ZAKUM OIL LINE REPLACEMENT PROJECT PHASE-1
PRECOMMISSIONING
Instrument Test Sh
'B10015393'
NPCC
[Rom =212-PSv-3400 [Module ZKIS
Desc: __ SAFETY RELIEF VALVE [Dwg /RevNo.__ADI38-23/2 16-1 G22
[Task Location: OFFSHORE Data sheet / RevNo.\0/98 -297/2/4-G 08259 REV 2
[sub-system : _0310-ZK13--Drain Sump Tank & Pump
DATA
‘SERIALN' 5D456/
‘VENDOR CALIBRATION MANUAL N® : A//L
CALIBRATIONTESTPROCEDUREN” C) 7 .CAL-022 bev 5
DATASHEETN" | AD/#8-2:9 [2 16-G-08259 Rev
BALANGED OR CONVENTIONAL : Con/ VEN 77ONOL.
INLETORIFICE SE. 17a” OUTLETORIFICESZE: 2”
SERIAL NY 7 'SPRINGN NIL
Testing & measurement instruments used
Tipe Serial” Calbraten carifeate vali
[Szanlos Tes7 GAL Ge 2H PHASE E1824 15118 24/06] 2017
TEST DETALS
[TEST DATE (20/03/2017 [TEST MEDIUM TENP Wit.
DESIGN PRESSURE NUL DURATION OF TEST Tenet
[TEST PRESSURE REQUIRED WOOPST [SEAT LIFT PRESSURE 1100 PSI
Test medium WATER IRE-SEAT PRESSURE 1056 PSI
IBACK PRESSURE Nik BUBBLE LEAK RATE I0/,AT-GIAPS) wo LEAK
[TESTED LABEL AFFXED A DATASHEET ATTACHED wer
Remarks :
Signature fro —
Name | 7x00) - P. NOIR. RUCK
Date Jes loolF 20103) 201}
leaps Data entered b Date: SHEET IORI Rev?fad
ZAM
ADMA-OPCO
2
VENDOR
DOCUMENT STATUS.
Nece
Dala-accerreo|
(H) 8-comvents AS waRRED
[e-noraccepren
(Ho -retanen FOR INFORHATION
[A ACCEPTANCE DOES NOT AFFECT
‘VENDOR LIABILITIES 8 ESPONSBLITIES
[AS STIPULATED (AITHN THE PURCH ASE
[anima omer
ZAKUM OIL LINES REPLACEMENT PROJECT -,FH deo
ADMA-OPCO Contract Agreement Ni
Equi
214-P-2653;208-P-2701 213+
2682:314-P-2691 ;226-P-2704;297-P-271
Equipment Title
NPCC
NATIONAL PETROLEUM CONS‘
weyreb Sac ABU OHAS, UN
16;
68
"YENOOR MUST CONFIRM TART ALL
COMMENTS WL BE INGORFOR ATED
BEFORE PROCEEDING
[ALL DOCUMENTS MUST BE RESUBM ITED
AFTER INCORPORATION OF COMNEN TS
(WORK SHALL NOT PROCEED.
c
J ee armaie
NPCC Purchase Order Number : 2272-2019-350%4-ASR Arun Singh szizx-
pment Material: Drain Sump Pump Skid Pacige — Rongkali Sa=8t-
Equipment Tag No
P-2700;299-P-2702;229-P-2684;902-P-2652;903-P-2693;251-P-2689;212-P-
‘260;316-P-2683;174-P-2606;250-P-2685;260-P-2692;220-P-2600;31 1-P-2687;298-P-2608;909-P-
'06;164-P-2709;266-P-2651;306-P-2645;209-
2675;249-P-2726
rain Sump Pump Skid Package
INSTRUMENT DATA SHEETS
NPCC DOC. No.: 2272-35017 AC-JO05-001
‘ADMA DOC. No.: AD178-27/216-G-08259
VENDOR DOC. No.: 801516-14
2678;400-P-
STRUCTION COMPANY
ITED ARAB EMIRATES
[Change NPCC logo in all
instrument data sheets during
final documentation.
| Ewa miooLs east F2E
2 610.2015. 7 Tesued fr approval aN
ol 6.42015) Taeved for approval aN.
0 172014 isaved for approval [oN a |
Rev Dare REMARKS cuk | evo | apvo7 [ves [rsoexoor- Tame
ccenesa, Cena [Ear ror evi =
[Joven [ERE Rana ae a
aa Ser) —— os ra L iar
3 fra are Tenens [aa
ee ae eo
i fowemy Free Ls wc
“alome Tene emg Toes ——"o Faw fec-ame
“slom Fanaa earn rea fae
“a a Cones)
[refesorPessue [vest = Te
process [ ico ca a
‘aloimpretty Face seas Wa E
“ise
a eT I aoe
[a et ot Vaan eae
spoon ae Ta [a SSS
isso [27] estates 23 eS ea aR TTR I aR
3 asnarve ae Ba
crave {3a boa — [oa FSET ESS
oon Pe Ge (a ORT [esr oar ERRATA aT
ame SNS
stone Pt I oc Taos [ensromnenar amy
7 eos [aoa ia a
[2 [ta Pan aa) — fave cc WERREUT eae EU case
cornows a [rarin [oro woe SE
7 a Sp DEAERGRRET OIA TOT
[rare ston Wo BESSA
77 etn rea =m
1 |besmnrnon co
ana rx am [nen SERENA.
sihea “BARE Ug age a poe
OES
EN n200 32 hemes a ares man ati boo ere
Eh anos 2 cenou Nese basen ib? eatin
ree re uray tagesea osama 101 Po By, Ber Cop Nae Das Aig el Sry, Gc Neeser Se
to Ss Spr enero) Copa Bowel
Toot esrvaae cnn abl anced MR
a <=
=e oar [SP gen
a Tans Sears frome es
ae iia homeo ot