Professional Documents
Culture Documents
1,100.00
Average Push Distance (m) 93.4
Average Push Grade (%) -3.6
Dozer Push Cost ($/bcm) $1.45
1,080.00
1,060.00
1,040.00
1,020.00
1,000.00
980.00
863.00 883.00 903.00 923.00 943.00 963.00 983.00 1,003.00 1,023.00 1,043.00 1,063.00 1,083.00
Proposed Slice Method
Dozer Push #1
1,100.00
Average Push Distance (m) 70.1
Average Push Grade (%) -27.5
Dozer Push Cost ($/bcm) $0.89
1,080.00
1,060.00
1,040.00
1,020.00
1,000.00
980.00
863.00 883.00 903.00 923.00 943.00 963.00 983.00 1,003.00 1,023.00 1,043.00 1,063.00 1,083.00
Dozer Push #2
1,100.00
Average Push Distance (m) 98.2
Average Push Grade (%) -7.0
Dozer Push C($/bcm) $1.46
1,080.00
1,060.00
1,040.00
1,020.00
1,000.00
980.00
863.00 883.00 903.00 923.00 943.00 963.00 983.00 1,003.00 1,023.00 1,043.00 1,063.00 1,083.00
Dozer Push #3
1,100.00
Average Push Distance (m) 114.7
Average Push Grade (%) 3.6
Dozer Push C($/bcm) $2.01
1,080.00
1,060.00
1,040.00
1,020.00
1,000.00
980.00
863.00 883.00 903.00 923.00 943.00 963.00 983.00 1,003.00 1,023.00 1,043.00 1,063.00 1,083.00
Dozer Push #4
1,100.00
Average Push Distance (m) 113.2
Average Push Grade (%) 9.4
Dozer Push C($/bcm) $2.48
1,080.00
1,060.00
1,040.00
1,020.00
1,000.00
980.00
863.00 883.00 903.00 923.00 943.00 963.00 983.00 1,003.00 1,023.00 1,043.00 1,063.00 1,083.00
Dozer Push #5
1,100.00
Average Push Distance (m) 108.9
Average Push Grade (%) 15.6
Dozer Push C($/bcm) $2.74
1,080.00
1,060.00
1,040.00
1,020.00
1,000.00
980.00
863.00 883.00 903.00 923.00 943.00 963.00 983.00 1,003.00 1,023.00 1,043.00 1,063.00 1,083.00
Dozing Cost for each push ($/bcm)
3.00
2.50
2.00
Cost ($/bcm)
1.50
1.00
0.50
0.00
1 2 3 4 5
Dozer Push Number
Dozer Push Summary
(note the increased total cost)
1,100.00
Push Volume $/bcm
No.
1,060.00
4 179 2.48
5 179 2.74
1221 1.67
1,040.00
1,020.00
1,000.00
980.00
863.00 883.00 903.00 923.00 943.00 963.00 983.00 1,003.00 1,023.00 1,043.00 1,063.00 1,083.00
Does Design Matter
YES