JACKING

ZONE/PIPE SIZE DURATION


15 MAC -06
ZONE 1A APRIL

225 193/1465
300
375 140/210
450 176/550
1050 5/3005
1500
TOTAL 514/5230

SHAFT MH
48a-Jln.Air Panas-
complete 34.1a & 15.0
on 3/4/17 (Dewatering)
(sheet pile installation) MH2 &MH3
MH37 Prima Setapak on going
(sheet pile installation) MH13-32/43m
on going on going
SI PILOTING
JLN. PRIMA SETRAPAK JLN.MATA AIR
(stop due to
MH1a-42-found power 132Kv
cable found)
MH
CCTV 38.1,MH39.1,
on going at-48A & MH 41.- done
1A-49