Preparation of Final DPR for 4-laning of Daboka Dimapur Section
(Length 130.167Km) of NH 36 & 39 Dimapur Bypass (Assam Part)
PREFACE
The unit rates are based on Prevailing SOR, 2013-14 for National Highways under
Assam P.W (Building & NH), Government of Assam with Percentage increase in item
rates allowed for Karbi Anglong district and addition of cost of carriage (cost of haulage,
Loading and unloading) of materials as under :
(i) For locally available materials like stone, stone boulders, coarse aggregates,
sand, and earth for filling etc, carriage cost for lead as per Lead Chart from the
source/quarry/crusher to work site, to work site via plant site.
(ii) For Cement, steel, Bitumen & POL etc rates of materials include basic cost of
materials at s i t e .
(iii) For manufactured construction materials rates as per SOR rates.
(iv) Rates towards cost of haulage and loading & unloading are as per SOR, 2013-14
for NH or SH, PWD, Government of Assam.
(a) An initial Lead of 5km for quarry material is in-built in SOR rates. Extra
lead over 5km, if any, has been considered for quarry materials.
(b) An initial Lead of 10km for plant mixed materials in in-built in SOR rates.
Extra lead over 10km, if any, has been considered in rate analysis.
= L2-10
PROPOSED CH. 132+375KM
= 0, if L2-10<0
DIMAPUR BY-PASS (Assam Part)
DILLAI STONE
CH. 118+050Km to CH. 132+375Km
QUARRY
KATCHA ROAD 0.5KM
NH-39
MANZA SAND QUARRY DIMAPUR BY-PASS (Nagaland Part)
4.00Km
(ROAD SIDE) CH. 132+375Km to CH. 153+058Km
SURFACE ROAD - 4 KM
Ext.CH. 162KM OF
Ext.CH. 120KM OF Ext.CH. 147KM OF Ext.CH. 159+400 KM OF DIMAPUR Ext.CH. 124+200KM
NH-36 NH-36 NH-36 (Ext.CH. 108.00 OF NH-39) OF NH-39
(Ext.CH. 168.00 OF NH-36)
NH-36
5.0Km
& PLANT SITE PROPOSED CH.
PROPOSED CH. 118+050KM
PROPOSED CH 153+058KM
KATCHA ROAD 1KM
118+050KM From Main Road to Plant Site
SURFACE ROAD - 5 KM
(L1-5Km) (L2-10Km)
KATCHA ROAD 1KM
CONSTRUCTION
QUARRY
SITE
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
3 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
4 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
5 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
6 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
8 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
10 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
12 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
13 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
14 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
15 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
16 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Stone weighing not less than 40kg 1.00 Cum 1.00 2.00 0.00 0.00 11.4 0 2.5 121.80
providing and laying
15.4 A Cum 1463.00 1.00 1609.16
Pitching on Slope
Stone spalls of minimum 25 mm size 0.20 Cum 0.2 0.4 0.00 0.00 11.4 0 2.5 24.36
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
17 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Cast in Situ Cement Sand 10.90 Cum 0.030 0.055 0.00 0.00 2.6 0 3 1.87
8.1.B Metre 314.00 360.00 328.32
Concrete M20 kerb Cement 5.70 Tonne 0.016 0.016 0.00 0.00 0 0 0 0.00
Water 30.00 Tonne 0.0833 0.08333333 0.00 0.00 11.4 0 2.5 5.08
stone aggregate 20 mm 36.59 Cum 0.122 0.244 0.00 0.00 11.4 0 2.5 14.86
Cast in Situ Cement Sand 18.30 Cum 0.061 0.1098 0.00 0.00 2.6 0 3 3.77
8.2.B Concrete M20 kerb with Metre 596.00 300.00 621.93
channel Cement 9.01 Tonne 0.030 0.030 0.00 0.00 0 0 0 0.00
Water 36.00 Tonne 0.12 0.12 0.00 0.00 11.4 0 2.5 7.31
per cm
Printing New Letter and
height
8.3.(ii) Figures of any Shade 0.40 1600.00 Paint 0.600 Tonne 3.75E-07 3.75E-07 0.00 0.00 0 0 0 0.00 0.40
per
English and Roman
letter
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
18 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
(vii) 90 cm high octagon each 7850.00 1 90 cm high octagon (14.175Kg/Sqm) 0.672 Tonne 0.0095256 0.0095256 0.00 0.00 0 0 0 0.00 7897.31
Mild steel angle iron 75 mm x 75 mm x 6 Add 2% for
19.00 Tonne 0.02 0.02 0.00 0.00 0 0 0 0.00
mm,2.85 metres long Driling holes
(16244.86x0.9
Cement 0.03 Tonne 0.03671111 0.03671111 0.00 0.00 0 0 0 0.00 00)x2%
Direction and Place
8.5 Identification signs upto Sqm 10000.00 0.900
Stone Aggregate 0.11 Cum 0.12 0.24 0.00 0.00 11.4 0 2.5 14.62 292.41
0.9 sqm size board.
Sand 0.05 Cum 0.06 0.108 0.00 0.00 2.6 0 3 3.70
Aluminium sheeting fixed with 10310.73
0.90 Tonne 0.01418 0.01418 0.00 0.00 0 0 0 0.00
encapsulated lens type reflective
sheeting of size 0.9 sqm
Mild steel angle iron 75 mm x 75 mm x 6 Add 2% for
38.00 Tonne 0.03 0.03 0.00 0.00 0 0 0 0.00 Driling holes
mm, 2.85 metres long, 2 nos
Cement (16244.86x1.5
Direction and Place 0.07 Tonne 0.04405333 0.04405333 0.00 0.00 0 0 0 0.00
)x2%
Identification signs with
8.6 Sqm 11000.00 1.500 Stone Aggregate 0.22 Cum 0.144 0.288 0.00 0.00 11.4 0 2.5 17.54 487.35
size more than 0.9 sqm
size board. Sand 0.11 Cum 0.072 0.1296 0.00 0.00 2.6 0 3 4.45
Aluminium sheeting fixed with 11509.33
1.50 Tonne 0.014 0.014 0.00 0.00 0 0 0 0.00
encapsulated lens type reflective
sheeting
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
19 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Stone Aggregate 2.12 Cum 0.3525 0.705 0.00 0.00 11.4 0 2.5 42.93
5th kilometre stone Sand 1.06 Cum 0.17625 0.31725 0.00 0.00 2.6 0 3 10.88
8.14 (i) nos 3869.00 6 3922.82
(precast)
HYSD (1.05/1000)x22.08Kg 0.023184 Tonne 0.0000039 0.0000039 0.00 0.00 0 0 0 0.00
Binding wire (6/1000)Kgx22.08 0.13 Tonne 0.000022 0.000022 0.00 0.00 0 0 0 0.00
Paint conforming (6/40x9.85) liter 1.48 Tonne 0.00025 0.00025 0.00 0.00 0 0 0 0.00
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
20 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Stone Aggregate 3.39 Cum 0.24235714 0.48471429 0.00 0.00 11.4 0 2.5 29.52
Ordinary Kilometer Sand 1.70 Cum 0.12117857 0.21812143 0.00 0.00 2.6 0 3 7.48
8.14 (ii) nos 2431.00 14 2468.00
stone
HYSD (1.05/1000)x26.320Kg 0.027636 Tonne 0.0000020 0.0000020 0.00 0.00 0 0 0 0.00
Binding wire (6/1000)Kgx26.320 0.16 Tonne 0.000011 0.00001 0.00 0.00 0 0 0 0.00
Paint conforming (6/40x11.410) liter 1.71 Tonne 0.000122 0.000122 0.00 0.00 0 0 0 0.00
Stone Aggregate 1.42 Cum 0.04309091 0.08618182 0.00 0.00 11.4 0 2.5 5.25
Sand 0.71 Cum 0.02154545 0.03878182 0.00 0.00 2.6 0 3 1.33
8.14 (iii) Hectometer stone nos 628.00 33 634.58
HYSD (1.05/1000)x66Kg 0.0693 Tonne 0.0000021 0.0000021 0.00 0.00 0 0 0 0.00
Binding wire (6/1000)Kgx66 0.40 Tonne 0.000012 0.000012 0.00 0.00 0 0 0 0.00
Paint conforming (6/40x6.27) liter 0.94 Tonne 0.000029 0.000029 0.00 0.00 0 0 0 0.00
Stone Aggregate 1.13 Cum 0.01973684 0.03947368 0.00 0.00 11.4 0 2.5 2.40
Sand 0.56 Cum 0.00986842 0.01776316 0.00 0.00 2.6 0 3 0.61
8.16 Boundary pillar nos 592.00 57 620.59
HYSD (1.05/1000)x66Kg 0.08379 Tonne 0.0000015 0.0000015 0.00 0.00 0 0 0 0.00
Binding wire (6/1000)Kgx66 0.48 Tonne 0.0000084 0.0000084 0.00 0.00 0 0 0 0.00
Stone spall 11.97 Cum 0.21 0.4200 0.00 0.00 11.4 0 2.5 25.58
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
21 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Providing and laying Stone 1.00 Cum 1 2 0.00 0.00 11.4 0 2.5 121.80
15.8.A Cum 5273.00 1.00 5419.16
flooring Stone Spalls 0.20 Cum 0.2 0.4 0.00 0.00 11.4 0 2.5 24.36
Cement 0.765 Tonne 0.153 0.153 0.00 0.00 0 0 0 0.00
Stone masonry work in
12.7.a Cum 4333.00 5.00 Sand 1.575 Cum 0.315 0.567 0.00 0.00 2.6 0 3 19.45 4378.03
cement mortar
Stone 1.05 Cum 0.21 0.42 0.00 0.00 11.4 0 2.5 25.58
Stone 20mm 7.290
Cum 0.16 0.32 0.00 0.00 11.4 0 2.5 19.73
Aggregate 10mm 4.860
7.5 (i) Facing elements of RCC Sqm 1947.00 75.00 HYSD @ 5kg/Sqm 0.38 Tonne 0.00506667 0.00506667 0.00 0.00 0 0 0 0.00 1971.73
Cement 5.697 Tonne 0.07596 0.07596 0.00 0.00 0 0 0 0.00
Coarse Sand 6.08 Cum 0.081 0.1458 0.00 0.00 2.6 0 3 5.00
Reinforced cement HYSD steel 0.28 Tonne 0.028 0.028 0.00 0.00 0 0 0 0.00
8.22 (ii) concrete crash barrier M- Rm 4209.00 10.00 4209.00
Premoulded asphalt filler borad (1sqm=0.025cum)
0.008 Cum 0.0008 0.00144 0.00 0.00 0 0 0 0.00
40
40mm 43.200
Stone
13.5 20mm 43.200 Cum 0.9 1.80 0.00 0.00 11.4 0 2.5 109.62
Aggregate
.B.d.(i) PCC Grade M30 Cum 8889.00 120.00 10mm 21.600 9026.40
case II Cement 48.6 Tonne 0.405 0.405 0.00 0.00 0 0 0 0.00
Coarse Sand 54 Cum 0.45 0.81 0.00 0.00 2.6 0 3 27.78
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
22 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
Structural steel in plates, angles etc 1.05 Tonne 1.05 1.05 0.00 0.00 0 0 0 0.00
Cutting edge of mild
12.10 Tonne 101302.00 1.00 101302.00
steel
Nuts and bolts 20.00 Tonne 0.02 0.02 0.00 0.00 0 0 0 0.00
40mm 5.400
Stone
12.11.B. 20mm 5.400 Cum 0.9 1.80 0.00 0.00 11.4 0 2.5 109.62
Top Plug Aggregate
e (ii) Cum 7381.00 15.00 10mm 2.700 7518.40
PCC Grade M20
Case I Cement 5.16 Tonne 0.344 0.344 0.00 0.00 0 0 0 0.00
Coarse Sand 6.75 Cum 0.45 0.81 0.00 0.00 2.6 0 3 27.78
Stone 20mm 4.239
Cum 0.7065 1.41 0.00 0.00 11.4 0 2.5 86.05
Bored cast in situ M35 Aggregate 10mm 2.826
12.24.B M 11357.00 10.00 11464.86
(pile dia 1000m) Cement 3.28915 Tonne 0.329 0.329 0.00 0.00 0 0 0 0.00
Coarse Sand 3.53 Cum 0.35325 0.63585 0.00 0.00 2.6 0 3 21.81
Stone 20mm 8.100
Cum 0.9 1.80 0.00 0.00 11.4 0 2.5 109.62
12.38 B Aggregate 10mm 5.400
Pile Cap Cum 8931.00 15.00 9068.40
.III (ii) Cement 6.1 Tonne 0.407 0.407 0.00 0.00 0 0 0 0.00
Coarse Sand 6.75 Cum 0.45 0.81 0.00 0.00 2.6 0 3 27.78
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
23 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for
4-laning og Daboka - Dimapur Section (Length 130.167Km)
of NH - 36&39 - Dimapur Bypass (Assam Part)
ANALYSIS OF RATES WITH BASIC ITEM RATES AND LOADING, UNLOADING & HAULAGE BASED ON LEAD Rate/t.Km
AS PER SOR 2013-14 FOR NATIONAL HIGHWAYS UNDER ASSAM P.W (BUILDING & NH) DEPTT, GOVERNMENT OF ASSAM Surface 3.50
Unsurface 4.20
Katcha 8.40
40mm 0.000
Stone
20mm 0.540 Cum 0.90 1.80 0.00 0.00 11.4 0 2.5 109.62
Aggregate
10mm 0.360
Cement Concrete
14.4 Cum 12993.00 1.00 Cement 0.407 Tonne 0.407 0.407 0.00 0.00 0 0 0 0.00 13130.71
wearing coat Grade M30
Coarse Sand 0.455 Cum 0.455 0.819 0.00 0.00 2.6 0 3 28.09
HYSD 1.05 Tonne 1.05 1.05 0.00 0.00 0 0 0 0.00
Binding wire (8Kg) 8 Tonne 0.008 0.008 0.00 0.00 0 0 0 0.00
Client :
NHIDCL FINAL DETAILED PROJECT REPORT
24 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for 4- laning of Daboka-Dimapur Section
(Length 130.167Km) of NH-36&39 - Dimapur Bypass (Assam Part)
Material Cost 53% of total cost for 60cm circular Sqm 0.283 2,226.00 (B)
Others Cost 47% of Total cost for 60cm circular (A-B) 1,974.00 ( C)
Material cost for 90cm Circular @ same rate sqm of 60cm circular Sqm 0.636 5,002.60 (D)
Client :
NHIDCL Final Detailed Project Report
27 Archtech Consultants Pvt.Ltd
Preparation of Final DPR for 4-laning of Daboka-Dimapur Section
(Length 130.167Km) of NH-36&39 - Dimapur Bypass (Assam Part)
Client :
NHIDCL Final Detailed Project Report
28 Archtech Consultants Pvt.Ltd
Preparation of Final DPR for 4-laning of Daboka-Dimapur Section
(Length 130.167Km) of NH-36&39 - Dimapur Bypass (Assam Part)
Client :
NHIDCL Final Detailed Project Report
29 Archtech Consultants Pvt.Ltd
Preparation of Final DPR for 4-laning of Daboka-Dimapur Section
(Length 130.167 Km) of NH-36&39 - Dimapur Bypass (Assam Part)
Client :
National Highways Infrastructure Final Detailed Project Report
Development Corporation Ltd. 31 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for 4-laning of Daboka-Dimapur Section
(Length 130.167 Km) of NH-36&39 - Dimapur Bypass (Assam Part)
Client :
National Highways Infrastructure Final Detailed Project Report
Development Corporation Ltd. 32 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for 4-laning of Daboka-Dimapur Section
(Length 130.167 Km) of NH-36&39 - Dimapur Bypass (Assam Part)
Ref : SOR
Brief Description of Item Unit Quantity Rate (Rs) Amount (Rs)
2013-14
12.1 Excavation for Structures
Earth work in excavation of foundation of structures as per drawinf and technical
specification, including setting out, construction of shoring and bracing, removal of stumps
and other deleterious matter, dressing of sides and bottom and backfilling with approval
material
12-1-(I)- (i) upto 3m depth Cum 12.179 65.00 791.65
A(a) (i)
12.8 Plain/ Reinforced Cement Concrete in Open Foundation complete as per Drawing and
Technical Specifications. Including steel shuttering formwork
B B. With plasticiser (Masterplast PL-1/SPL-2 or equivalent), air entraining and water
reducing plasticiser (Masterplast PAE or equivalent) and accelerating plasticiser
(masterplast ACPL or equivalent) conforming to IS-9103-1999.
(a) PCC Grade M15 Cum 0.739 0.00 0.00
13.5 Plain/ Reinforced Cement Concrete in sub structure complete as per Drawing and Technical
Specifications and steel shuttering formwork
B B. With plasticiser (Masterplast PL-1/SPL-2 or equivalent), air entraining and water
reducing plasticiser (Masterplast PAE or equivalent) and accelerating plasticiser
(masterplast ACPL or equivalent) conforming to IS-9103-1999.
f (i) RCC Grade M25
Case II With Batching Plant, Transit Mixer and Concrete Pump Cum 3.078 0.00 0.00
13.6 Supplying, Fitting and Placing un-coated TMTbar Reinforcement in sub structure Complete
as per Drawing and Technical Specifications
(a) From Primary Sources : TATA/SAIL/Esser Steel/Jindal Steel/ Shyam Steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement bar of Fe-500 N/mm2 Tonne 0.39 0.00 0.00
8.8 Painting Two Coats on new Concrete surface Sqm 66.46 55.00 3,655.13
Painting two coats after filling the surface with synthetic enamel paints in all shades on new
plastered concrete surface
13.1 Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as Cum 1.16 7,032.00 8,183.49
per drawing and technical specifications
13.3 Plastering with cement mortar (1:3) on brick work in sub-structure as per technical Sqm 67.97 126.00 8,564.14
specifactions
Client :
National Highways Infrastructure Final Detailed Project Report
Development Corporation Ltd. 33 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for 4-laning of Daboka-Dimapur Section
(Length 130.167 Km) of NH-36&39 - Dimapur Bypass (Assam Part)
Ref : SOR
Brief Description of Item Unit Quantity Rate (Rs) Amount (Rs)
2013-14
Building 1st class brick nogged wall in cement mortar including racking out joints and curing Sqm 19.88 653.01 12,981.84
SOR 2013- complete as directed in super structure above plinth upto 1st floor level (protruding M.S
14 rod/Tor steel of column to be embeded in cement mortar and will be mesured and paid
8.1.8 -A(a) separately (A) 112mm thick brick wall (a) In cement mortar in proportion 1:4
DSR 2014 Neat cement puning Sqm 1.51 41.40 62.62
13.18
Building Providing soling in foundation and under floor with stone/best quality picked jhama brick, Sqm 9.64 368.71 3,555.75
SOR 2013- sand packed and laid to level and in panel after preparing the subgrade as directed including
14 all labour and materials and if necessary dewatering, complete
4.1.1 (a) (a) brick on flat soling
Building 40mm thick cement concrete floor consisting of 25mm under layer of cement concrete in Sqm 7.39 405.53 2,998.39
SOR 2013- prop 1:3:6 (aggregate of 12.5 mm and down) and 15mm thick wearing layer in cement
14 concrete in prop 1:1:2 (aggregate of size 10mm down) finished with a floating coat of neat
5.1.3 cement finish using cement slurry for bond @ 2.75Kg per square metre of floor area, wearing
layer is to be laid in panels including curing etc. complete directed
Sub Total 40,793.00
Add 10% for letter writing and etc. 4079.30
Rate Per / No (In Rs.) 44872.30
Client :
National Highways Infrastructure Final Detailed Project Report
Development Corporation Ltd. 34 Archtech Consultants Pvt. Ltd.
Preparation of Final DPR for 4-laning of Daboka-Dimapur Section
(Length 130.167Km) of NH-36&39 - Dimapur Bypass (Assam Part)