No. DRAWING TITLE DRAWING NO. Sheet Draftman 0 1 2 3
DESCRIPTION
1 BOILER STATION
PLAN OF BOILER STATION MWHM-UPG.60-12-C-CF-BO.01 1/20 DAO 20-Apr-12 A3 22-May-12 A3 13-Nov-12 ADDITIONAL PANEL FOUNDATION FOR MCC
BOILER WATER TREATMENT PLANT LINE B
SECTION 1, 2, 3 & 4, DRAIN COVER MWHM-UPG.60-12-C-CF-BO.02 2/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

BOILER FOUNDATION, SECTION A & B MWHM-UPG.60-12-C-CF-BO.03 3/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

I.D FAN FOUNDATION MODEL : AM 41. ACW 0 MWHM-UPG.60-12-C-CF-BO.04 4/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

CHIMNEY FOUNDATION MWHM-UPG.60-12-C-CF-BO.05 5/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

AIR FAN & FUEL FEEDER FAN FOUNDATION MWHM-UPG.60-12-C-CF-BO.06 6/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

DUST COLLECTOR FOUNDATION MWHM-UPG.60-12-C-CF-BO.07 7/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

BLOWDOWN PIT FOUNDATION MWHM-UPG.60-12-C-CF-BO.08 8/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

TYPICAL POCKET HOLES FOR HOLD DOWN BOLTS MWHM-UPG.60-12-C-CF-BO.09 9/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
DEAERATOR PLATFORM FOUNDATION MWHM-UPG.60-12-C-CF-BO.10 10/20 DAO 20-Apr-12 A3 22-May-12 A3 RE-LAYOUT OF DAERATOR PLATFORM
FOUNDATION
DEAERATOR PLATFORM FOUNDATION (TYPE F2) MWHM-UPG.60-12-C-CF-BO.10.01 11/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

REGENERATION TANK FOUNDATION MWHM-UPG.60-12-C-CF-BO.11 12/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

DUST COLLECTOR MWHM-UPG.60-12-C-CF-BO.12 13/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

ANION AND CATION TANK FOUNDATION MWHM-UPG.60-12-C-CF-BO.13 14/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER
BOILER CONTROL PANEL FOUNDATION, REGENERATION MWHM-UPG.60-12-C-CF-BO.14 DAO 20-Apr-12 A3 22-May-12 A3 REVISION OF REGENERATION PUMP FOUNDATION
15/20
PUMP FOUNDATION ELEVATION
TYPICAL SECTION OF NEW CONCRETE FLOOR MWHM-UPG.60-12-C-CF-BO.15 16/20 DAO 20-Apr-12 A3 ISSUED FOR TENDER

SMART FIBER HOPPER FOUNDATION MWHM-UPG.60-12-C-CF-BO.16 17/20 DAO 22-May-12 A3 ISSUED FOR TENDER

FEED WATER PUMP (BOILER NO. 2) MWHM-UPG.60-12-C-CF-BO.17 18/20 DAO 22-May-12 A3 ISSUED FOR TENDER

SUPPORT RETRIEVAL CONVEYOR FOUNDATION MWHM-UPG.60-12-C-CF-BO.18 19/20 DAO 22-May-12 A3 ISSUED FOR TENDER

MCC WATER TREATMENT PLANT FOUNDATION MWHM-UPG.60-12-C-CF-BO.19 20/20 DAO 13-Nov-12 A3 ISSUED FOR TENDER

2 NUT & KERNEL STATION


PLAN OF KERNEL RECOVERY FOUNDATION MWHM-UPG.60-12-C-CF-NK.01 1/11 DAO 20-Apr-12 A3 22-May-12 A3 ADDITION OF FIBER CYCLONE STRUCTURE
FOUNDATION
PLAN OF CLAYBATH FOUNDATION AND SECTIONS MWHM-UPG.60-12-C-CF-NK.02 2/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER

PLAN OF KERNEL SILO FOUNDATION AND SECTIONS MWHM-UPG.60-12-C-CF-NK.03 3/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER

1
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : November 23rd, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C2-1112 Revisi : 2

No. of Initial Revision


No. DRAWING TITLE DRAWING NO. Sheet Draftman 0 1 2 3
DESCRIPTION
FAN & HEATER FOUNDATION MWHM-UPG.60-12-C-CF-NK.04 4/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER

SEPARATING COLUMN PLATFORM FOUNDATION MWHM-UPG.60-12-C-CF-NK.05 5/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER
PLAN OF NUT POLISHING DRUM, DEPERICARPER MWHM-UPG.60-12-C-CF-NK.06 6/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER
FOUNDATION
NUT POLISHING DRUM FOUNDATION MWHM-UPG.60-12-C-CF-NK.07 7/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER

DEPERICARPER FOUNDATION MWHM-UPG.60-12-C-CF-NK.08 8/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER


FIBER CYCLONE STRUCTURE FOUNDATION MWHM-UPG.60-12-C-CF-NK.09 9/11 DAO 20-Apr-12 A3 22-May-12 A3 ADDITION OF FIBER CYCLONE STRUCTURE
FOUNDATION
NUT HOPPER FOUNDATION MWHM-UPG.60-12-C-CF-NK.10 10/11 DAO 20-Apr-12 A3 ISSUED FOR TENDER
FOUNDATION OF TYPE 7A, FOUNDATION OF CABLE TRENCH MWHM-UPG.60-12-C-CF-NK.11 11/11 DAO 20-Apr-12 A3 13-Nov-12 A3 REVISION OF PANEL FOUNDATION DIMENSION
7B, DETAIL OF DRAIN

3 CLARIFICATION STATION
PLAN OF CLARIFICATION STATION MWHM-UPG.60-11-C-CF-CL.01 1/7 RT/DAO 18/4/2012 A3 21/5/2012 A3 13-Nov-12 A3 ADDITIONAL FOUNDATION FOR CONTROL PANEL

FOUNDATION OF TYPE 1 & 2, 200x400 SLOOF (TYPICAL) MWHM-UPG.60-11-C-CF-CL.02 2/7 RT 18/4/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE 3 MWHM-UPG.60-11-C-CF-CL.03 3/7 RT 18/4/2012 A3 25/5/2012 A3 REDESIGN ON FOUNDATION OF TYPE 3

FOUNDATION OF TYPE 3A & 3B MWHM-UPG.60-11-C-CF-CL.03.01 4/7 RT 25/5/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE 4 & 5 MWHM-UPG.60-11-C-CF-CL.04 5/7 RT 18/4/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE 6 & 7 MWHM-UPG.60-11-C-CF-CL.05 6/7 RT 18/4/2012 A3 INITIAL ISSUED


MCC 3B PANEL FOUNDATION (FOR CLARIFICATION STATION MWHM-UPG.60-11-C-CF-CL.06 7/7 DAO 13-Nov-12 A3 INITIAL ISSUED
LINE B)

4 PRESSING STATION
PLAN OF PRESSING FOUNDATION MWHM-UPG.60-11-C-CF-PE.01 1/7 RT/DAO 19-Apr-12 A3 24-May-12 A3 13-Nov-12 A3 ADDITIONAL FOUNDATION FOR CONTROL PANEL

FOUNDATION OF TYPE A1 & A2, 200 x 400 GROUND BEAM


MWHM-UPG.60-11-C-CF-PE.02 2/7 RT 19-Apr-12 A3 INITIAL ISSUED
(TYPICAL)
FOUNDATION OF TYPE A3 & A4 MWHM-UPG.60-11-C-CF-PE.03 3/7 RT 19-Apr-12 A3 INITIAL ISSUED

FOUNDATION OF TYPE B1, B2, B3 MWHM-UPG.60-11-C-CF-PE.04 4/7 RT 19-Apr-12 A3 INITIAL ISSUED

FOUNDATION OF TYPE C, FOUNDATION OF TYPE A5 MWHM-UPG.60-11-C-CF-PE.05 5/7 RT 19-Apr-12 A3 24-May-12 A3 ADDITIONAL FOUNDATION OF TYPE A5

FOUNDATION OF TYPE C1 & C2 MWHM-UPG.60-11-C-CF-PE.06 6/7 RT 24-May-12 A3 INITIAL ISSUED

2
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : November 23rd, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C2-1112 Revisi : 2

No. of Initial Revision


No. DRAWING TITLE DRAWING NO. Sheet Draftman 0 1 2 3
DESCRIPTION
FOUNDATION MCC-1B MWHM-UPG.60-11-C-CF-PE.07 7/7 DAO 13-Nov-12 A3 INITIAL ISSUED

5 THRESSING STATION

LYAOUT OF TRESHING STATION MWHM-UPG.60-11-C-CF-TH.01 1/9 RT 18-Apr-12 A3 19-May-12 A3 AS SHOWN

PLAN OF TRESHING FOUNDATION MWHM-UPG.60-11-C-CF-TH.01.01 2/9 RT 18-Apr-12 A3 19-May-12 A3 AS SHOWN

PLAN OF TRESHING FOUNDATION MWHM-UPG.60-11-C-CF-TH.01.02 3/9 RT 18-Apr-12 A3 INITIAL ISSUED

FOUNDATION OF TYPE D & E MWHM-UPG.60-11-C-CF-TH.02 4/9 RT 18-Apr-12 A3 25-May-12 A3 REVISION OF FOUNDATION TYPE D

FOUNDATION OF TYPE D1 MWHM-UPG.60-11-C-CF-TH.02.01 5/9 RT 18-Apr-12 A3 25-May-12 A3 REVISION OF FOUNDATION TYPE D1

FOUNDATION OF TYPE F & G MWHM-UPG.60-11-C-CF-TH.03 6/9 RT 18-Apr-12 A3 INITIAL ISSUED

FOUNDATION OF TYPE H1 & H2 MWHM-UPG.60-11-C-CF-TH.04 7/9 RT 18-Apr-12 A3 INITIAL ISSUED

FOUNDATION OF TYPE I & J MWHM-UPG.60-11-C-CF-TH.05 8/9 RT 18-Apr-12 A3 INITIAL ISSUED

FOUNDATION OF TYPE K & L MWHM-UPG.60-11-C-CF-TH.06 9/9 RT 18-Apr-12 A3 INITIAL ISSUED

6 WATER TREATMENT PLANT

PLAN OF WATER TREATMENT PLANT FOUNDATION MWHM-UPG.60-11-C-CF-WA.01 1/5 RT 19-Apr-12 A3 23-May-12 A3 REDESIGN & REPOSITION OF FOUNDATION TYPE D

FOUNDATION OF TYPE A (WATER CLARIFIER TANK) MWHM-UPG.60-11-C-CF-WA.02 2/5 RT 19-Apr-12 A3 ISSUED FOR TENDER

FOUNDATION OF TYPE B (WATER CLARIFIER TANK) MWHM-UPG.60-11-C-CF-WA.03 3/5 RT 19-Apr-12 A3 ISSUED FOR TENDER

FOUNDATION OF TYPE C (SAND FILTER) MWHM-UPG.60-11-C-CF-WA.04 4/5 RT 19-Apr-12 A3 ISSUED FOR TENDER

FOUNDATION OF TYPE D (PUMP) MWHM-UPG.60-11-C-CF-WA.05 5/5 RT 19-Apr-12 A3 23-May-12 A3 REDESIGN OF FOUNDATION TYPE D

7 POWER HOUSE

LAYOUT OF POWER HOUSE MWHM-UPG.60-11-C-CF-PS.01 1/3 RT 19-Apr-12 A3 21-May-12 A3 AS SHOWN


FOUNDATION OF TYPE A & A1 (STEAM SEPARATOR SUPPORT) MWHM-UPG.60-11-C-CF-PS.02 2/3 RT 19-Apr-12 A3 21-May-12 A3 CHANGE OF FOUNDATION TYPE A; ADDITIONAL
FOUNDATION OF TYPE C
FOUNDATION OF TYPE B (TURBINE ALTERNATOR) MWHM-UPG.60-11-C-CF-PS.03 3/3 RT 21-May-12 A3 ISSUED FOR TENDER

3
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : November 23rd, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C2-1112 Revisi : 2

No. of Initial Revision


No. DRAWING TITLE DRAWING NO. Sheet Draftman 0 1 2 3
DESCRIPTION
8 FAT PIT

PLAN OF FAT PIT MWHM-UPG.60-11-C-CF-FPT.01 1/4 RT 21-May-12 A3 INITIAL ISSUED

SECTION A, DETAIL 1, 2 & 3 MWHM-UPG.60-11-C-CF-FPT.02 2/4 RT 21-May-12 A3 INITIAL ISSUED


SECTION B, SECTION C (STIFFENER WALL), DETAIL OF
MWHM-UPG.60-11-C-CF-FPT.03 3/4 RT 21-May-12 A3 INITIAL ISSUED
SLUDGE CENTRIFUGE DRAIN
SECTION A1 & PLAN OF ROOF MWHM-UPG.60-11-C-CF-FPT.04 4/4 RT 21-May-12 A3 INITIAL ISSUED

4
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : May 25th, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C1-0512 Revisi : 1

No. of Initial Revision


No. DRAWING TITLE DRAWING NO. Sheet Draftman 0 1 2 3
DESCRIPTION
1 BOILER STATION
ADDITIONAL SMART FIBER HOPPER; DELETION OF
PLAN OF BOILER STATION MWHM-UPG.60-12-C-CF-BO.01 1/18 DAO 20/4/2012 A3 22/5/2012 A3
ANION & CATION FOUNDATION
SECTION 1, 2, 3 & 4, DRAIN COVER MWHM-UPG.60-12-C-CF-BO.02 2/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

BOILER FOUNDATION, SECTION A & B MWHM-UPG.60-12-C-CF-BO.03 3/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

I.D FAN FOUNDATION MODEL : AM 41. ACW 0 MWHM-UPG.60-12-C-CF-BO.04 4/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

CHIMNEY FOUNDATION MWHM-UPG.60-12-C-CF-BO.05 5/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

AIR FAN & FUEL FEEDER FAN FOUNDATION MWHM-UPG.60-12-C-CF-BO.06 6/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

DUST COLLECTOR FOUNDATION MWHM-UPG.60-12-C-CF-BO.07 7/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

BLOWDOWN PIT FOUNDATION MWHM-UPG.60-12-C-CF-BO.08 8/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

TYPICAL POCKET HOLES FOR HOLD DOWN BOLTS MWHM-UPG.60-12-C-CF-BO.09 9/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
RE-LAYOUT OF DAERATOR PLATFORM
DEAERATOR PLATFORM FOUNDATION MWHM-UPG.60-12-C-CF-BO.10 10/18 DAO 20/4/2012 A3 22/5/2012 A3
FOUNDATION
DEAERATOR PLATFORM FOUNDATION (TYPE F2) MWHM-UPG.60-12-C-CF-BO.10.01 11/18 DAO 22/5/2012 A3 ISSUED FOR TENDER

REGENERATION TANK FOUNDATION MWHM-UPG.60-12-C-CF-BO.11 12/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

DUST COLLECTOR MWHM-UPG.60-12-C-CF-BO.12 13/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

ANION AND CATION TANK FOUNDATION MWHM-UPG.60-12-C-CF-BO.13 14/18 DAO 20/4/2012 A3 ISSUED FOR TENDER
BOILER CONTROL PANEL FOUNDATION, REGENERATION REVISION OF REGENERATION PUMP FOUNDATION
MWHM-UPG.60-12-C-CF-BO.14 15/18 DAO 20/4/2012 A3 22/5/2012 A3
PUMP FOUNDATION ELEVATION
TYPICAL SECTION OF NEW CONCRETE FLOOR MWHM-UPG.60-12-C-CF-BO.15 16/18 DAO 20/4/2012 A3 ISSUED FOR TENDER

SMART FIBER HOPPER FOUNDATION MWHM-UPG.60-12-C-CF-BO.16 17/18 DAO 22/5/2012 A3 ISSUED FOR TENDER

FEED WATER PUMP (BOILER NO. 2) MWHM-UPG.60-12-C-CF-BO.17 18/18 DAO 22/5/2012 A3 ISSUED FOR TENDER

2 NUT & KERNEL STATION


ADDITION OF FIBER CYCLONE STRUCTURE
PLAN OF KERNEL RECOVERY FOUNDATION MWHM-UPG.60-12-C-CF-NK.01 1/11 DAO 20/4/2012 A3 22/5/2012 A3
FOUNDATION
PLAN OF CLAYBATH FOUNDATION AND SECTIONS MWHM-UPG.60-12-C-CF-NK.02 2/11 DAO 20/4/2012 A3 ISSUED FOR TENDER

PLAN OF KERNEL SILO FOUNDATION AND SECTIONS MWHM-UPG.60-12-C-CF-NK.03 3/11 DAO 20/4/2012 A3 ISSUED FOR TENDER

FAN & HEATER FOUNDATION MWHM-UPG.60-12-C-CF-NK.04 4/11 DAO 20/4/2012 A3 ISSUED FOR TENDER

SEPARATING COLUMN PLATFORM FOUNDATION MWHM-UPG.60-12-C-CF-NK.05 5/11 DAO 20/4/2012 A3 ISSUED FOR TENDER

5
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : May 25th, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C1-0512 Revisi : 1

No. of Initial Revision


No. DRAWING TITLE DRAWING NO. Sheet Draftman 0 1 2 3
DESCRIPTION
PLAN OF NUT POLISHING DRUM, DEPERICARPER
MWHM-UPG.60-12-C-CF-NK.06 6/11 DAO 20/4/2012 A3 ISSUED FOR TENDER
FOUNDATION
NUT POLISHING DRUM FOUNDATION MWHM-UPG.60-12-C-CF-NK.07 7/11 DAO 20/4/2012 A3 ISSUED FOR TENDER

DEPERICARPER FOUNDATION MWHM-UPG.60-12-C-CF-NK.08 8/11 DAO 20/4/2012 A3 ISSUED FOR TENDER


ADDITION OF FIBER CYCLONE STRUCTURE
FIBER CYCLONE STRUCTURE FOUNDATION MWHM-UPG.60-12-C-CF-NK.09 9/11 DAO 20/4/2012 A3 22/5/2012 A3
FOUNDATION
NUT HOPPER FOUNDATION MWHM-UPG.60-12-C-CF-NK.10 10/11 DAO 20/4/2012 A3 ISSUED FOR TENDER
FOUNDATION OF TYPE 7A, FOUNDATION OF CABLE TRENCH
MWHM-UPG.60-12-C-CF-NK.11 11/11 DAO 20/4/2012 A3 ISSUED FOR TENDER
7B, DETAIL OF DRAIN

3 CLARIFICATION STATION

PLAN OF CLARIFICATION STATION MWHM-UPG.60-11-C-CF-CL.01 1/5 RT 18/4/2012 A3 21/5/2012 A3 AS SHOWN

FOUNDATION OF TYPE 1 & 2, 200x400 SLOOF (TYPICAL) MWHM-UPG.60-11-C-CF-CL.02 2/5 RT 18/4/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE 3 MWHM-UPG.60-11-C-CF-CL.03 3/5 RT 18/4/2012 A3 25/5/2012 A3 REDESIGN ON FOUNDATION OF TYPE 3

FOUNDATION OF TYPE 3A & 3B MWHM-UPG.60-11-C-CF-CL.03.01 4/5 RT 25/5/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE 4 MWHM-UPG.60-11-C-CF-CL.04 5/5 RT 18/4/2012 A3 INITIAL ISSUED

4 PRESSING STATION

PLAN OF PRESSING FOUNDATION MWHM-UPG.60-11-C-CF-PE.01 1/6 RT 19/4/2012 A3 24/5/2012 A3 AS SHOWN


FOUNDATION OF TYPE A1 & A2, 200 x 400 GROUND BEAM
MWHM-UPG.60-11-C-CF-PE.02 2/6 RT 19/4/2012 A3 INITIAL ISSUED
(TYPICAL)
FOUNDATION OF TYPE A3 & A4 MWHM-UPG.60-11-C-CF-PE.03 3/6 RT 19/4/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE B1, B2, B3 MWHM-UPG.60-11-C-CF-PE.04 4/6 RT 19/4/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE C, FOUNDATION OF TYPE A5 MWHM-UPG.60-11-C-CF-PE.05 5/6 RT 19/4/2012 A3 24/5/2012 A3 ADDITIONAL FOUNDATION OF TYPE A5

FOUNDATION OF TYPE C1 & C2 MWHM-UPG.60-11-C-CF-PE.06 6/6 RT 24/5/2012 A3 INITIAL ISSUED

5 THRESSING STATION

LYAOUT OF TRESHING STATION MWHM-UPG.60-11-C-CF-TH.01 1/9 RT 18/4/2012 A3 19/5/2012 A3 AS SHOWN

PLAN OF TRESHING FOUNDATION MWHM-UPG.60-11-C-CF-TH.01.01 2/9 RT 18/4/2012 A3 19/5/2012 A3 AS SHOWN

PLAN OF TRESHING FOUNDATION MWHM-UPG.60-11-C-CF-TH.01.02 3/9 RT 18/4/2012 A3 INITIAL ISSUED

6
DRAWING CONTROL LIST FOR CIVIL
( Only Recent Revision is Used )
Project Owner : PT KRESNA DUTA AGROINDO
Project Title : Muara Wahau POM Upgrading (30 - 60 Tons FFB / Hour) Date : May 25th, 2012
Project Location : PSM 3
Doc.No. : PS-III-3401-C1-0512 Revisi : 1

No. of Initial Revision


No. DRAWING TITLE DRAWING NO. Sheet Draftman 0 1 2 3
DESCRIPTION
FOUNDATION OF TYPE D & E MWHM-UPG.60-11-C-CF-TH.02 4/9 RT 18/4/2012 A3 25/5/2012 A3 REVISION OF FOUNDATION TYPE D

FOUNDATION OF TYPE D1 MWHM-UPG.60-11-C-CF-TH.02.01 5/9 RT 18/4/2012 A3 25/5/2012 A3 REVISION OF FOUNDATION TYPE D1

FOUNDATION OF TYPE F & G MWHM-UPG.60-11-C-CF-TH.03 6/9 RT 18/4/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE H1 & H2 MWHM-UPG.60-11-C-CF-TH.04 7/9 RT 18/4/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE I & J MWHM-UPG.60-11-C-CF-TH.05 8/9 RT 18/4/2012 A3 INITIAL ISSUED

FOUNDATION OF TYPE K & L MWHM-UPG.60-11-C-CF-TH.06 9/9 RT 18/4/2012 A3 INITIAL ISSUED

6 WATER TREATMENT PLANT

PLAN OF WATER TREATMENT PLANT FOUNDATION MWHM-UPG.60-11-C-CF-WA.01 1/5 RT 19/4/2012 A3 23/5/2012 A3 REDESIGN & REPOSITION OF FOUNDATION TYPE D

FOUNDATION OF TYPE A (WATER CLARIFIER TANK) MWHM-UPG.60-11-C-CF-WA.02 2/5 RT 19/4/2012 A3 ISSUED FOR TENDER

FOUNDATION OF TYPE B (WATER CLARIFIER TANK) MWHM-UPG.60-11-C-CF-WA.03 3/5 RT 19/4/2012 A3 ISSUED FOR TENDER

FOUNDATION OF TYPE C (SAND FILTER) MWHM-UPG.60-11-C-CF-WA.04 4/5 RT 19/4/2012 A3 ISSUED FOR TENDER

FOUNDATION OF TYPE D (PUMP) MWHM-UPG.60-11-C-CF-WA.05 5/5 RT 19/4/2012 A3 23/5/2012 A3 REDESIGN OF FOUNDATION TYPE D

7 POWER HOUSE

LAYOUT OF POWER HOUSE MWHM-UPG.60-11-C-CF-PS.01 1/3 RT 19/4/2012 A3 21/5/2012 A3 AS SHOWN


CHANGE OF FOUNDATION TYPE A; ADDITIONAL
FOUNDATION OF TYPE A & A1 (STEAM SEPARATOR SUPPORT) MWHM-UPG.60-11-C-CF-PS.02 2/3 RT 19/4/2012 A3 21/5/2012 A3
FOUNDATION OF TYPE C
FOUNDATION OF TYPE B (TURBINE ALTERNATOR) MWHM-UPG.60-11-C-CF-PS.03 3/3 RT 21/5/2012 A3 ISSUED FOR TENDER

8 FAT PIT

PLAN OF FAT PIT MWHM-UPG.60-11-C-CF-FPT.01 1/4 RT 23/5/2012 A3 INITIAL ISSUED

SECTION A, DETAIL 1, 2 & 3 MWHM-UPG.60-11-C-CF-FPT.02 2/4 RT 21/5/2012 A3 INITIAL ISSUED


SECTION B, SECTION C (STIFFENER WALL), DETAIL OF
MWHM-UPG.60-11-C-CF-FPT.03 3/4 RT 21/5/2012 A3 INITIAL ISSUED
SLUDGE CENTRIFUGE DRAIN
SECTION A1 & PLAN OF ROOF MWHM-UPG.60-11-C-CF-FPT.04 4/4 RT 21/5/2012 A3 INITIAL ISSUED