You are on page 1of 38

BACK UP VOLUME

PANJANG JARAK PANJANG JUMLAH Tulangan Tulangan


NO STA TULANGAN PEKERJAAN TITIK Pokok Begel
M1 M1 M1 M1 D 10 D 12
Baja Tulangan
Turap Section 1
Sloof
1 0.00 + 31.00 744.00 - 31.00 - - -
3.6 0.15 31.00 206.67 - -

Kolom
2 0.00 + 31.00 121.00 - 31.00 - 1.57 -
41.36 0.15 2.70 18.00 - 0.62
Dinding Turap Beton
3 0.00 + 31.00 6.20 0.15 31.00 206.67 - 0.89
62.00 0.15 3.40 22.67 - 0.89
Ring Balk
4 0.00 + 31.00 248.00 - 31.00 - - -
0.8 0.15 31.00 206.67 0.62 -

Stek Tulangan
5 0.00 + 31.00 4 - 31.00 11.00 0.62 -

Turap Section 2A
Sloof
1 0.00 + 21.30 383.40 - 21.30 - - -
2.8 0.15 21.30 142.00 - -

Kolom
2 0.00 + 21.30 77.00 - 21.30 - 1.57 -
23.52 0.15 1.70 11.33 - 0.62

Ring Balk
4 0.00 + 21.30 170.40 - 21.30 - - -
0.8 0.15 21.30 142.00 0.62 -
Stek Tulangan
5 0.00 + 21.30 4 - 21.30 11.00 0.62 -
Turap Section 2B
Sloof
1 0.00 + 12.00 216.00 - 12.00 - - -
2.6 0.15 12.00 80.00 - -

Kolom
2 0.00 + 12.00 44.00 - 12.00 - 1.57 -
12.64 0.15 1.40 9.33 - 0.62
Ring Balk
4 0.00 + 12.00 96.00 - 12.00 - - -
0.8 0.15 12.00 80.00 0.62 -
Stek Tulangan
5 0.00 + 12.00 4 - 12.00 11.00 0.62 -

Turap Section 2C
Sloof
1 0.00 + 8.30 149.40 - 8.30 - - -
2.2 0.15 8.30 55.33 - -
Kolom
2 0.00 + 8.30 33.00 - 8.30 - 1.57 -
8.28 0.15 1.00 6.67 - 0.62
Ring Balk
4 0.00 + 8.30 66.40 - 8.30 - - -
0.8 0.15 8.30 55.33 0.62 -
Stek Tulangan
5 0.00 + 8.30 4 - 8.30 11.00 0.62 -

Turap Section 3A
Sloof
1 0.00 + 12.80 230.40 - 12.80 - - -
2.8 0.15 12.80 85.33 - -

Kolom
2 0.00 + 12.80 44.00 - 12.80 - 1.57 -
13.44 0.15 1.70 11.33 - 0.62
Ring Balk
4 0.00 + 12.80 102.40 - 12.80 - - -
0.8 0.15 12.80 85.33 0.62 -
Stek Tulangan
5 0.00 + 12.80 4 - 12.80 11.00 0.62 -
Turap Section 3B
Sloof
1 0.00 + 26.50 477.00 - 26.50 - - -
2.8 0.15 26.50 176.67 - -
Kolom
2 0.00 + 26.50 99.00 - 26.50 - 1.57 -
30.24 0.15 1.70 11.33 - 0.62

Ring Balk
4 0.00 + 26.50 212.00 - 26.50 - - -
0.8 0.15 26.50 176.67 0.62 -
Stek Tulangan
5 0.00 + 26.50 4 - 26.50 11.00 0.62 -

Turap Section 3C
Sloof
1 0.00 + 12.00 216.00 - 12.00 - - -
2.6 0.15 12.00 80.00 - -
Kolom
2 0.00 + 12.00 44.00 - 12.00 - 1.57 -
12.64 0.15 1.40 9.33 - 0.62
Ring Balk
4 0.00 + 12.00 96.00 - 12.00 - - -
0.8 0.15 12.00 80.00 0.62 -
Stek Tulangan
5 0.00 + 12.00 4 - 12.00 11.00 0.62 -

Turap Section 3D
Sloof
1 0.00 + 4.95 89.10 - 4.95 - - -
2.2 0.15 4.95 33.00 - -
Kolom
2 0.00 + 4.95 22.00 - 4.95 - 1.57 -
5.52 0.15 1.00 6.67 - 0.62
Ring Balk
4 0.00 + 4.95 39.60 - 4.95 - - -
0.8 0.15 4.95 33.00 0.62 -
Stek Tulangan
5 0.00 + 4.95 4 - 4.95 11.00 0.62 -

Total Berat Tulangan


Tulangan Total Total
Begel Tulangan Tulangan
16 Kg/m Batang

1.58 1175.52 97.96


1.58 1175.52 97.96

- 189.97 15.83
0.62 461.58 38.46

- 1140.39 95.03
- 1250.75 104.23

1.58 391.84 32.65


- 102.51 8.54

- 27.28 2.27

1.58 605.77 50.48


1.58 628.21 52.35

- 120.89 10.07
0.62 165.27 13.77

1.58 269.23 22.44


- 70.43 5.87
- 27.28 2.27
1.58 341.28 28.44
1.58 328.64 27.39

- 69.08 5.76
0.62 73.14 6.10

1.58 151.68 12.64


- 39.68 3.31

- 27.28 2.27

1.58 236.05 19.67


1.58 192.34 16.03

- 51.81 4.32
0.62 34.22 2.85

1.58 104.91 8.74


- 27.45 2.29

- 27.28 2.27

1.58 364.03 30.34


1.58 377.51 31.46

- 69.08 5.76
0.62 94.44 7.87
1.58 161.79 13.48
- 42.33 3.53

- 27.28 2.27
1.58 753.66 62.81
1.58 781.57 65.13

- 155.43 12.95
0.62 212.49 17.71

1.58 334.96 27.91


- 87.63 7.30

- 27.28 2.27

1.58 341.28 28.44


1.58 328.64 27.39

- 69.08 5.76
0.62 73.14 6.10

1.58 151.68 12.64


- 39.68 3.31

- 27.28 2.27

1.58 140.78 11.73


1.58 114.71 9.56

- 34.54 2.88
0.62 22.82 1.90
1.58 62.57 5.21
- 16.37 1.36

- 27.28 2.27

14,446.59 1,203.88
BACK UP VOLUME

NO STA JUMLAH PANJANG LEBAR

Galian Biasa
Pondasi Telappak
1 Pondasi Telapak 1 4.00 1.00 1.00
Pondasi Telapak 2 3.00 0.80 0.80
Pondasi Telapak 3 1.00 0.80 0.50

Pondasi Pas. Batu


2 0.00 + 25.80 1.00 25.80 0.80

Total Volume Galian


TINGGI VOLUME

0.50 2.00
0.50 0.96
0.50 0.20

0.80 16.51

19.67
BACK UP VOLUME

NO STA JUMLAH PANJANG LEBAR

Galian Biasa
Urugan
1 Urugan Kembali 1.00 4.00 2.00
1.00 2.00 1.45
1.00 2.00 1.50
1.00 3.50 2.00
1.00 4.00 3.45

2 Urugan Tanah 1.00 4.00 2.00


1.00 2.00 1.45
1.00 2.00 1.50
1.00 3.50 2.00
1.00 4.00 3.45

3 Urugan Pasir 1.00 4.00 2.00


1.00 2.00 1.45
1.00 2.00 1.50
1.00 3.50 2.00
1.00 4.00 3.45

Total Volume Urugan


TINGGI VOLUME

0.50 1.33
0.50 0.48
0.50 0.50
0.50 1.17
0.50 2.30

0.90 7.20
0.90 2.61
0.90 2.70
0.90 6.30
0.90 12.42

0.05 0.40
0.05 0.15
0.05 0.15
0.05 0.35
0.05 0.69

38.75
BACK UP VOLUME

NO STA JUMLAH PANJANG LEBAR

Beton K - 250
Pondasi
1 Pondasi Telapak 1 4.00 1.00 1.00
Pondasi Telapak 2 3.00 0.80 0.80
Pondasi Telapak 3 1.00 0.80 0.50
2 Kolom
Kolom Utama 6.00 4.00 0.20
Kolom Praktis 4.00 4.00 0.15
Sloof
3 0.00 + 25.80 1.00 25.80 0.25

Ring Balk
4 0.00 + 19.80 1.00 19.80 0.20

Total Volume Beton K-225


TINGGI VOLUME

0.25 1.00
0.25 0.48
0.25 0.10

0.20 0.96
0.15 0.36

0.20 1.29

0.15 0.59

4.78
BACK UP VOLUME

NO STA JUMLAH PANJANG LEBAR

Lantai Kerja
Pondasi
1 Pondasi Telapak 1 4.00 1.00 1.00
Pondasi Telapak 2 3.00 0.80 0.80
Pondasi Telapak 3 1.00 0.80 0.50

Total Volume Lantai Kerja


TINGGI VOLUME

0.05 0.20
0.05 0.10
0.05 0.02

0.32
BACK UP VOLUME

NO STA JUMLAH PANJANG LEBAR

Pas. Batu Gunung


Pondasi Pas. Batu
1 0.00 + 25.80 1.00 25.80 0.45

Total Volume Pas. Batu Gunung


TINGGI VOLUME

0.65 7.55

7.55
BACK UP VOLUME

NO STA JUMLAH PANJANG LEBAR

Pas. Batu Kosong


Pondasi Pas. Batu
1 0.00 + 25.80 1.00 25.80 0.80

Total Volume Pas. Batu Kosong


TINGGI VOLUME

0.15 3.10

3.10
BACK UP VOLUME
JUMLAH PANJANG
NO STA
ULIN 10X10 PEKERJAAN
Kayu Ulin 10 x 10 - 2 m
Pondasi
1 Pondasi Telapak 1 5.00 -
Pondasi Telapak 2 5.00 -
Pondasi Telapak 3 3.00 -

Total Kebutuhan Kayu Ulin


UME
PANJANG ULIN 10X10 TOTAL
M1 PANJANG
2m

2.00 10.00 ###


2.00 10.00
2.00 6.00

26.00
BACK UP VOLUME

NO STA JUMLAH PANJANG TINGGI

Pas. Batu Gunung


Turap Section 2A
Dinding
1 0.00 + 21.30 7.00 2.70 1.70

Turap Section 2B
Dinding
2 0.00 + 12.00 4.00 2.70 1.40

Turap Section 2C
Dinding
3 0.00 + 8.30 2.00 2.70 1.00
1.00 2.00 1.00

Turap Section 3A
Dinding
4 0.00 + 12.80 4.00 2.90 1.70

Turap Section 3B
Dinding
5 0.00 + 26.50 9.00 2.65 1.70

Turap Section 3C
Dinding
6 0.00 + 12.00 4.00 2.70 1.40

Turap Section 3D
Dinding
7 0.00 + 4.95 1.00 2.70 1.00
1.00 1.65 1.00

Total Luas Plasteran Mata Sapi


LUAS

32.13

15.12

5.40
2.00

19.72

40.55

15.12

2.70
1.65

134.39
BACK UP VOLUME
PANJANG JUMLAH
NO STA
PEKERJAAN ULIN 10 X 10
Klamp Sambungan Stainless Steel 6 mm 10x60 1 set = 2 bh
Turap Section 1
1 0.00 + 31.20 31.20 2.50

Total Kebutuhan Klamp Sambungan Stainless Steel

PANJANG JUMLAH
NO STA
PEKERJAAN ULIN 10 X 10
Baut Stainless Pasang Baut Stainless 12 mm + ring/mur

Turap Section 1
1 0.00 + 31.20 31.20 1.25

Total Kebutuhan Baut Stainless


UME
JUMLAH KLAM TOTAL
TIANG PANJANG
mm 10x60 1 set = 2 bh

2.00 1.25 ###

nless Steel 1.25

JUMLAH BAUT TOTAL


TIANG PANJANG
12 mm + ring/mur

4.00 5.00

5.00
REKAPITULASI BIAYA
Nama Kegiatan : Penurapan dan Pematangan Lahan Lokasi Pembangunan Puskeswan Kota Bontang
Sumber Dana : Bantuan Keuangan Provinsi Kalimantan Timur
Tahun Anggaran : 2016
Lokasi : Kelurahan Telihan - Kota Bontang

JUMLAH HARGA
No. URAIAN
( Rp. )

1 PENDAHULUAN

2 PEKERJAAN TANAH

3 PEKERJAAN STRUKTUR

4 PEKERJAAN LAIN - LAIN

A JUMLAH
B PPN 10%
C JUMLAH ( A + B )
D PEMBULATAN

Terbilang :
" Satu Milyar Seratus Lima Puluh Delapan Juta Tujuh Ratus Lima Puluh Satu Ribu Rupiah "
an Kota Bontang

JUMLAH HARGA
( Rp. )

9,919,817.31

242,868,646.18

799,518,776.56

1,541,000.00

1,053,848,240.05
105,384,824.00
1,159,233,064.05
1,159,233,000.00

a Puluh Satu Ribu Rupiah "


DAFTAR KUANTITAS DAN HARGA
Nama Kegiatan : Penurapan dan Pematangan Lahan Lokasi Pembangunan Puskeswan Kota Bontang
Sumber Dana : Bantuan Keuangan Provinsi Kalimantan Timur
Tahun Anggaran : 2016
Lokasi : Kelurahan Telihan - Kota Bontang

No. URAIAN SATUAN

BAB 1. PENDAHULUAN

1.1 Plang Nama Kegiatan Ls


1.2 Pembersihan Lokasi ( termasuk pembersihan pepohonan, M
semak dan lain - lain )
1.3 Bendung Sungai dengan Sand Bag tau sejenis dan Ls
Dewatering (kuras air) untuk Penggalian dan Pengecoran

Jumlah Harga Bab. 1 ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )

BAB 2. PEKERJAAN TANAH

2.1 Galian Biasa M


2.2 Urugan Tanah Berpasir, Hampar dan Pemadatan M

Jumlah Harga Bab. 2 ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )

BAB 3. PEKERJAAN STRUKTUR

3.1 Lantai Kerja Beton camp. 1 pc : 3ps : 5kr M


3.2 Pas. Batu Kosong M
3.3 Beton K-250 (turap) M
3.4 Baja Tulangan Kg
3.5 Pas. Batu Gunung 1 pc : 4 ps M
3.6 Plesteran Mata Sapi campuran setara 1pc : 4 ps M
3.7 Pemancangan Tianga Pancang Kayu Ulin 10 x 10 M1
3.8 Klem Sambungan Stainless Steel 6mm 10x60 1 set=2bh Set
3.9 Baut Stainless 12 mm + ring/mur Bh

Jumlah Harga Bab. 3 ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )
AR KUANTITAS DAN HARGA

HARGA HARGA
KUANTITAS SATUAN PEKERJAAN
( Rp. ) ( Rp. )

1.00 600,000.00 600,000.00


1,108.03 3,377.00 3,741,817.31

1.00 5,578,000.00 5,578,000.00

a) 9,919,817.31

128.57 68,156.00 8,762,816.92


1,496.77 156,407.35 234,105,829.26

a) 242,868,646.18

5.07 1,091,442.00 5,533,610.94


9.30 385,550.00 3,585,615.00
93.11 2,433,332.00 226,567,542.52
13,724.30 17,133.80 235,149,411.34
81.19 892,925.00 72,496,580.75
135.15 39,707.80 5,366,509.17
1,596.00 99,589.29 158,944,506.84
105.00 675,000.00 70,875,000.00
420.00 50,000.00 21,000,000.00

a) 799,518,776.56
JADUAL PELAKSANAAN PEKERJAAN
Nama Kegiatan : Penurapan dan Pematangan Lahan Lokasi Pembangunan Puskeswan Kota Bontang
Sumber Dana : Bantuan Keuangan Provinsi Kalimantan Timur
Tahun Anggaran : 2016
Lokasi : Kelurahan Telihan - Kota Bontang

Bulan I Bulan II
Bobot
No. Uraian Pekerjaan : Minggu Ke
(%) 1 2 3 4 5
Bab 1. PENDAHULUAN
1.1 Plang Nama Kegiatan 600,000.00 0.06 0.06
1.2 Pembersihan Lokasi ( termasuk pembersihan pepohonan, 3,741,817.31 0.36 0.18 0.18
semak dan lain - lain )
1.3 Bendung Sungai dengan Sand Bag tau sejenis dan
Dewatering (kuras air) untuk Penggalian dan Pengecoran 5,578,000.00 0.53 0.07 0.07 0.07 0.07 0.07
Bab. 2 PEKERJAAN TANAH
2.1 Galian Biasa 8,762,816.92 0.83 0.28 0.28 0.28
2.2 Urugan Tanah Berpasir, Hampar dan Pemadatan 234,105,829.26 22.21 2.78 2.78 2.78 2.78
Bab 3. PEKERJAAN STRUKTUR
3.1 Lantai Kerja Beton camp. 1 pc : 3ps : 5kr 5,533,610.94 0.53 0.53
3.2 Pas. Batu Kosong 3,585,615.00 0.34 0.34
3.3 Beton K-250 (turap) 226,567,542.52 21.50
3.4 Baja Tulangan 235,149,411.34 22.31
3.5 Pas. Batu Gunung 1 pc : 4 ps 72,496,580.75 6.88
3.6 Plesteran Mata Sapi campuran setara 1pc : 4 ps 5,366,509.17 0.51
3.7 Pemancangan Tianga Pancang Kayu Ulin 10 x 10 158,944,506.84 15.08 5.03 5.03 5.03
3.8 Klem Sambungan Stainless Steel 6mm 10x60 1 set=2bh 70,875,000.00 6.73 3.36 3.36
3.9 Baut Stainless 12 mm + ring/mur 21,000,000.00 1.99 1.00 1.00

Bab 4. PEKERJAAN LAIN - LAIN


4.1 Pekerjaan Lain - Lain 1,541,000.00 0.15 0.05 0.05 0.05
Jumlah Bobot Pekerjaan ( % ) 1,053,848,240.05 100.00
Rencana Kemajuan Mingguan 0.30 3.07 8.20 13.08 12.85
Komulatif Rencana Kemajuan Mingguan 0 0.30 3.37 11.57 24.65 37.49
Bulan II Bulan III
KET.
Minggu Ke -
6 7 8 9 10 11 12 100%

0.07 0.07 0.07

2.78 2.78 2.78 2.78

4.30 4.30 4.30 4.30 4.30


3.72 3.72 3.72 3.72 3.72 3.72
1.72 1.72 1.72 1.72
0.25 0.25

0%
3.79 8.08 12.58 12.52 12.52 12.77 0.25
41.28 49.36 61.94 74.46 86.98 99.75 100.00

Bontang, Juli 2016


Konsultan Supervisi :
PT. Thahiranindo

Andi Baso Ramlan, ST.


Wakil Direktur Cabang

You might also like