You are on page 1of 19
at ENGINEERING SPECIFICATION FOR THERMAL INSULATION DESIGN L-101 WORK NO. BA~0265 ‘TCL PROJECT 3 | 0ct.30%| F/WAL sab 3 | S6P.1245| For Final 6 a 2 | #50.22%| _ Revised as er marks" A |SShnebl Inn | YL 1 | mar.3t%4 | Revised as per marks! BM | ¢.Sokmel| Qu | Yt : 0 | ot.2983 | For Approval Voth OD ut YZ F a DATE. DESCRIPTION ‘MADE BY | CHIEF a PE Py ‘NO. ‘TABLE OF CONTENTS ‘DATED PAGES @ Toxo Encineerinc Corr. TOKYO JAPAN Consortium of ‘Toyo Engineering Corporation |Hitachi Zosen Corporation ani Toyo-Thai Corporation Ltd. a TOKO om JAPAN ‘Toyo Excxaaanc Cox. ENGINEERING SPECIFICATION ‘THERMAL INSULATION DESIGN ISSUED SEP, 12 95 (REVISION HISTORY SHEET) REVISION HISTORY SHEET ‘These sheets are intended to assist in identifying the changes. ‘The revised sheets are issued with the cover sheet and this revision history sheets. ‘The old sheets should be superseded by the attached. REVISION NO.3 The following revisions have been made in this Engineering Specification. Location CONTENTS: Para.2.6.1 Para, 2.6.2 TABLE 1 Description ‘The tittle of TABLE 3 Modified. Deleted. Attached without change (missing in REV.2). 1s corrected. ENGINEERING SPECIFICATION ‘THERMAL INSULATION DESIGN L-101 (REVISION HISTORY SHEET) PAGE 1 OF 1 REVISION HISTORY SHEET ‘These sheets are intended to assist in identifing the changes. ‘The revised sheots are issued with tho cover sheet and this revision history sheets. The old sheets should be auperseded by the attached. REVISION No.2 ‘The following revisions have been made in this Engineering Specification. Location Description Para.2.1.1 Table Fire protection specified. Para, 2.1.4 Revised, Para, 2.1.5 Specified newly. Para, 2.6 Specified newly. Para. 2.7.5 Specified newly... Pars. 3.2 Notes: (2) The applicable materiel corrected based on specification as specified in contract document. Para, 3.5 Specified newly. Pera, 3.6.2 Specified newly, Para. 3.7.1 Table Fire protection insulation specified.

You might also like