You are on page 1of 3

Wadi Dayqah Dam

Wadi Dayqah Dam top view Wadi Dayqah Dam in Operation

Wadi Dayqah Dam in Construction Wadi Dayqah Dam in Operation

Dam Cross-section
Force must be calculated on Dam according to current elevation of water in reservoir. H+Y must be
considered for each student. Y is last 3 digits of the student number divided by 250.

You might also like