
f#c' = 108.894 tonnef

VB VL
= 0.824 = 0.824
VRB VRL

Acom 16.96 m 2

A = 21 m 2
Acom
= 0.808
A

1.8 2 2 2
M 3.65 = 8.76
2 3

You might also like