You are on page 1of 1

Project IWP Project Date 19/04/2017

Project Ref.
Location Barka #0135
No.
Fire Fighting & Fire Alarm Doc. Ref.
Scope MI-P135-17-IWP-FPS-001
System No.
Main Project Startup
Electroman LLC Doc. Type.
Contractor Questionare
Fire
Maxitech International LLC
Contractor

1. Design & installation standards to be followed.


2. Required latest Architectural drawing (Issued for construction).
3. Other service drawing to confirm the location of fire pipes.
4. Scope of service coordination drawing preparation.
5. Site gradient level information with finished floor level (Required for fire
hydrant).
6. Drawing and document standard formats for drawings & documentation
(KKS coding).
7. Project specification to check the requirements and compliance.
8. Preferred vendor list for MAS preparation (as we proposed our make in
final quotation).
9. Final ROP approved drawing.
10.SUEZ prepared drawing (with SUEZ comments received for all system).
11.Approved MAS copies (All firefighting & fire alarm).
12.General arrangement CAD format softcopy for the fire pump from
manufacturer.
13.Final revised project schedule (received from client).
14.Document submission schedule (to confirm the priority).
15.Document submission procedure to EM.
16.Quantity of documents to be submitted (as hardcopy & softcopy).
17.Project communication sequence.

Prepared By Checked By Approved By


MLN PS SK