Professional Documents
Culture Documents
100-assembly engine
10 Rakit Stack ke Boiler Bench 1 65 98% 95%
20 Rakit Boiler ke Chasis Bench 1 30 98% 95%
30 Rakit Cab & Tender Bench 1 30 98% 95%
35 Keringkan lem Rack 285 98% 95%
Total Keseluruhan
caboose total
95 380
0 240
95 380
190 1000
9.94
3.32
3.18
3.37
n 19.82
3 routing sheet Febrication
Kapasita
Avaibility
Nama s mesin
No Nama Operasi
mesin
120 BOILER
10 Rampas bagian bawah Jointer 130 98%
20 Potong panjang 4,5 Circle Saw 190 98%
30 Amplas ujung Disc sand 110 98%
40 Drill lubang 1/2" D 3/4" Drill Press 80 98%
121 - stack
10 Potong panjang 1,5 Circle Saw 150 98%
20 Amplas ujung Disc Sand 140 98%
Total Keseluruhan
kapasitas Jumlah Jumlah Jumlah Waktu
Efisiensi reject
mesin yang yang mesin proses
harus
mesin(%) aktual diharapkan teoritis (menit)
disiapkan
131
133
141
144
1/4" 231
233
431
433
135
335
1/2 "
435
110
210
3/4"
410
2" 330
KETERANGAN SPESIF
an Rough Lumber
LEBAR (inch)
2
2.5
2
2
5 Routing Sheet Pre-Pabrikasi
Kapasita
NO. NAMA OPERASI NAMA MESIN s Mesin availibity
Teoritis
Total Keseluruhan
jumlah jumlah
Kapasitas jumlah WAKTU
yang yang
efesiensi Mesin Reject mesin PROSES
diharapka harus
Aktual teoritis (MENIT)
n disiapkan
Kapasitas
Nama availabilit
No. Nama Operasi mesin teoritis
Mesin yMesin
(unit/jam)
1 Rough Lumber 1/4" (4 bagian per ketebalan 5/4")
Kapasitas
Nama Availabilit
No. Nama Operasi mesin teoritis
Mesin y Mesin
(unit/jam)
2 Rough Lumber 1/2" (4 bagian per ketebalan 5/4")
Kapasitas
Nama availabilit
No. Nama Operasi mesin teoritis
Mesin y Mesin
(unit/jam)
2 Rough Lumber 3/4" (3 bagian per ketebalan 1")
Kapasitas
Nama availabilit
No. Nama Operasi mesin teoritis
Mesin y Mesin
(unit/jam)
4 Rough Lumber 2" (3 bagian per ketebalan 10/4")
Total Keseluruhan
Jumlah Jumlah
efesiensi Kapasitas mesin Jumlah yang Waktu
Reject yang harus Mesin
mesin aktual(unit/jam) diharapkan Proses
disiapkan Teoritis
Jumlah Jumlah
efesiensi Kapasitas mesin Jumlah yang Waktu
Reject yang harus Mesin
mesin aktual (unit/jam) diharapkan Proses
disiapkan Teoritis
Jumlah Jumlah
efesiensi Kapasitas mesin Jumlah yang Waktu
Reject yang harus Mesin
mesin aktual(unit/jam) diharapkan Proses
disiapkan Teoritis
Jumlah Jumlah
efesiensi Kapasitas mesin Jumlah yang Waktu
Reject yang harus Mesin
mesin aktual(unit/jam) diharapkan Proses
disiapkan Teoritis
mesin
proses nama mesin mesin aktual
teoritis
cut of saw 24.6 25
circle saw 21.97 22
pre-fabrication
planner 27.89 28
jointer 12.12 13
Jumlah 88
cut of saw 4.83 5
circle saw 4.32 5
pre-part
planner 4.32 5
jointer 4.05 5
Jumlah 20
jointer 15.87 16
circle saw 25.06 26
fabrication
disc sand 18.16 19
drill press 9,92 10
Jumlah 71
bench I 30.45 31
rack 4.25 5
disc sand 15.54 16
assembly spray booth 2.65 3
oven 5.56 6
bench II 24.26 25
bench III 3.3 4
Jumlah 90
total seluruh operator 269
Ukuran Material Pada Tiap Proses
Rough
No. Nama Operasi Nama Mesin
Lumber
Pre-Fabrication
10 Potong lurus dan rampas ujung Cut of saw
20 potong sesuai dengan ketebalan Circle saw
30 ratakan pada ketebalan 1/4" Planner
40 potong bentuk sesuai ukuran Circle saw
131 Side Cab (2)
10 Rampas lebar 2" Jointer
20 Potong panjang 2.5" Circle saw
30 Drill lubang 7/8" Drill press
Rough lumber 1/4" (4 per ketebalan 5/4")
6 2 0.25 6 1 0.25
6 2 0.25 6 1 0.25
6 2 0.75 6 2 0.75
6 2 0.75 6 2 0.75
6 2 0.75 6 2 0.75
6 2 0.75 6 2 0.75
5 2 0.75 5 2 0.75
5 2 0.75 5 2 0.75
5 2 0.75 5 2 0.75
5 2 0.75 5 2 0.75
6 6 2 6 2 2
6 6 2 6 2 2
6 6 2 6 2 2
6 6 2 6 2 2
6 6 2 6 2 2
Data Umum
Jam kerja / shift = 8 jam
Jumlah shift / hari = 2 shift
Jumlah hari kerja / minggu = 6 hari
Dimensi lift truck = 2.5 m x 1.5 m
Dimensi walking pallet = 1.5 m x 1 m
1 inchi = 0.0254 m
Allowance
Material
Orang Maintenance Transportasi
Incoming Outgoing
L(m) P(m) L(m) P(m) L(m) P(m) L(m) Luas (m2)
1 4.45 1 10.10 1 1.2 1 513.61
1 4.45 1 10.40 1 1.5 1 468.31
1 4.45 1 9.90 1 1 1 561.61
1 4.45 1 10.20 1 1.3 1 260.40
1 0.29 1 5.94 1 1.2 1 52.32
1 0.29 1 2.08 1 1.5 1 22.63
1 0.29 1 1.58 1 1.0 1 16.63
1 0.29 1 1.88 1 1.3 1 20.23
1 0.29 1 1.58 1 1 1 62.37
1 0.18 1 1.77 1 1.3 1 121.12
1 0.29 1 2.08 1 1.5 1 101.85
1 0.29 1 2.08 1 1.5 1 560.17
1 0.29 1 2.08 1 1.5 1 169.75
1 0.29 1 2.08 1 1.5 1 22.63
1.5 0.29 1.5 7.58 1 7.0 1 389.22
3 0.29 3 8.58 1 8.0 1 84.63
4 0.29 4 8.58 1 8.0 1 254.48
1 0.29 1 2.08 1 1.5 1 135.80
1 0.37 1 2.66 1 2.0 1 21.93
Total
Luas Total
Luas Mesin Total Luas
Ruangan Lantai Pabrik
(m2)
(m2)
Finished Rod
120 Boiler 1 Kayu 1.5
Stick 1.5D
Finished Rod
121 Stack 1 Kayu 0.75
Stick 0.75D
.5 m x 1.5 m
.5 m x 1 m
Kebutuhan RL Sejenis
Jumlah RL / Tumpukan Jumlah Tumpukan Luas Lantai (m2)
/ Lead Time
1966.5 62 32 6.03
458.2 62 8 3.77
1338.4 78 18 10.17
216.9 31 7 3.96
1590.0 52 31 2.28
Total 85.19
EBGC
Karakteristik Bahan
Jumlah Part /
No &Nama Part
Produk
Tebal Panjang
Type Lebar (inch)
(inch) (inch)
937(Label) 1 paper 6 4
960(GammedTape) 1 kraft 60
951(Lacquar) 0.15
959(LacquarThinne
0.015
r)
965(SandPaper) 0.05
970(SandDisc) 0.02
EGBG
Karakteristik Bahan
Jumlah Part /
No &Nama Part
Produk
Tebal Panjang
Type Lebar (inch)
(inch) (inch)
900(Wheel Axle) 13 steel 0.06D 1.25
910(WasherFlat) 26 steel 0.03 0.5 D
937(Label) 1 paper 6 4
960(GammedTape) 1 kraft 60
951(Lacquar) 0.15
959(LacquarThinne
0.015
r)
965(SandPaper) 0.05
970(SandDisc) 0.02
ECGG
Karakteristik Bahan
Jumlah Part /
No &Nama Part
Produk
Tebal Panjang
Type Lebar (inch)
(inch) (inch)
900(Wheel Axle) 12 steel 0.06D 1.25
960(GammedTape) 1 kraft 60
951(Lacquar) 0.15
959(LacquarThinne
0.015
r)
961 (Glue) 0.01
965(SandPaper) 0.05
970(SandDisc) 0.02
Karakteristik Unit Received
Demand (unit)
Tebal Panjang Lebar
Received per unit smaller Unit received
(inch) (inch) (inch)
18 12 12 5 gal 5 gal.can 95
18 12 12 5 gal 5 gal.can 95
18 12 12 5 gal 5 gal.can 95
18 12 12 5 gal 5 gal.can 60
18 12 12 5 gal 5 gal.can 60
18 12 12 5 gal 5 gal.can 60
95
8 12 6 300 pcs 12box/karton
95
8 20 15 432 inch 12rol/karton
95
12 24 12 200 pcs 1 Karton
95
18 12 12 5 gal 5 gal.can
95
18 12 12 5 gal 5 gal.can
18 12 12 5 gal 5 gal.can 95
95
4 12 9 100 sheet 1 Package
95
6 12 12 100 sheet 1 Package
Jumlah Kebutuhan Unit Jumlah Unit Luas Lantai/
Jumlah Luas Lantai
Produksi/Lea Bahan/ Lead Received/Lead Received/ Tumpukan
tumpukan (m2)
d Time Time Time Tumpukan (m2)
DIMENSI
Tinggi 1
Panjang 1
Lebar 1
KAPASITAS
Dus besar 60
Karakteristik Dus Dus kecil 1
Total kapasitas 60
TUMPUKAN
Tinggi tumpukan 2
Jumlah dus/tumpukan 2
Luas tumpukan 1
Jumlah tumpukan 200
Kebutuhan dus besar 400
Kebutuhan
Kebutuhan luas lantai 200
Allowance (100%) 200
Allowance
Allowance gang (30%) 60
Luas Total WareHouse 460.00
unit
m
m
m
dus kecil
toy train
toy train/dus besar
m
dus/tumpukan
m
^tumpukan
2 buah
m
^
m
2
^
m
2
^
m
2
^
2
LUAS LANTAI SHIPPING
Luas Total Warehouse 460.00
Allowance Shipping (100%) 460.00
TOTAL LUAS SHIPPING 920.00
LUAS LANTAI PELAYANAN PRODU
Ukuran
No Nama Ruangan Luas (m2)
P (m) L (m)
1 Menara Air 2 2 4
2 Pemadam Kebakaran 2 1 2
3 Gardu Listrik 2 2 4
4 Kompresor 2 1 2
5 Generator 4 2 8
6 Bengkel 6 4 24
7 pembuangan limbh produksi 6 6 36
TOTAL
Ukuran
No. Nama Ruangan Luas (m2)
P (m) L (m)
1 Garasi 5 4 20
2 Rumah Jaga 2 4 8
3 Parkir Mobil 30 15 450
4 Parkir Motor/Sepeda 50 5 250
TOTAL
Ukuran
No. Nama Ruangan Luas (m2)
P (m) L (m)
1 Musolla 9 9 81
2 Kantin & Dapur 6 10 60
3 Toilet Pria 2 2 4
4 Toilet Wanita 2 2 4
6 Ruang kesehatan 6 4 24
7 Locker 10 1 10
8 Ruang Ganti Pria 3 3 9
9 Ruang ganti Wanita 3 3 9
10 Ruang Olah Raga 20 15 300
11 tempat pembuangan sampag 3 2 6
12 Taman 4 4 16
TOTAL
ANTAI PELAYANAN PRODUKSI
Jumlah
Allowance (50%) Luas + Allowance Luas Lantai (m2)
Ruangan
2 6 2 12
1 3 8 24
2 6 2 12
1 3 1 3
4 12 2 24
12 36 1 36
18 54 1 54
TAL 165
Jumlah
Allowance (40%) Luas + Allowance Luas Lantai (m2)
Ruangan
8 28 4 112
3.2 11.2 2 22.4
180 630 2 1260
100 350 4 1400
TAL 2794.4
Jumlah
Allowance (40%) Luas + Allowance Luas Lantai (m2)
Ruangan
32.4 113.4 1 113.4
24 84 1 84
1.6 5.6 6 33.6
1.6 5.6 6 33.6
9.6 33.6 1 33.6
4 14 4 56
3.6 12.6 2 25.2
3.6 12.6 2 25.2
150 450 1 450
2.4 8.4 1 8.4
6.4 22.4 4 89.6
TAL 952.6
No. Nama Ruangan Ukuran Luas
P (m) L (m)
1 Presiden Direktur & Sekretaris 4 4 16
2 Departemen Pemasaran 8 6 48
3 Departemen Produksi dan Logistik 8 6 48
4 Departemen HRD 8 6 48
5 Departemen Keuangan 6 4 24
6 Departemen Kualitas 6 4 24
7 Departemen Maintenace 6 4 24
8 Ruang Arsip 4 4 16
9 Ruang Seminar & Rapat 20 15 300
10 Ruang Tamu & Receptionis 4 4 16
11 Musholla 5 4 20
12 Toilet Pria 2 2 4
13 Toilet Wanita 2 2 4
14 Parkir 10 4 40
15 Ruang Fotocopy 5 4 20
Total
Allowance Jumlah
Luas + Allowance Luas Lantai (m2)
50% Ruangan
8 24 1 24
24 72 1 72
24 72 1 72
24 72 1 72
12 36 1 36
12 36 1 36
12 36 1 36
8 24 3 72
150 450 1 450
8 24 1 24
10 30 1 30
2 6 2 12
2 6 2 12
20 60 1 60
10 30 1 30
1038
No BAGIAN LUAS LANTAI (m2)
1 Gudang Bahan Baku Utama 85.19
2 Gudang Bahan Baku Pembantu 191.61
3 Receiving 166.08
4 Luas lantai pabrik ( produksi) 7957.30
5 Maintenance 41.10
6 Warehousing 460.00
7 Shipping 920.00
8 Pelayanan Produksi 165.00
9 Pelayanan Pabrik 2794.40
10 Pelayanan Personil Pabrik 952.60
11 Perkantoran & Pelayanan Personil Kantor 1038.00
TOTAL 14771.27
No. Jabatan Jumlah
1 Presiden Direktur 1
2 Sekertaris Presiden Direktur 2
3 Kepala Departemen Pemasaran 1
4 Staff Departemen Pemasaran 10
5 Kepala Departemen Produksi & Logistik 1
6 Staff Departemen Produksi & Logistik 10
7 Kepala Departemen HRD 1
8 Staff Departemen HRD 10
9 Kepala Departemen Keuangan 1
10 Staff Departemen Keuangan 5
11 Kepala Departemen Kualitas 1
12 Staff Departemen Kualitas 4
13 Kepala Departemen Maintenance 1
14 Staff Departemen Maintenance 4
15 Supervisor 20
16 Satpam 6
17 Operator 538
18 Material Handling 20
19 Cleaning Service 10
20 Satpam 5
21 Petugas Dapur 5
Total seluruh 656