Table 7-1, Earned Value Calculations Summary Table
{oped arog a,
fps os thea oe sto
finan i autsaaig woe be
ge alate
reece tat musibe
Painaredin owes ample he
een
ot = eac-evexe ac
Earned Value Analysis
Name ee How Used Rewuit
" Pred |Treauborms nugrtassened io [Teva oft worse oe
fue | esos no Eom 3 pointe, way
mera cater cmon
topessea sot bai | completa eared) eaportin | ake comand wah
‘one rte wo Seema cca aro
skeen any un | piety
Bi |ageiat | ear catbugas estsated | Ihe aoa phned whe
complcon [terdewontseperemed | ojeteostbaeine
ow envaranee) he anoint badpccetetr [Ine atone been bean [eV = -Re Tost = Un ponea a
Sp ata gn pent ne, | om omphind 3 pone, eset On sara ee
tessa ashe croerce bean |bualy eats ane Nee = er ned cs.
> eared va ar acu eon [eos ete sar point,
w Seheaie |The annul wich be pointe [Ine atownc bien ewok [SV=EV-PY Taine = Asa ot Shee
ence | ateadr enn pened [carole a port nw sly ewol=Onsctecle
fetnrydas az gen porcin |e exa cat aa wom peed Neg = enna Sena
fine monsied athe atowree [be complied oe sare port.
tothe aredisbeanaite [ine
Frm abe
We |Ymiaceat | popen ttn amour oegn | Te eainaid tones ncn | Wao = BADE Tooth = Unrpenwe om
eonpiton | ctor san eyessed as tw |e comson ot eprom l= On ated cos.
Stems beeen e up = Neg = raed cos
‘phon
wm fet [Amessueafoeconefsonyot [ACH LOnearstepomae | on= BAG ‘heron 10 = Uae
Peteenane | utp ssurse acto up, at ewok coe
prise” | epeseé the io of nmed [cy cone soar eye Baty 1.0 = On same est
fahete ata eo. Sethe ator er ies lees tan 3.0 Orgone so
ig non ath
nde he uote
Suro no seo
w Seieaie [esse ascnauewiaeney [An sMat 0 ran tie peje | SA PT ‘ian 10 Been ot
feremarcs |empened ste io stenned | jenclyanscwde tt ewe nel
fro | fete pes ae. tay cane sof exe Bath 10 Onsewale
Samet nk lara be less tan 1.0 Bou enue
Puen ohn much cost
eens bad ee
Tie |nawk |teapeacewalconatam. [tech wepeces bee vane [eae ancjem
Compton | pling two epesse asthe [tre emaneer af be pj, tC
Secroescalea ceo [en tecaaas oe
xe planed ate, ie ~~ 7
penalise, | 46a tarp FC
rx cana stintunee | exe = e4o EM
rena wom (usm)
ae Estas» [The mgecnd otis trahalle [Asunigwan i poceding on [HC eA0-¥0
compte | manne poet won pine cot ofconong
emsig subored wean be
taee wg
Reesmazeteemarng wok | EIC= Reese
be bt
To? basnpei [Arnone oe costpearmane |e omnes Batre Tem = (RAG-EVV(BNG= 76) | eter tan 1.0 Hare
oremanes | barrabe sveved were [ruined ners clon cone
pret | main msoures toc met | pon arty 0 Samet compte
Lesstan 10 eases comp
retrtan 1.0 Hore
bach 10> Sane to cpl
leer tan 10 favre comple