You are on page 1of 3
EI Seif Engineering & Contracting Co ELSEIF COST CONTROL CC-DP-06 PROJECT COST MONITORING & CONTROL CONTROL! Prepare Dasgatos Senate Dates Kata mtoniaain | Projects Convatmtamger | XLelVL- | 25yjiy Revival Dasgnat Siar Date Hans Wenkentach | COO/ VP. Infrsstructure EE | rldoslu ‘Approve Dasa Di AbdulaiAI Khamis | President AN BSc Bngineeing Contracting Co. PROCESS ‘Registration No cc-DP.06 ‘COST CONTROL - Revision No, 0 Project Cost Monitoring & Control Date, 28 Mar 2011 PRCC.08 Project Cost Monitoring & Conta Process Owner | Head Project Conta Page tof [6ONTROLLED | COPY BA Bnginering Contracting Co PROCESS ‘Registration No CC-DP-06 COST CONTROL - Revision No CF Project Gost Monitoring & Control Date 28 Mar 2011 Process Related KPI NA Process’s Steps Narrative: et 62 63 64 65 68 Project Control Head reviews the project wise cost control parameters (ie. manpower cost, material cost, equipment cost and subcontractors cosl) received from different BU project control functions Project Control Head consolidates the project cost control parameters across all BU projects, Project Control Head sends the summary of project cost parameters to the Chiet ‘Operating Officer for his review, Project Control Head identifies potential isk fo the overall project and report ito the Chie ‘Operating Officer. Chief Operating Officer reviews the project cost parameters and potential risks as reported by Project Control Head, Cif Operating Officer instructs the Vice President (BU) / Project Directors to take the appropriate actions. Page? of 2

You might also like