You are on page 1of 30
RasGas Company Limited [Operation [727-X03-001 [Operations Technic Revision: (0 [Static Equipment Engineering Sheet: 1 0f 29 TABLE OF CONTENTS Section Description Page Ref. 10 introduction ‘Signatory Page and Revision History Pee) Document Distribution List 3 20 Purpose 4 30 Scope | 4 40 Definitions 4 50 Cross References 60 Roles and Responsibilities 3 70 Process Descriptions 7 7A. General ea 72. TML Selection 7 7.3. TML& Test Spot Identification System 8 74,__Level OF UT Coverage AT TML 9 80 ‘Training and Support " 9.0 Verification and Measurement " 10.0 | Feedback and Continual Improvement " 11.0 | Attachment 2 Custodian of this Document: Head of Programmatic Engineering Owner of this Document: Static Equipment Engineering Manager RasGas Company Limited Internal Control Validation To assure Management's, Shareholders’ and External Agencies’ confidence in Company's policies and practices; RasGas Internal Audit may verify without notice, compliance with this Document. Signature Page and Revision History Prepared by: MIE Parasaraman Munuswamy Programmatic Inspector Endorsed by Endorsed by: Kz aS C4 25/05 Cecilie A Haarseth Date Head of Programmatic Engineering Approved by: tee — 23/079 Dr- Ayman Abdalla Date Ser Manager Revi Ahora Res Ganget | Cima Re Toate an adored | adered | Approved aie ca oa U Date a Edel Haarseth Abdulsalam_ sanomary renion 5 | oat % Designo Key Chua Taran} Fara el oe 1 ae ae RasGas Use Only Issue Date: Last Sign Date RG RasGas Company Limited Document Distribution List ‘The Distribution List shows current users of this document. Users will be provided with the data link for this document. To receive an electronic copy, contact the Head of Documents / Standards. Job Title Section/disci ‘SEE Manager Static Equipment engineering Head of Integrity Engineering Integrity Engineering Head of Corrosion Engineering | Corrosion Engineering Head of Programmatic Engineering | Programmatic Engineering Head of Operation Manufacturing Maint. Supt. Static Equipment... | Filed Maintenance Maint. Supt. Offshore-RGA Offshore maint. RGA Integrity Engineers & Inspectors | Multiple Programmatic Engineers/Inspectors_| Multiple ‘Corrosion Engineers/Technicians | Multiple NDT personal Multiple Document Nor TOOT evan Nord Tee sat Document Part 000 Rasta Use Only Issue Date: Last Sign Date RasGas Company Limited RasGas 2.0 Purpose ‘The objective of these technical guidelines is to define and standardize the ultrasonic thickness gauging of in service piping circuit in Rasgas facilities. The document intent to provide uniform criteria on selection of TML (Thickness Measurement Location) and enable to optimize the level of UT coverage on piping components depending on the criticality and record in a systematic format for corrosion rate and FFS related calculations. 3.0 Scope This technical document shall be used for onshore and offshore piping circuit with size shes dia. and higher to measure and record thickness at identified locations. Piping below 2” size shall be inspected using profile radiography or any other suitable NDT for thickness check. The UT gauging practice specified in this document is limited to manual ultrasonic thickness gauging method. It covers three levels of UT coverage namely; Level 1, Level 2 and Level 3 at identified TML by manual UT method. Level | and 2 have been established for the routine survey of pipe work to predict uniform thickness loss. Level-3 coverage is for more detailed measurement of thickness loss due to erosion and corrosion mechanism and doing FFS related calculations. 4.0 Definition Ultrasonic Thickness Gauging- Measurement of wall thickness using manual digital ultrasonic thickness gauges based on pulse echo contact method. ‘Thickness Measurement location (TML’s) ~ Designated areas on piping systems where periodic inspections and thickness measurement are conducted. Test point- An area defined by a circle having diameter not more than 2 inches (50mm) for a line diameter not exceeding 10” and not greater than 3 inches (75mm) for larger diameter piping, Piping cireuit- A section of piping that has all points exposed to an environment of similar corrosivity and that is of similar design conditions and construction material. NDT- Non Destructive Testing UT- Ultrasonic Thickness FES- Fitness for Service Injection Point: Locations where relatively small quantity of materials are injected in to process streams to control the chemistry or other process variables. Injection points do not include locations where two steams join Document Nor T27X0B-00T Revision Nor Sheet Fat Document Part: 000 RasGas Use Only Issue Date: Last Sign Date RasGas Company Limited RasGas Dead Legs: Components of a piping system that normally have no significant flow. 5.0 References American Standards ‘ASME B31.3 Process piping code API5S70 Piping inspection code. APIRP S74 Inspection guidelines for piping system components. APIRP 579 Fitness for service. ASME V ‘American Society for Mechanical Engineers ~ SE-797; Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse~ Echo contact method. ASME B31G Manual for Determining the Remaining Strength of Corroded Pipelines. RasGas reference documents Ultrasonic Thickness gauging procedure for Piping [Doc.No. T27-X03-002] RG piping Integrity Manual. [Doc.No. T12-X01-007], Pressure equipment Integrity Manual [Doc.No. T13-X01-003] ‘TMEE062 EM maintenance Practice Manual 6.0 Roles And Responsibilities Static Equipment Manager is the Owner of this document and Head of Programmatic Engineering is the Custodian of this document. Refer RASCI chart for the detailed R & R pertaining to UT function of piping: Dovuncat eo TETXOOOT Teviion Nar eect Sot ocament Part: 000 RasGas Use Only Issue Date: Last ign Date RasGas Company Limited Approval and review of effectiveness of the std. practice Document custodian, Monitor the revisions. Periodic review of documents for improvements, updating, and developments based on feed back A Ensure alignment within various discipline of SEE to implement the std. practice in all piping UT. A Prepare UT work pack with TML & level of UT ‘coverage as per std. practice Review of UT report and determine requirement of Level 3 coverage Review of UT level 3 coverage reports and determine FFS requirement. Perform FFS ‘Authorization for return to service following FES Provide repair / replacement plan | Documentation of UT inspection data in | Meridium Coordinate training specific to the application of this practice for Piping UT program. Document Nor THNOSOOT ecament Part: 000 Saect Go Issue Date: Last Sign Date 7.0 1 72 3) RasGas Company Limited Process Descriptions General The general requirements of Inspection personal, work procedure, equipments, reporting and procedure qualification etc. for the work shall be as per RG Piping Integrity manual no. T12-X01-007 and Ultrasonic Thickness gauging Procedure no. ‘T27-X03-002. Refer Appendix-A-Piping UT gauging practice work flow for the details of various activities and decision making matrix in UT inspection. TML Selection Guidelines for selection of the TML for thickness measurement in piping components shall be as per RG piping ES, and RasGas piping integrity manual no. T27-X01-007. The following recommended practice should be used while selecting a TML’s in piping circuit to monitor uniform corrosion. However, consideration shall be given based on the specific experience for selecting more TML as per the advice of SEE engineer. For localized corrosion, guidelines per RG piping integrity manual to be referred for TML selection. + TML’s located on 50% of the components including a representative number of fittings and straight runs for level of inspection —High. * TML’s located on 10% of the components including a representative number of fittings and straight runs for level of inspection - Medium. * TML’s located on 10% of the components including a representative number of fittings and straight runs for level of inspection - Standard. ‘* Chemical injection point shall be considered as a separate circuit and extent of ‘TML shall be as per RG piping ES recommendation. UT coverage details as per figure- 7. * Special consideration shall be given for dead leg inspection as per RG piping ES recommendation and thickness coverage shall be per fig 6A. &6B. In addition, the following specific criteria are recommended for selecting monitoring locations at elbow while selecting TML’s for piping component as per above: * 100% of the lower elbows shall be selected as TML in a vertical circuit with downward flow direction as shown in figure-A, while min 10% or more of the "upper elbows may be selected as TML. Document Nor TE7-NOSOOT Document Part 000 Sheet Toray Issue Date: Last Sign Date RasGas Company Limited + Min. 30% or more of the lower elbows shall be selected in a vertical circuit with upward flow direction and min. 10% or more of the upper elbows as ‘TML as shown in Figure-A. ‘© When the circuit is horizontal, minimum 10% or more of the elbows shall be selected as TML. 7.3 TML & Test Spot Identification System 7.3.1. TML Identification: * In order to ensure that the thickness of the pipe work can be accurately recorded for determination of corrosion rate and next inspection frequency, it is important that the TML’s are properly identified with a numbering system. The TML location identification will be marked on the isometric drawing with level of coverage required, which will be include in the piping UT work pack. © TML numbering will start from upstream to downstream of flow direction and numbering will be continuous with component and spot identification. ‘© The following abbreviation shall be used for identification of TML with type of piping components followed by test spot identification number ~ SP- Straight pipe. EL- Elbow or bend BR- Branch connection area DL- Dead leg TE -Tee connection CR- Concentric reducer ER- Eccentric reducer EP- Expander CD - Chemical Dosing point Eg. Measurement location identification: XXX SP XX ‘TML NO. ‘Test spot identification Component type 7.3.2. Test Spot Identification * In order to ensure that the thickness of the pipe components can be accurately determined at subsequent inspections it is important that the test spots within the TML are recorded and reported in a clear and unambiguous manner. Docoment Nor TETXIOOT Revivon Noro Tees Bat Decument Part 000 RasGas Use Only Issue Date: Last Sign Date RasGas Company Limited ‘© TML will be identified on the isometric drawing include in the piping inspection package. Test spot will be marked on the isometries near TML & thickness report as per actual site condition. Also, at site, a marking of test spot with high temperature solid paint marker or Inspection label will be done to identify the test spot location. ‘© Test spots for the spot measurements (level-I) around the circumference of horizontal, angled pipe component shall be recorded using an angular notation with 0 degrees at the top and reading to 360 degrees in a clockwise direction as viewed facing the direction of flow (ref Fig 1a). For vertical pipes /components, angular notation shall start at plant north face and proceeding clockwise direction. ‘* The spot shall be a circle area having dia. Not more than 2” (50mm) up to line size 10” dia. Line size and not more than 3” (75mm) in hi ‘+ Refer table attached to the each figure for spot identification for measurement 74 LEVEL OF UT COVERAGE AT TML ‘There are three types of thickness measurement is considered for identified TML’s to cover the whole component. These types are called UT coverage namely; Level 1, Level 2 and Level 3 will be specified in the respective isometries of UT work pack. Required level of coverage at particular TML is specified by the concerned Engineer/Inspector in consultation with Corrosion engineer. Level | and 2 have been established specifically for the routine UT survey of pipe work. Refer Appendix-A; UT guideline work flow for decision making sequence for various level of UT coverage at TML. The results of the level | and 2 tests shall be subjected to review and where this identifies the need for additional and more detailed testing; level-3 shall be applied. Level 3 (Grid scanning) is specifically for the detailed survey of thickness loss due to erosion / corrosion of piping components. Level3 should be used in circumstances where the engineering review of the Level | or 2 has identified the need for more data for FS calculation per API RP 579, 7.4.1 LEVEL-I COVERAGE (L-1): ‘The thickness of the pipe component shall be determined by single spot measurements at four equally spaced angular positions (0°, 90°, 180° and 270°). The spot shall be a circle area having dia. not more than 2” (50mm) up to line size 10” dia. and not more than 3” (75mm) in higher sizes. The minimum thickness ‘observed by scanning within the test spot should be recorded. The test positions surveyed for different type of components with respect to flow direction are given in Figure 1a, 2a, 3a, 4a, Sa & 7. Document Nor TETXIBOOT Revision Novo Teeee ot Document Part 000 RasGas Use Only Issue Date: Last ign Date RG RasGas Company Limited 742 LEVEL-II COVERAGE (L-2): ‘The thickness of the pipe component shall be determined over a 100 mm wide band around the full circumference of the pipe. This shall be done using continuous scanning. The minimum and maximum thickness values and their axial and angular locations shall be recorded. In addition, the thicknesses shall be recorded at four equally spaced angular positions along the circumferential centre line of the band as ; 0° , 90° , 180° and 270°. The positions to be surveyed for different type of components with respect to flow direction are given in Figure 1b, 2b, 3b, 4b, Sb & 7. 7.43 LEVEL-IIl GRID SCANNING) COVERAGE (L-3): ‘The pipes shall be scanned in a grid configuration which shall be centered at the position of minimum wall thickness (i.e. the thinnest location in the pipe wall about which data is being collected shall be in the centre square of the $ x 5 grid), ‘as determined by either level | or 2 survey and as directed by Engineer/inspector. The testing grid shall be set up on the following basis: Pipes less than 250 mm OD - 25 mm spacing (25 x 25 mm square elements) Pipes 250 mm and greater OD -50 mm spacing (50x 50mm square elements) The grid spacing may be changed from that given above as per site condition in discussion with Engineer / inspector. ‘The grid shall be aligned with the pipe axis and shall consist of 25 (5 x 5) square elements of the above sizes. Each element shall be continuously scanned and the ‘maximum and minimum thickness values recorded. ‘The positions to be surveyed in different type of components are given in Figure 1c 744 REPORTING The thickness reading shall be reported in the standard thickness report format no. T27-X08-001 with relevant details like level of coverage, axial & angular locations of test spot against each TML. TML’s of each line (piping circuit) will be input in to the data base system; Meridium software for measurement data entry in each inspection. Revison Nor Document Pat: 000 Rasas Use Only RG RasGas Company Limited 8.0 Training And Support ‘The performing party (NDT contractor) shall be a trained and certified personal per ASME Sec V / SNT-TC-1A and will undergo familiarization of this standard practice before start of actual job. In addition, NDT contract personal shall under go all RG safety training programs to carry out the job as per standard procedure in a safe and responsible manner as per the RasGas work procedure & SHE guidelines. The procedure user, who is qualified for performing activities within this document, will be able to indicate, recognize and react to the following: * Understands the necessity of precautions and special work rules while working at height. © Understands and trained in using Permit to Work and Emergency Procedures. 9.0 Verification And Measurement Verification for compliance of these guidelines at work will be performed periodically by Head of programmatic Engineering. Verification will, generally, address compliance of this recommended guidelines, quality, and safety during or after the following activities: * Field inspection Activities Planned audits ‘+ When interim directives such as safety alerts ‘Incident Investigation and analysis, 10.0 Feedback And Continual Improvement Head of Programmatic (UT Program Owner) or his/her designee performs a formal review of this document every three years or as required to ensure this, guidelines are updated; prior recommendations for enhancements, revisions and corrections have been made and that training is adequate for all users. User feedback and process reporting can occur at any time because of various activities within RasGas at either the department or corporate level. Some common feedback and process reporting that occurs as a result of formal / informal audits, meetings, and user experience. Recommendations for changing this document are made by the user to either enhance practice or to identify and rectify problem areas. Change recommendations are submitted by the initiator to Head of Programmatic Engineering Docemeat Nor TAUB @OT Tevioa Nod Tee Tat Document ar: 00 Rance te Oly Issue Dat: Last ign Date RasGas Company Limited Appendix-A PIPIN IN E WORK FLOW CHART Continued on Sheet 2.4) Continued on Sheet 2(8) Doane re Sheet tof 2 Docomentartono__Raas sens RasGas Company Limited ‘Continued from Sheet (A) ina from Sheet 1) 0) ve Key to symbols ‘a= actual thickness determined by UT {, = minimum installed thickness (Schedule thickness ~ 12.5 %) tain “minimum code thickness (ASME B313) Sheet2.0f 2 Document Nov TH -NOEGOT eviion Nor Seer ot Document Part 000| RasGas Use Only Issue Date: Last Sign Date RasGas Company Limited General TML selection c1 ria in piping cireuit (The existing RG practice for TML selection in piping circuit) Docameat Ne: THTIS-OOT Teviion Nor Sreee Toot Document Part: 000, asGas Use Only Issue Date: Last Sign Date RasGas Company Limited ® (A S907 MASURMENT 20 © ro oF Ao STE Nom) PQURE 1A — STRAGHT PRE LEVEL 1 SURVEY LOCATIONS LOCATION SPOT NUMBER NOTE - ° ola ‘Spot measurement & record wall thickness 9° a Spot measurement & record wall thickness 180° a Spot measurement & record ‘wal thickness 270" ofa ‘Spot measurement & record - wall thickness Tevhion Noro acumen Part: 000 RasGas Use Only Seeee Sof Issue Date: Last Sign Date RasGas Company Limited Document Part 000 Rastin Use Only RasGas o= F 0p oF PE OF SITE NORTH) Z Soya wows sama o Ola ‘Spot measurement & record wall thickness 90° 02a ‘Spot measurement & record wall thickness 180° 03a ‘Spot measurement & record wall thickness 270° 04a ‘Spot measurement & record wall thickness. —_—. On Issue Date: Last Sign Date &G RasGas Company Limited [MINIMUM WALL THICKNESS DETERWINED BY LEVEL 1 OR 2 SURVEY EACH SQUARE IN GRD TO ‘BE CONTINUOUSLY SCANNED FIGURE 1C — LEVEL 3 SURVEY LOCATIONS LOCATION SPOT NUMBER | NOTE. Grid position 14 1aota 1Ao2a Sean & record minimum and rma wal thickness Grid postion 18 19016,180% Sean & record minimum and maximum wall thickness te. to rd postion ES Corresponding cel 0. spot no, | Sean & record minimum and maximum wall thickness Tevivon Nos ‘eect Tot Document Part 000 RasGas Use Only "Issue Date: Last ign Date RG RasGas Company Limited RasGas- (90° oF RE on STE NRT) ao —— ban LEVEL 1 SURVEY LOCATIONS LOCATION SPOT NUMBER ° Ola ‘Spot measurement & record wall thickness 90° 2a ‘Spot measurement & record wall thickness 180° Ga ‘Spot measurement & record wall thickness 270° 4a ‘Spot measurement & record wall thickness Document Nor THT-NOOOOT Reviion Noro Secs vot Document Part: 00 Rass Use Only Issue Date: Last Sign Date RasGas Company Limited BEI cONTNLOUS SEAN (A= 01 woasunce er t (TOP OF PRE OR SITE NORTH) i ao, ueE® TIGURE 28 — CONCENTRIC LEVEL 2 SURVEY LOCATIONS. REDUCER/EXPANDER- LOCATION srorno. [Nore O BpederRaie Oia Spat mara & rd wal ces 90° Expander/Reducer 02a ‘Spot measurement & record wall thickness 180° Expander/Reducer 03a ‘Spot measurement & record wall thickness 270 Ege ot Spotnnrene rd val ike 0" ie ran os Sean cord Ninna al des & Urumicowcctenpaneredcrors | Suen tad al wih he pas Sen nna es 0° Outlet Pipe O1b E ‘Spot measurement & record wall thickness 99 Oe Pie os Spain & ed val ces 10" Owe Pe oe Shatner val ees | 270° Outlet Pipe 4b ‘Spot measurement & record wall thickness 100mm vide endacend ose Scand cord Ninna al des & | Stes e 2 Seca Sean ordain val ics 2 | Senn eT ns xaeae Document Part 000 RasGas Use Only Issue Date: Last Sign Date RG RasGas Company Limited RasGas a (A= SPOT MEASUREMENT SPOTS MEASURED AT PONT AROUND BxtRA008 OF BEND SPOTS, MEASURED HALE \ ‘WAY BETWEEN WiOPONT IND GomsTRen” END oan (FoRZOWAL BENDS ONLY) vxreanos Brmoos oreo oa Borrow oF BEND (oezowiAL BENDS ONLY) FIGURE 3A — BEND LEVEL 1 SURVEY LOCATION LOCATION SPOTNUMBER | NOTE Mid point of extrados of bend | Ola ‘Spot measurement & record wall thickness | Mid point ofintrados ofbend | 028 ‘Spot measurement & record wall thickness Half way along extrados between | O1b ‘Spot measurement & record wall thickness the mid point and the downstream end of the bend Half way along intrados between | 02b ‘Spot measurement & record wall thickness the mid point and the downstream end of the bend Horizontal bend mid point of | Ole ‘Spot measurement & record wall thickness bottom of bend Horizontal bend - bottom of bend | 02¢ ‘Spot measurement & record wall thickness | hatrway between the mid point | and the downstream end of the | bend Document Nor THT-ROOGOT Reviion Noro RasGas Use Oaly eects oto Issue Date: Last Sign Date RasGas Company Limited UNE Som WORZONTAL BENDS. ay reapos. oF aN FIGURE 38 ~ BEND ~ spor weasureuen| Ga 2S SPOTS MEASURED HALE "WA BETWEEN MDPONT oF and BOTTOM OF 8X0. (ORZONTAL BENDS ONY) ae ‘arrow oF aN (Gemzonia, B20 OW) LEVEL 2 SURVEY LOCATIONS LOCATION SPOTNO. | NOTE ‘Mid point of extrados of bend Ola Spot measurement & record wall thickness Mid point of intrados of bend @a Spot measurement & record wall thickness Mid point of extrados Ga Scan & record Min. wall thk. & location 4a Scan & record Max. wall thk. & location. Half way along extrados between the mid | O1b Spot measurement & record wall thickness point and the downstream end ofthe bend Half way along intrados between the mid | 02b ‘Spot measurement & record wall thickness point and the downstream end of the bend Half way along extrados between the mid | 03b ‘Scan & record Min. wall thk. & location. Point and the downstream end ofthe bend | gg Sean & record Max. wall thk. & location Horizontal bend - mid point of bottom of | Ole ‘Spot measurement only for horizontal bend bend Horizontal bend - bottom ofbend half way | 02¢ ‘Spot measurement only for horizontal bend between the mid point and the downstream | end of the bend | Horizontal bend - bottom of bend 03e ‘Scan & record Min. wall thk. & loc | o4e ‘Scan & record Max. wall thk, & location Document Nor TET-NODOOT Tevivon Nor Sheet Tot Document Pa 000 RasGas Use Only Issue Date: Last Sign Date RasGas Company Limited (A S07 wersuReWeNT LEVEL 1 SURVEY LOCATIONS OFFTAKE LOCATION SPOT NUMBER | NOTE a (Main pipe (section A) ola ‘Spot measurement & record wall thickness 90° Main pipe Oa ‘Spot measurement & record wall thickness 180° Main pipe Ga Spot measurement & record wall thickness 270° Main pipe Oa ‘Spot measurement & record wall thickness @* _Offtake pipe (section B) | O1b ‘Spot measurement & record wall thickness [90° offtake pipe 2b ‘Spot measurement & record wall thickness 180° Off take pipe 036 ‘Spot measurement & record wall thickness 270° Off take pipe 4b ‘Spot measurement & record wall thickness pipe bottom opposite to off | Ole ‘Spot measurement & record wall thickness 0) ee | eee ee ee ee Document Nor TETNOOOOT Reviion Noro Seeek Bot Document Part: 000 RasGas Use Only Issue Date: Last Sign Date RasGas Company Limited 1 @ = =O LOCATION spot no. _| NOTE O° Main pipe (seotion A) ola ‘Spot measurement & record wall thickness 90° Main pipe Oa ‘Spot measurement & record wall thickness 180° Main pipe Ga ‘Spot measurement & record wall thickness 270° Main pipe ofa ‘Spot measurement & record wall thickness Main pipe downstream of offtake | OSa ‘Scan & record min. wall thickness & location Main pipe downstream of ofFtake | 06a Sean & record max, wal thickness ocation 0° _Offtake pipe (section B) ob Spot measurement & record wall thickness 90° Off take pipe 02 Spot measurement & record wall thickness 180° OFF take pipe 035 Spot measurement & record wall thickness 270° OFF take pipe 04 Spot measurement & record wall thickness ‘Off take pipe downstream of main pipe | O86 Sean & record min. wall thickness& location ‘Off take pipe downstream of main pipe | O66 Scan & record max. wall thickness& location Main pipe bottom opposite off take | Ole | Spot measurement & record wall thickness Cente ine (C) Docemeat Nor TROUT evan Noro Tieee Bon Document P 000 RasGas Use Only {ssue Date: Last Sign Date < RasGas Company Limited RasGas ca ST wosvREWeNT & (comane as oF re 270 90 270 180, FROURE 5A — TEE PIECE LEVEL 1 SURVEY LOCATIONS LOCATION | SPOTNUMBER [NOTE 3° On ceneine of T branch | Ota Spot measurement & record wal hekness {80° On centric of T tench | O28 Spot measurement & record wal ieknes ee Spot messuremen record wal ens @_Tupaream ofoutet weld | o1b Spot measurement record wal eines oF T uparean of let weld | 2 Spot measurement record wal eines TROT prem of oulet weld [ 8 Spot mearenent reco wall i 270° T upstream of outlet weld ‘o4b ‘Spot measurement & record wall thickness 0 Oulet pipe downseam off [Ole Spot measrement& record wall chest weld [oor Onin downstream FO Spot measurement & record wal thickness | | weld | 180° Oulet pipe downstream oft | O86 Spo measurement reno wall kes | weld | 270° Outlet pipe downstream of T | O4e | Spot measurement & record wall thickness weld Document Nor TI7-NOOOOT Document Part 00 Revision Novo RasGas Use Only Seeee ot Isgue Date: Last Sign Date RasGas Company Limited RasGas ‘A 570T weASuRENENT ‘CONTINUOUS SAN |} - 9, ES (ComREUNE OR Aes OF Te 20 180° FIGURE 58 — TEE PIECE LEVEL 2 SURVEY LOCATIONS LOCATION srorNo. | NOTE Main pipe opposite T inlet on ‘Continuous sean & esord min thickness & location Main pipe opposite Filet 02a Continuous scan & record max thickness & location OF Tupstream oFoutet weld | O1b ‘Wall thickness 90° Tupstream oFoutet weld | O2 Wall thickness 180° Tupateam ofoutet weld | 038 Wall hikness 270°T upstream ofoulet weld | OMB Wall thickness 700 mam wide band around 056 ‘Sean & record Min. wall thickness & angular position Corral Rela 06 Scan & record max. wall thickness & angular poistion © Ouletpiped/sofT weld | Ole Wall thickness ‘90° Ouiletpipe d/s oft weld | 2 ‘Wall thickness 180" Outlet pipe d/sof TF weld | O° Wall thickness [270° Outet pipe d/sofT weld | OF ‘Wall thickness 100 mm wide band around 05 Sean & record Min, wall thickness & angular position circumference of Tee ora band the na waadate ental occas | 0 Sean & record max. wall thickness & angular position the iting, whichever is the lesser Horizontal T—bottom of main pipe | 1d Sean & record Min. wall thickness & location | oad oa Scan & record max. wall thickness & location Document Nor THNO3-00T Tevaion Nor Tees Document Part: 000 RasGas Use O Issue Date: Last Sign Date RasGas Company Limited 20. 180 sect, o (UPSTREA CENTRELNE | | OF WAN PIPELNE) S oo FIGURE 6A — DEAD LEG LEVEL 1. SURVEY LOCATIONS LOCATION SPOT NUMBER NOTE 100 mm from stagnant end | Ola ‘Spot measurement & record wall thickness 100 mm from stagnant end | 02a ‘Spot measurement & record wall thickness 180° 100 mm from stagnant end | 03a ‘Spot measurement & record wal thickness 270° 100 mm from stagnant end | 04a ‘Spot measurement & record wall thickness 100mm from active pipe | O1b Spot measurement & record wall thickness 90° 100 mm from active pipe | 026 ‘Spot measurement & record wall thickness 180° 100 mm from active pipe | 036 | Spot measurement & record wall | thickness 270° 100 mm from active pipe | O4b ‘Spot measurement & record wall thickness ‘Document Nor T27-NOBOOT Teviion Nevo Document Part: 000 RasGas Use Only tssue Date: Last Sign Date RasGas Company Limited ze. c (UPSTREAM CENTREUNE (OF WAN PPELNE) © ‘A. SPOT MEASUREMENT RAA- CONTINUOUS SCAN oo 180 scum ¢B) FIGURE 68 — DEAD LEG LEVEL 2 SURVEY LOCATIONS LOCATION — | Spot umber _ NOTE © 100mm from stagnant end | Ota Wall thickness 90° 100 mm from stagnant end_| 02a Wall thickness 180° 100 mm from stagnant end | 03a Wall thickness 2707 100 mm from stagnant end_| 04a Wall thickness 100mm wide band at 100 mm | 05a ‘Sean & record minimum wall from end of dead leg thickness & angular position 100 mm wide band at 100mm | 06a ‘Sean & record maximum wall from end of dead leg. thickness& angular position 0 100mm from active pipe | O1b Wall thickness 90° 100 mm from active pipe | 02b Wall thickness 180° 100 mm from active pipe | 03b Wall thickness 270° 100 mm from active pipe | 04b Wall thickness 100 mm wide band at 100mm | OSb Scan & record minimum wall, from active pipe thickness & angular postion | 100 mm wide band at 100mm | O6b San & record maximum wall from active pipe thickness & angular position Document Nor THAOSOOT Document Part: 000 Revision Nod RasGas Use Only RasGas Company Limited a ~ SPOT MEASUREMENT Higher of 12" oF 9" change Ta ow 30 o (TOP OF PIPE OR SITE NORTH) 270° 90° 180" ssc FIGURE 7 — CHEMICAL (DOSING) PeenonI PORT) LEVEL 2 SURVEY LOCATIONS Document Nor TF7-NOOGOT Revision Noro She Dora Document Part 000 RasGas Use Only Issue Date: Last Sign Date RasGas Company Limited FIGURE 7 - CHEMICAL INJECTION CIRCUIT; LEVEL-2 SURVEY LOCATION ‘TML &SPOT No. NOTE ©° upstream of injection point | OO1CI Ola Spot measurement & record wall thickness 90° upstream of injection point | 001CI 02a Spot measurement & record wall thickness 180° Downstream ofinjection | 0O1C1 03a Spot measurement & record wall thickness point 270° upsircam of injection point_| OOTCT Of ‘Spot measurement & record wall thickness alin Fas proee to tfesson) | 0021 Ole Spot measurement & record wall thickness 0 Dowaream of necn pin | OCI OTs Spore sod wal WiRES 90° Downstream of injection | 003CI 02a ‘Spot measurement & record wall thickness point 180° Downstream ofinjection | OO3CT 03a Spot measurement & record wall thickness point 20° Downstream oF injection | OO3CT O48 ‘Spot measurement & record wall thickness Point evson Nos Sees Tato RasGas Use Only Tsou Date: Las Sign Date i componerin TF HOS-001 '* 10/02/09 a nee: Date | Comments Signature Completed W/N) natin L{Deianoteon ce bag tgogfon, Dae. Rabon Tkram ul Haq [| [| 4/2/04 c(stes| y | Samabhe.| [2 | Peet sotimen rE Ce wet ye 121304 5/364 | |

You might also like