You are on page 1of 3
CALL us Topay 281.516.9441 (TEL:2815169441) 4 f ao (https http hisiaotapaic ninth owe iran eneurroMPoot com ax ae PRoceRs OUR POOL CONSTRUCTION PROCESS NORMAL COMPLETION TIME = Four) Sx) eaendar woah of excavation SHEESH {weer permit) sree (D) PROJECT DESIGN AND PROPOSAL The atten nth constucton prose is nial meting beeen elena oe oft ae gh wetlcar sree @) PERMITS AND APPROVALS stg lees belo Be Beprgeeonahuton. We wie sree @ Poot Lavour nent pan naw nen speed bau autora represen anal nceessyparmi a 680 i sree @ excavarion orb ers ae tn saan lie pol may beg Me erent ral ater orton haces nodes Pacis back gon wale aa pro aed manera an te oa and rune nto sre @ sravcrural steet pacesharsnatyané vera Te Rotana veel bar sree © sus our fetgotmn. arnt a va nan bn a nT wir as srr he ene sre (D) POOL FLOOR AND GUNITE APPLICATION ethic pa Secnae ste suprarsmarural renga roe wa ear ara sree @ TILE AND coPINs et men te ne he ole tes as tthe el sree @ PLumsine Thepumbrg tpn coortspestay sneer Milan apa aaa cacti aman Tinea nce ete srep @) equipment serup der aptonl ac. pant tom Para apeww aerial seins}. TEP i) ELECTRICAL AND GAS ye pont bec conde ol gt ar oe sre (2) deck LAYOUT AND POUR Tes pales leita rl ane a jy al pte an pat a athe ed vsg stun conta atm ony ree ana sei Poe cogng cha i ‘atoleteconpimactincibermatn neon [oh Te die aston oar nos kt rare wih Silt aptosinaly "op coiar hmontcaes, oslo orbk moreso be compe beehe deine sre CB) sive etean uP ‘eth pon east eating camplctn We wil now rem llesaneous cengeucon mater ané nae fom fe consbuton wi an prepare pal sree 8) Poot Finish sree (7B) stant uP ano insrRUCTION stalin cope oi Salers wens pol fay ‘eval supan aurtaneg eto ois pon awe

You might also like