STOC,ANALIZA LA DATA DE 01.10.

2015 ORA 20

Efect
U.M. Procent rostuire
Denumire material pavele
Contract Marfa efect
Marmosim avizata Executat rostuire
1 2 3 3a 3b

Bordura mica granit 10*15 ML 48 48 43.25 0

Bordura mare granit 30*20*25 ML 1728 1776 1320.02 0

Dale andezit 3 cm MP 3500 3077.04 2886.44 2% 0

Pavele 15*15*10 MP 7000 5292 3906.47 5% 425.68


A DATA DE 01.10.2015 ORA 20:00

Necesar in
Diferenta marfa Procentaj
01.10.2015
Rest de executat+rest executat+sto avizata -existenta
executat Stoc paleti,bucati de executat c,paleti,bucati santier
4 5 6=(3+4) 7=(3+5) 8=(4-2) 8a 9=(6-7)

0 4.75 43.25 48 0 -4.75

255.27 436.5 1575.29 1756.52 19.48 -181.23

596.01 277.27 3482.472 3163.71 -86.67 318.762

3833.29 2154.6 7739.76 6061.07 -769.07 1678.69


Necesar fata
de contract
cu efect
rostuire

10

-4.75

-152.71

-17.528

314.08