BOILER FOUNDATION, SECTION A & B MWHM-UPG.60-12-C-CF-BO.03 3/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
I.D FAN FOUNDATION MODEL : AM 41. ACW 0 MWHM-UPG.60-12-C-CF-BO.04 4/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
AIR FAN & FUEL FEEDER FAN FOUNDATION MWHM-UPG.60-12-C-CF-BO.06 6/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
DUST COLLECTOR FOUNDATION MWHM-UPG.60-12-C-CF-BO.07 7/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
BLOWDOWN PIT FOUNDATION MWHM-UPG.60-12-C-CF-BO.08 8/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
TYPICAL POCKET HOLES FOR HOLD DOWN BOLTS MWHM-UPG.60-12-C-CF-BO.09 9/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
DEAERATOR PLATFORM FOUNDATION MWHM-UPG.60-12-C-CF-BO.10 10/20 DAO 20-Apr-12 A3 22-May-12 A3 RE-LAYOUT OF DAERATOR PLATFORM
FOUNDATION
DEAERATOR PLATFORM FOUNDATION (TYPE F2) MWHM-UPG.60-12-C-CF-BO.10.01 11/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
REGENERATION TANK FOUNDATION MWHM-UPG.60-12-C-CF-BO.11 12/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
ANION AND CATION TANK FOUNDATION MWHM-UPG.60-12-C-CF-BO.13 14/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
BOILER CONTROL PANEL FOUNDATION, REGENERATION MWHM-UPG.60-12-C-CF-BO.14 DAO 20-Apr-12 A3 22-May-12 A3 REVISION OF REGENERATION PUMP FOUNDATION
15/20
PUMP FOUNDATION ELEVATION
TYPICAL SECTION OF NEW CONCRETE FLOOR MWHM-UPG.60-12-C-CF-BO.15 16/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
SMART FIBER HOPPER FOUNDATION MWHM-UPG.60-12-C-CF-BO.16 17/20 DAO 22-May-12 A3 ISSUED FOR TENDER
FEED WATER PUMP (BOILER NO. 2) MWHM-UPG.60-12-C-CF-BO.17 18/20 DAO 22-May-12 A3 ISSUED FOR TENDER
SUPPORT RETRIEVAL CONVEYOR FOUNDATION MWHM-UPG.60-12-C-CF-BO.18 19/20 DAO 22-May-12 A3 ISSUED FOR TENDER
MCC WATER TREATMENT PLANT FOUNDATION MWHM-UPG.60-12-C-CF-BO.19 20/20 DAO 13-Nov-12 A3 ISSUED FOR TENDER
PLAN OF KERNEL SILO FOUNDATION AND SECTIONS MWHM-UPG.60-12-C-CF-NK.03 3/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER
1
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : November 23rd, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C2-1112 Revisi : 2
SEPARATING COLUMN PLATFORM FOUNDATION MWHM-UPG.60-12-C-CF-NK.05 5/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER
PLAN OF NUT POLISHING DRUM, DEPERICARPER MWHM-UPG.60-12-C-CF-NK.06 6/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER
FOUNDATION
NUT POLISHING DRUM FOUNDATION MWHM-UPG.60-12-C-CF-NK.07 7/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER
3 CLARIFICATION STATION
PLAN OF CLARIFICATION STATION MWHM-UPG.60-11-C-CF-CL.01 1/7 RT/DAO 18/4/2012 A3 21/5/2012 A3 13-Nov-12 A3 ADDITIONAL FOUNDATION FOR CONTROL PANEL
FOUNDATION OF TYPE 1 & 2, 200x400 SLOOF (TYPICAL) MWHM-UPG.60-11-C-CF-CL.02 2/7 RT 18/4/2012 A3 INITIAL ISSUED
4 PRESSING STATION
PLAN OF PRESSING FOUNDATION MWHM-UPG.60-11-C-CF-PE.01 1/7 RT/DAO 19-Apr-12 A3 24-May-12 A3 13-Nov-12 A3 ADDITIONAL FOUNDATION FOR CONTROL PANEL
FOUNDATION OF TYPE C, FOUNDATION OF TYPE A5 MWHM-UPG.60-11-C-CF-PE.05 5/7 RT 19-Apr-12 A3 24-May-12 A3 ADDITIONAL FOUNDATION OF TYPE A5
2
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : November 23rd, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C2-1112 Revisi : 2
5 THRESSING STATION
FOUNDATION OF TYPE D & E MWHM-UPG.60-11-C-CF-TH.02 4/9 RT 18-Apr-12 A3 25-May-12 A3 REVISION OF FOUNDATION TYPE D
PLAN OF WATER TREATMENT PLANT FOUNDATION MWHM-UPG.60-11-C-CF-WA.01 1/5 RT 19-Apr-12 A3 23-May-12 A3 REDESIGN & REPOSITION OF FOUNDATION TYPE D
FOUNDATION OF TYPE A (WATER CLARIFIER TANK) MWHM-UPG.60-11-C-CF-WA.02 2/5 RT 19-Apr-12 A3 ISSUED FOR TENDER
FOUNDATION OF TYPE B (WATER CLARIFIER TANK) MWHM-UPG.60-11-C-CF-WA.03 3/5 RT 19-Apr-12 A3 ISSUED FOR TENDER
FOUNDATION OF TYPE C (SAND FILTER) MWHM-UPG.60-11-C-CF-WA.04 4/5 RT 19-Apr-12 A3 ISSUED FOR TENDER
FOUNDATION OF TYPE D (PUMP) MWHM-UPG.60-11-C-CF-WA.05 5/5 RT 19-Apr-12 A3 23-May-12 A3 REDESIGN OF FOUNDATION TYPE D
7 POWER HOUSE
3
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : November 23rd, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C2-1112 Revisi : 2
4
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : May 25th, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C1-0512 Revisi : 1
BOILER FOUNDATION, SECTION A & B MWHM-UPG.60-12-C-CF-BO.03 3/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
I.D FAN FOUNDATION MODEL : AM 41. ACW 0 MWHM-UPG.60-12-C-CF-BO.04 4/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
AIR FAN & FUEL FEEDER FAN FOUNDATION MWHM-UPG.60-12-C-CF-BO.06 6/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
DUST COLLECTOR FOUNDATION MWHM-UPG.60-12-C-CF-BO.07 7/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
BLOWDOWN PIT FOUNDATION MWHM-UPG.60-12-C-CF-BO.08 8/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
TYPICAL POCKET HOLES FOR HOLD DOWN BOLTS MWHM-UPG.60-12-C-CF-BO.09 9/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
RE-LAYOUT OF DAERATOR PLATFORM
DEAERATOR PLATFORM FOUNDATION MWHM-UPG.60-12-C-CF-BO.10 10/18 DAO 20/4/2012 A3 22/5/2012 A3
FOUNDATION
DEAERATOR PLATFORM FOUNDATION (TYPE F2) MWHM-UPG.60-12-C-CF-BO.10.01 11/18 DAO 22/5/2012 A3 ISSUED FOR TENDER
REGENERATION TANK FOUNDATION MWHM-UPG.60-12-C-CF-BO.11 12/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
ANION AND CATION TANK FOUNDATION MWHM-UPG.60-12-C-CF-BO.13 14/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
BOILER CONTROL PANEL FOUNDATION, REGENERATION REVISION OF REGENERATION PUMP FOUNDATION
MWHM-UPG.60-12-C-CF-BO.14 15/18 DAO 20/4/2012 A3 22/5/2012 A3
PUMP FOUNDATION ELEVATION
TYPICAL SECTION OF NEW CONCRETE FLOOR MWHM-UPG.60-12-C-CF-BO.15 16/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
SMART FIBER HOPPER FOUNDATION MWHM-UPG.60-12-C-CF-BO.16 17/18 DAO 22/5/2012 A3 ISSUED FOR TENDER
FEED WATER PUMP (BOILER NO. 2) MWHM-UPG.60-12-C-CF-BO.17 18/18 DAO 22/5/2012 A3 ISSUED FOR TENDER
PLAN OF KERNEL SILO FOUNDATION AND SECTIONS MWHM-UPG.60-12-C-CF-NK.03 3/11 DAO 20/4/2012 A3 ISSUED FOR TENDER
FAN & HEATER FOUNDATION MWHM-UPG.60-12-C-CF-NK.04 4/11 DAO 20/4/2012 A3 ISSUED FOR TENDER
SEPARATING COLUMN PLATFORM FOUNDATION MWHM-UPG.60-12-C-CF-NK.05 5/11 DAO 20/4/2012 A3 ISSUED FOR TENDER
5
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : May 25th, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C1-0512 Revisi : 1
3 CLARIFICATION STATION
FOUNDATION OF TYPE 1 & 2, 200x400 SLOOF (TYPICAL) MWHM-UPG.60-11-C-CF-CL.02 2/5 RT 18/4/2012 A3 INITIAL ISSUED
4 PRESSING STATION
FOUNDATION OF TYPE C, FOUNDATION OF TYPE A5 MWHM-UPG.60-11-C-CF-PE.05 5/6 RT 19/4/2012 A3 24/5/2012 A3 ADDITIONAL FOUNDATION OF TYPE A5
5 THRESSING STATION
6
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : May 25th, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C1-0512 Revisi : 1
PLAN OF WATER TREATMENT PLANT FOUNDATION MWHM-UPG.60-11-C-CF-WA.01 1/5 RT 19/4/2012 A3 23/5/2012 A3 REDESIGN & REPOSITION OF FOUNDATION TYPE D
FOUNDATION OF TYPE A (WATER CLARIFIER TANK) MWHM-UPG.60-11-C-CF-WA.02 2/5 RT 19/4/2012 A3 ISSUED FOR TENDER
FOUNDATION OF TYPE B (WATER CLARIFIER TANK) MWHM-UPG.60-11-C-CF-WA.03 3/5 RT 19/4/2012 A3 ISSUED FOR TENDER
FOUNDATION OF TYPE C (SAND FILTER) MWHM-UPG.60-11-C-CF-WA.04 4/5 RT 19/4/2012 A3 ISSUED FOR TENDER
FOUNDATION OF TYPE D (PUMP) MWHM-UPG.60-11-C-CF-WA.05 5/5 RT 19/4/2012 A3 23/5/2012 A3 REDESIGN OF FOUNDATION TYPE D
7 POWER HOUSE
8 FAT PIT