T
he launch of the Jawaharlal
Nehru National Solar Mission
(JNNSM), which envisages
the generation of 20 GW of power
by 2022, has given a big impetus to
the solar energy market in India. To
accomplish this, the government is
taking all necessary steps to boost
both grid and off-grid solar seg-
ments.
By December 2010, 30 compa-
nies were granted permission to
generate 5 MW each, adding up to
a total of 150 MW of grid connected
solar PV power. An additional 350
MW of solar PV power projects
will be allotted during 2011-12.
For Stage II of the Mission, the
minimum capacity of a single PV
plant is restricted to 5 MW while
the maximum capacity has been
raised to 20 MW. To tap the poten-
tial of this technology, there needs
grid business
government. While, on one hand,
the government needs to create an
ecosystem to develop the segment,
the players need to develop the
right technology to ensure financial
returns, while maintaining quality. Solar grid business offers good opportunities for SMEs as well
As a result of the Mission and as large enterprises. The government should ensure that SMEs
the successful completion of the first benefit from this business as much as big corporate enterprises.
stage, it is expected that solar PV- However, to enter and explore this field, players need to
based power plants will become an understand and focus on some key requirements
exciting business opportunity. Build-
ing a solar grid connected plant and By Richa Chakravarty
selling energy to obligated entities
as defined by the Central Electricity SMEs can take this opportunity Components of grid
Regulatory Commission under the and get into the power generation connected business
Renewable Power Obligation (RPO) business. The ministry of MSMEs Right technology mix: As the sun
rules, is fast emerging as a good (micro, small and medium enter- shines on solar panels, they gener-
investment option. The Ministry of prises) should seriously use this op- ate DC electricity. This DC current
New and Renewable Energy (MNRE) portunity to ensure that SMEs benefit is routed into the inverter that con-
has issued a number of guidelines from this as much as big corporate verts it to AC electricity, the same
around solar and solar grid power enterprises. However, to enter and as the conventional electricity sup-
systems, which can easily be ac- explore this new opportunity, play- ply. Thus, a grid connected solar
cessed and downloaded from http:// ers need to understand and focus on plant is a combination of various
www.mnre.gov.in/ some key requirements. componentsphotovoltaic panels,
is an important aspect to consider. power plants is that an unusually mated costs can easily vary from Rs
Feeding power at high impedance large area is required for each kilo- 150-250 million per MW capacity.
nodes will cause immediate power watt of power. As much as 1 sq m The total investment as per JNNSM
quality improvement. Consider a of space is needed to generate 100 target of 2000 MW is about Rs 400
10 to 50 kW solar plant in an area W of peak power. The location has billion. Financing of solar energy
near a town, feeding power into to be such that there are no trees projects in India is a huge problem.
the local lower voltage grid. This and tall structures casting shad- During the first phase of the solar
will immediately improve the sta- ows on a solar array. The place mission, many companies failed
bility and reliability of the power also needs to be secure and free to get licences as they could not
available to the local people served from bird and monkey menace. meet financial closure amounts.
from that feeder. In such a case, It is easier to find such locations Power purchase agreements (PPA)
many local investors will come in barren non-arable land around are another obstacle in funding
forward to invest in several smaller towns and rural areaseach ac- projects. JNNSM provides for a
power plants within a town or a commodating plants of 10 to 100 trader PPA with NTPC Vidyut
village. Investment in these plants kW plants. Vyapar Nigam Ltd, which passes
will also be profitable if the govern- Strong financial backing: Costs on the risk of a default by state dis-
ment buys power from these plants involved in setting up a solar power coms to the developer. Given that
at the same rate that it currently plant are multiple which can be in many state discoms are notorious
pays to big plants feeding power terms of time, money, effort and for delaying payments and even
into the 33 kV grid. knowledge. In terms of money, defaulting, financial institutions
Right location of the plant: developing a solar power plant and banks refuse to consider these
One major problem with solar requires a huge investment. Esti- PPAs bankable.