GE Low Voltage Circuit Breakers
RMS Digital trips offer increased
accuracy and reliability advances
in low voltage circuit breaker trip
technologyWritten By
Indrajit Purkayastha
and Paul J. Savoie
GE Electrical Distribution
and Control
Copyright - 1988 TEI
| Reprinted with permission from the Conference Record of the
354h Petroleum and Chemical Industry Conference, Dallas,
| Texas, September 12-14, pages 157-165‘Gurrentsenve tip devices for low volage cet breakers
ane aver the yer undergone a acceso of design re
{inant romped ag by Uden for gre
of per daub stems. With the gr a>
Pleaion esate power converters andthe sequen
‘reae in he harmonic conten ofthe power stem cue
rent lw voltage slid sate rip sensing techniques need to
Derecested Thistle wl ee the funtion 9 tow
sllage det breaker ip units snd the nee fr det
‘ns (oot mean square) overerent sets of the dio
{land nonsioumidal current wave inching de percent
‘ror ana
FUNCTION
“The faction ofthe ip device to nate the wiping ofa
Chet breaker whence hdres cent om,
titer between pe condos o fom phase conde
torso grow en grounded yin To perfor is fan
ten elabhy the tp isan negra! pro cc Dedke,
and.does nt reqitesaparte sure of ower. Areal
{ute tw nes png eter by sess tp atch
tomechnialyengge np har lectromechanieal ep)
renege a typ sles (od ate tp)
SOLID STATE TRIP UNITS.
Sol sate wip unis fective prove the long, short
ta nstanancous protection characters, ih the
!ukdiional advantage of emproned te erent acer.
fn expanded wiser adjstnen fo peered sem coord
‘ton nd select
Avoid. state nip ystem cons of current sensors,
tection progeamiser and a oleno orf sir, The
rent enor prod current sgh as wel cont
power wo the proton programmerfor the wid ate
Fei tal ndieators and wiping energy
CHANGING POWER SYSTEM REQUIREMENTS
Icha ben el documented hit harmonic cents and
doluges are gered by dacontinsousand oatinear
loos sich rete eswanve welder ac urnaes and
discharge ighing, Hoon he harmonic erent
ites have git non power ye ad
fave ented ite dorton wo thee sat caveat sane
shape. Homever, eu the nrc eof ate por
enters ich sco eon eters (SR), power
System hamoticarem mages ae nesting
“The magnitude ofthe SCR generated harmonic crtentis
governed bythe dey angle nd dhe eomnttng ese
tance Interns of mails ofthe fundamental 6 het
‘reat, the predainant harmonies hat suse measurable
Astron atte power gstem sey sate curent sae
Shape ange frat he hrs ce ocachange ght. to
ith seventh eleven and teenth genre by apa
phase contolled rece.
PEAK CURRENT SENSING
istorely,peakletecing cleconie rp uni of analog or
Ail design have been aise inn suming ey
ste snot current where te relationship betscen
peskand ysis el no of 118, Foe per scm
‘whose current wave bsinsoldal aero percent hartone
Content) peak dececting elton wip deg provide sc
“urate overload and otereurrent protection Hemet 8
‘eyo cuenta oa power me he
Stead tate caren becomes inetsaghwonsinsoal
‘ue tthe increased harmonic content. This tay ease he
peak detecting elctonic ps, forthe pve vercurent
ncn, wo ovexprotect or undesproset
rer protection occurs when he peak ahi of the crrent
(arronie pin endamenta restate ck a
to begreter tha the actin rs ste ate cere Asan
‘xampe, gute | repesentes nator wth 10 percent
‘etre cuneh coment Therma
Sinpere Bed on te pra ite of 110 amperes howe
‘eas pure ssl alsiation woth iid 11/
Tid 778 amperes. A pak sensing ust t 72 an
pes would “nudsance tip and thas Oerpotet
corner sa
fiNAerREs)
00 aH aie nos ene
“TM aN Secon)
gue