Extradosed
‘STRUCTURAL ANALYSIS
Barapullah Bridge over Yamuna River, India
DYNA Link Anchor Box Type 55
Part: Part |~1 General, 2 Anchor Box
Design: DYWIDAG:Systoms International GribH
‘SiemonssitaBo 8
1.85716 Unterchlesheim
Calculated by: Ingerieurbiro Grass GmbH
Mactatinger St. 5-7
1D-81579-Monchen
Projekt Number: Miss20
Pace, Date:
‘Munchen, 25.05.2016
et se)1 Goneral
1A Index tor Part
+ Gonaa -
1 nda Pat ae
12 Basrpton of ihe woes
13 Design Standards Solar.
2 hecho Boe
21 Pato sacral sai —
bit Mera
212 Fenelon diners dig
28 sae netons nnn =
221" Desgn toads =
222 Loadoaee
23” Reautn onsios a
2:11 Ntoadsae 12 S13 ~ new ~
252 Leoveago19:FLS~tnear =
253 Leoeease 21: ULS ronan
234 Usadene 11-ULS- tear
24 enrol
‘341 “Utimate unit Sis (015) onincr ana
242 Serreabiy Lit Sato (SS) ~lnear ona om
243 Fae Lint Ste (15) ~lnear an -
244 Suutshew comers =
243 Conontaoatones, =rapa OWA tooo ore GRASSL [=amenmmnvon
Dar WONG Sloe eral Or BERATENDE
4.2. Description oft the project
‘Subjgt fhe seta anaes the DYNA Lick Anchor Gox Type 8 forthe extradosed Barapulah Bria
(ver Yamuna Riven nda,
‘The decgn incig the peomoty date of ha Anchor Box is based on a tedimensionl geomet fle
‘vided by DYWIOAG Syste ttematonal Gb