1 INTRODUCTION
This report covers detailed design calculations of the box culverts on the B-357
Paranthan Pooneryn road.
The structures are designed as reinforced concrete frame with continuous edges.
Clear span of the selected culvert is 1.2m. Width of the box culvert is selected
with two carriageway lanes of 3.5m and 1.0 m hard shoulder and 1.2m soft
shoulder at either side. Total width of the culvert is 11.4m. The whole structure is
designed as reinforce concrete structure rests on soil.
Considering Contract and the BOQ items already awarded, materials for each
item are selected.
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 1
Reference Calculation Output
2 DESIGN INFORMATION
Material Properties
Concrete
2
Characteristic strength = 30 N/mm
3
Density = 25 kN/m
Elastic Modulus = 28 kN/mm2
Reinforcement
2
Characteristic strength of tor steel = 460 N/mm
2
Characteristic strength of mild steel = 250 N/mm
Elastic Modulus = 200 kN/mm2
Soil
3
Density = 19 kN/m
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 2
Reference Calculation Output
3 LOADS AND LOAD EFFECTS
3.1 VERTICAL LOADS
3.1.1 LIVE LOADS
BS5400:
Part2:1978 Carriage way width = 7.000 m
3.2.9.3.1 Number of Notional lanes = 2
Width of Notional lane = 3.500 m
HA LOADING
BS5400: Loaded length is considered as 1.4m to produce more severe loads on top slab of the box culvert.
Part2:1978
6.2.1
6.2.2
Nominal HA Loads
BS5400: Loaded Length = 1.400 m (< 30m )
Part2:1978 Uniformly distributed load = 30 kN/m per notional lane
6.4.1 Knife edge load = 120 kN per notional lane
HA UDL and KEL shall be applied to two notional lanes to get more severe effect.
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 3
Reference Calculation Output
HA + HB LOADING
Nominal HB Loads
Unit Loading
Number of HB units = 30
RDA Bridge
Design Unit Load = 2.5 kN per wheel
Manual 2.2.3 Total load = 75 kN per wheel
Wheel set
3
1m
Wheel set
4
1.8m 6m 1.8m
Self weight
2
Top slab 0.25x25 = 6.25 kNm/m
2
Bottom slab 0.20x25 = 5.00 kNm/m
2
Wall 0.20x25 = 5.00 kNm/m
2
Uniform pressure on slab due to wearing coarse = 1.15 kNm/m
Assume wearing coarse thickness (50mm)
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 4
Reference Calculation Output
3.2 HORIZONTAL LOADS
3.2.1 TRACTION OR BRAKING FORCES
Load Combination 4
More severe load resulting from nominal load for type HA or HB
BS5400:
Part 2 Nominal load for HA Loadings = 8 kN/m of loaded length+200 kN<700 kN
6.6.1
FROM SUPERSTRUCTURE
Top slab only
Loaded length = Top slab length length
= 1.600 m (clear span, 1.2 + wall thickness 0.2x2)
Nominal load for HA Loadings = 1.6x8+200 = 213 kN
Traction force on abutment = 213x1.0 kN
= 213 kN
BS5400:
Part 2 1978
6.6.2
Nominal load for HB Loadings = 25% of HB loading
= 75x16/4x25% = 75 kN Traction force
213 kN
(Only one axial of HB vehicle can be placed on the top slab)
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 5
Reference Calculation Output
3.2.2 EARTH PRESSURES
Active conditions
Coulomb Theory for active conditions
= ( h+q)ka
Earth pressure co-efficient at active condition, k a
2
ka = cos sec
1/2 2
{1+[ (sin ( + ) sin( )]/cos cos )] }
where
= 30 deg = 0 deg
2
ka = cos = 0.333
[1+sin
At rest conditions
= ( h+q)k0
Earth pressure co-efficient at active condition, k a
k0 = (1- sin
k0 = 0.5
2
w = 9.81 kN/m
fl to be considered in combination
Load Case ULS 1-1 ULS 1-2 SLS 1-1. SLS 1-2 ULS 4-1 ULS 4-2
Self Weight 1.15 1.15 1.00 1.00 1.15 1.15
Wearing Surface 1.75 1.75 1.20 1.20 1.75 1.75
Parapet Wall 1.75 1.75 1.20 1.20 1.75 1.75
Soil 1.20 1.20 1.00 1.00 1.20 1.20
Soil Pressure 1.50 1.50 1.00 1.00 1.50 1.50
HA Primary Live Load 1.50 1.50 1.20 1.20 1.25 1.25
HB Primary Live Load 1.30 1.30 1.10 1.10 1.10 1.10
HA Surcharge 1.50 1.50 1.00 1.00 1.50 1.50
HB Surcharge 1.50 1.50 1.00 1.00 1.50 1.50
Traction Force - - - - 1.25 1.25
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 6
Reference Calculation Output
3.4 SERVICIBILITY LIMITE STATE DESIGN
3.4.1 BEARING PRESSURE
2
Expected Bearing pressure of soil = 100.0 kN/m
2
Design Bearing Pressure underneath the foundation = 69.7 kN/m
Hence ok
Hence ok
3.4.3 DEFLECTION
Deflection check is not critical for box culvert
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 7
Reference Calculation Output
3.5 Critical Bending Moment and Shear Force at ULS & SLS
The analysis of the structure has been carried out using SAP 2000 ver. 14
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Z = 0.950 d
= 0.95x275 = 261.3 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 23.98x106/0.87x460x261.3 = 229 mm /m =
2
229 mm /m
2
Use T 10 @ 125 ( As = 628 mm ) As pro =
2
628 mm /m
Hence o.k
BS 5400 Check for minimum reinforcement (considering average d value in the Chamfer, d =275)
Part 4: 1990 100As / bad = 100x628/(1000x275) = 0.228 > 0.15 Main reinforcement
5.8.4.1 T 10 @ 125
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Z = 0.950 d
= 0.95x200 = 190.0 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 15.07x106/0.87x460x190 = 198 mm /m =
2
198 mm /m
2
Use T 10 @ 125 ( As = 628 mm ) As pro =
2
628 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
4.1.1.2 DESIGN FRO BENDING ABOUT TRANSVERSE AXIS AT MIDSPAN (BOTTOM REINFORCEMENT)
Z = 0.950 d
= 0.95x199 = 189.1 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 31.46x106/0.87x460x189.1 = 416 mm /m =
2
416 mm /m
2
Use T 12 @ 125 ( As = 905 mm ) As pro =
2
905 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Z = 0.950 d
= 0.95x188 = 178.6 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 22.77x106/0.87x460x178.6 = 319 mm /m =
2
319 mm /m
2
Use T 10 @ 150 ( As = 524 mm ) As pro =
2
524 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Hence O.K
1/3 1/3
BS 5400 Allow. shear resistance = (0.27/ m)(100As/bwd) (fcu) s
Part 4: 1990 , sv c
5.3.3.2 Where, depth ratio, s
= (500/d)1/4
= (500/200)^1/4
= 1.26 or 0.7 (greater value)
sv c
= (0.27/1.25)x(100x628/1000x200)x1/3x(30)^1/3x1.26
2
= 0.57 N/mm
2
Use T 10 @ 150 ( As = 524 mm ) Secondary
reinforcement
T 10 @ 150
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 13
Reference Calculation Output
4.2 DESIGN OF BASE SLAB
4.2.1 DESIGN ABOUT TRANSVERSE AXIS AT SUPPORT (BOTTOM REINFORCEMENT)
4.2.1.1 DESIGN FOR BENDING IN CHAMPHER
Z = 0.950 d
= 0.95x225 = 213.8 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 19.36x106/0.87x460x213.8 = 226 mm /m =
2
226 mm /m
2
Use T 10 @ 125 ( As = 628 mm ) As pro =
2
628 mm /m
Hence o.k
BS 5400 Check for minimum reinforcement (considering average d value in the Chamfer, d =225)
Part 4: 1990 100As / bad = 100x225/(1000x237.5) = 0.279 > 0.15 Main reinforcement
5.8.4.1 T 10 @ 125
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Z = 0.950 d
= 0.95x150 = 142.5 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 13.86x106/0.87x460x142.5 = 243 mm /m =
2
243 mm /m
2
Use T 10 @ 125 ( As = 628 mm ) As pro =
2
628 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Z = 0.950 d
= 0.95x150 = 142.5 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 12.87x106/0.87x460x142.5 = 226 mm /m =
2
226 mm /m
2
Use T 10 @ 125 ( As = 628 mm ) As pro =
2
628 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Z = 0.950 d
= 0.95x140 = 133.0 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 4.07x106/0.87x460x133 = 76 mm /m =
2
76 mm /m
2
Use T 10 @ 150 ( As = 524 mm ) As pro =
2
524 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Hence O.K
1/3 1/3
BS 5400 Allow. shear resistance = (0.27/ m)(100As/bwd) (fcu) s
Part 4: 1990 , sv c
5.3.3.2 Where, depth ratio, s
= (500/d)1/4
= (500/150)^1/4
= 1.35 or 0.7 (greater value)
sv c
= (0.27/1.25)x(100x628/1000x150)x1/3x(30)^1/3x1.35
2
= 0.68 N/mm
2
Use T 10 @ 150 ( As = 524 mm ) Secondary
reinforcement
T 10 @ 150
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
BD 28/87
To control crack spacing there must be sufficient reinforcement so that the
5.1 reinforcement will not yield before the tensile strength of the immature concrete is
exceeded. This is achieved by satisfying the equation below,
6
BD 28/87 Area of effective concrete, Ac = 1000 x 250/2 = 0.125 x 10
2
5.2 mm /m
275
1000
2
Characteristic tensile strength of reinforcement, fy = 460 N/mm
2
Characteristic cube strength of concrete , fcu = 30 N/mm
Tensile strength of immature concrete, fct*
0.7
= 0.12(fcu)
fct* = 0.12 x (30)0.7 = 1.30 N/mm
2
Therefore,
Minimum reinforcement area, As = (1.3 / 460) x 0.3 x 106
2
= 353 mm /m As req = 353
2
mm /m
2
Use T 10 @ 125 ( As pro = 628.32 mm /m ) Use
T 10 @ 125
BD 28/87 In addition to controlling the spacing of cracks, the reinforcement must be adequate to
5.3 ensure that crack widths do not exceed the permissible values. This is achieved by
satisfying the equation below,
BD 28/87 The ratio of the tensile strength of the immature concrete to the average bond strength
5.4 between the reinforcement and the immature concrete,
(fct* / fb) = 0.67 (fct* / fb)
(for Type 2 deformed bars) = 0.67
6
BD 28/87 Area of effective concrete, Ac = 1000 x 25/2 = 0.125 x 10 Ac = 0.125 x 106
2 2
5.2 mm /m mm /m
Part 4: 1990 These coefficients are valid only for concretes that have been protected from
Appendix C excessive losses of moisture in their early days. Therefore, concrete shall be protected
from excessive losses of moisture in their early days.
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 19
Reference Calculation Output
-6
fig.14 kL = 200 x 10
(for 80% Relative humidity)
fig.11 kc = 1.1
3
(for w/c- 0.45 & cement con.-400kg/m )
fig.15 ke = 0.75
(for effective thickness 250 mm)
fig.13 kj = 0.30
(for 75 days)
-6
Therefore, Shrinkage strain, sh = 50 x10 sh
-6
= 50 x10
BD 28/87 Thermal strain, th = 0.8 (T1+ T2)
5.7
BD 28/87 Coefficient of thermal expansion of concrete, = 12 x 10-6 per oC
o
5.8 Short-term fall in temperature, T1 = 43 C
Table 1
3
(Assume that, Cement content - 400 kg/m maximum value given in BD document,
18mm Plywood form work, Summer condition & Thickness of section <500mm)
o
BD 28/87 Long-term fall in temperature, T2 = 0 C
5.9 (Length of slab< 15m)
0
T2 assumed as 0 C for width of section lesser than 15m
-6
Therefore, Thermal strain, th = 413 x10 th
= 412.8 x10-6
BD 28/87 Restraint factor, External R = 0.60 R, external
5.11 (edge restraint for box type) = 0.6
Table 2
-6
BD 28/87 Ultimate tensile strain capacity of concrete, ult = 200 x10
5.3
Reinforcement required for external thermal
cracking, As = 29.7
2
Try T 10 As req = 297 mm /m
2
Use T 10 @ 150 ( As pro = 524 mm /m ) Use
T 10 @ 150
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 20
Reference Calculation Output
2
As Provided = 905 mm /m
= As/bd
b = 1000 mm d = 199 mm
= 0.0045
2 2
Es = 200 kN/mm Ec = 28 kN/mm
e = 2Es/Ec
e = 14.286
1/2
dc/d = e [(1+2/ e ) -1]
Depth of concrete in
compression dc = 60.0 mm
z = d-dc/3
= 179 mm
Check for stress levels
Bending moment at
serviceability limit state (Ms) = 24.5 kNm/m
c = 2Ms/bzdc
2 2
BS 5400 c = 4.57 N/mm < a = 15 N/mm
Part 4 Hence ok
Table 2
se = Ms/zAs
2 2
= 151.3 N/mm < s = 345 N/mm
Hence ok
BS 5400 m = 1-
-9
5.8.8.2 = {(3.8).bt.h.(a'-dc)/( s.As.(h-dc)}.{(1-Mq/Mg).10 }
eq : 25
1 = My1/EcIc M = 25 kNm
3 3 2
Ic = bd {1/3(dc/d) +eAs/bd(1-dc/d) }
9 4
0.32 x 10 mm
y1 = 190 mm
-3
1 = 1.034 x 10
s = Mys/EcIc
-3
= 0.38 x 10
Mq = 21.4 Mg = 3.1
-3
= -16.39 x 10
m = 1 -
-3
= 1.034 x 10
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 21
Reference Calculation Output
m< 0, m = 1
Part 4 1+2(acr-cnom)/(h-dc)
eq : 24
= 0.176 mm < 0.25 mm
Hence ok
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
2
As Provided = 905 mm /m
= As/bd
b = 1000 mm d = 150 mm
= 0.0060
2 2
Es = 200 kN/mm Ec = 28 kN/mm
e = 2Es/Ec
e = 14.286
1/2
dc/d = e [(1+2/ e ) -1]
Depth of concrete in
compression dc = 50.7 mm
z = d-dc/3
= 133 mm
Check for stress levels
Bending moment at
serviceability limit state (Ms) = 6.8 kNm/m
c = 2Ms/bzdc
2 2
BS 5400 c = 2.02 N/mm < a = 15 N/mm
Part 4 Hence ok
Table 2
se = Ms/zAs
2 2
= 56.5 N/mm < s = 345 N/mm
Hence ok
BS 5400 m = 1-
-9
5.8.8.2 = {(3.8).bt.h.(a'-dc)/( s.As.(h-dc)}.{(1-Mq/Mg).10 }
eq : 25
1 = My1/EcIc M = 6.8 kNm
3 3 2
Ic = bd {1/3(dc/d) +eAs/bd(1-dc/d) }
9 4
0.17 x 10 mm
y1 = 149 mm
-3
1 = 0.424 x 10
s = Mys/EcIc
-3
= 0.14 x 10
Mq = 2.8 Mg = 4.0
-3
= 0.40 x 10
m = 1 -
-3
= 0.023 x 10 <0
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 23
Reference Calculation Output
m< 0, m = 0
Part 4 1+2(acr-cnom)/(h-dc)
eq : 24
= 0.004 mm < 0.25 mm
Hence ok
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Z = 0.950 d
= 0.95x150 = 142.5 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 23.32x106/0.87x460x142.5 = 409 mm /m =
2
409 mm /m
2
Use T 10 @ 125 ( As = 628 mm ) As pro =
2
628 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Z = 0.950 d
= 0.95x140 = 133.0 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 7.59x106/0.87x460x133 = 143 mm /m =
2
143 mm /m
2
Use T 10 @ 150 ( As = 524 mm ) As pro =
2
524 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Hence O.K
1/3 1/3
BS 5400 Allow. shear resistance = (0.27/ m)(100As/bwd) (fcu) s
Part 4: 1990 , sv c
5.3.3.2 Where, depth ratio, s
= (500/d)1/4
= (500/140)^1/4
= 1.37 or 0.7 (greater value)
sv c
= (0.27/1.25)x(100x0/1000x140)x1/3x(30)^1/3x1.37
2
= 0.66 N/mm
Hence shear reinforcement is not required
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 27
Reference Calculation Output
4.4 DESIGN OF WING WALLS
4.4.1 DESIGN ABOUT VERTICAL AXIS
4.4.1.1 DESIGN FOR BENDING IN CHAMPHER
Z = 0.950 d
= 0.95x249 = 236.6 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 41.25x106/0.87x460x236.6 = 436 mm /m =
2
436 mm /m
2
Use T 12 @ 150 ( As = 754 mm ) As pro =
2
754 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Hence o.k
Z = 0.934 d
= 0.934x149 = 139.2 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 32.78x106/0.87x460x139.2 = 588 mm /m =
2
588 mm /m
2
Use T 12 @ 150 ( As = 754 mm ) As pro =
2
754 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Z = 0.950 d
= 0.95x138 = 131.1 mm
Main reinforcement
equation 1 As = M / 0.87fyz
2 As req
= 7.04x106/0.87x460x131.1 = 134 mm /m =
2
134 mm /m
2
Use T 10 @ 150 ( As = 524 mm ) As pro =
2
524 mm /m
Hence o.k
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Hence O.K
1/3 1/3
BS 5400 Allow. shear resistance = (0.27/ m)(100As/bwd) (fcu) s
Part 4: 1990 , sv c
5.3.3.2 Where, depth ratio, s
= (500/d)1/4
= (500/149)^1/4
= 1.35 or 0.7 (greater value)
sv c
= (0.27/1.25)x(100x0/1000x149)x1/3x(30)^1/3x1.35
2
= 0.64 N/mm
Hence shear reinforcement is not required
ASIAN DEVELOPMENT BANK FUNDED CONFLICT AFFECTED REGION EMERGENCY PROJECT - PARANTHAN POONERYN ROAD (B357)
Designed HJKG Sandaruwan Date 12/03/2012
BOX CULVERT (CLEAR SPAN - 1.2m)
Checked PIU Samarasignhe Date 12/03/2012
MASTER HELLIE'S ENGINEERING CONSULTANTS (Pvt.) LTD Page 31