JALUR POMPA TRANSFER DARI SMALL TANK KE FILLING

CP 1-2 SC 1

SC 2
CP 3-4

V8 V7

V2
V6
V1

V4
V5
V3
POMPA 1 POMPA 7
KAPASITAS TRANSFER

POMPA 1  SC 1, SC 2 MAX 24.000 Kg/Jam (langsung)

POMPA 1  CP1-2, CP3-4 MAX 13.000 Kg/Jam (lewat heating cooling)

POMPA 7  CP1-2, CP3-4 MAX 18.000 Kg/Jam (lewat heating cooling)

POMPA 7  SC 1,2 (pompa 1 off)

Mr. Jo