You are on page 1of 28
4 GRASSL| BERATENDE| INGENIEURE| BAUWESEN| Extradosed ‘STRUCTURAL ANALYSIS Barapullah Bridge over Yamuna River, India DYNA Link Anchor Box Type 55 Part: Part |~1 General, 2 Anchor Box Design: DYWIDAG:Systoms International GribH ‘SiemonssitaBo 8 1.85716 Unterchlesheim Calculated by: Ingerieurbiro Grass GmbH Mactatinger St. 5-7 1D-81579-Monchen Projekt Number: Miss20 Pace, Date: ‘Munchen, 25.05.2016 et se) 1 Goneral 1A Index tor Part + Gonaa - 1 nda Pat ae 12 Basrpton of ihe woes 13 Design Standards Solar. 2 hecho Boe 21 Pato sacral sai — bit Mera 212 Fenelon diners dig 28 sae netons nnn = 221" Desgn toads = 222 Loadoaee 23” Reautn onsios a 2:11 Ntoadsae 12 S13 ~ new ~ 252 Leoveago19:FLS~tnear = 253 Leoeease 21: ULS ronan 234 Usadene 11-ULS- tear 24 enrol ‘341 “Utimate unit Sis (015) onincr ana 242 Serreabiy Lit Sato (SS) ~lnear ona om 243 Fae Lint Ste (15) ~lnear an - 244 Suutshew comers = 243 Conontaoatones, = rapa OWA tooo ore GRASSL [=amenmmnvon Dar WONG Sloe eral Or BERATENDE 4.2. Description oft the project ‘Subjgt fhe seta anaes the DYNA Lick Anchor Gox Type 8 forthe extradosed Barapulah Bria (ver Yamuna Riven nda, ‘The decgn incig the peomoty date of ha Anchor Box is based on a tedimensionl geomet fle ‘vided by DYWIOAG Syste ttematonal Gb

You might also like