You are on page 1of 1

ATR42-400/-500 MRB Report

TASKS TRANSFERRED TO ZONAL

INTRODUCTION
This section is composed of 2 sub-sections :
8-1 List of systems/powerplant tasks transferred to zonal
8-2 List of structure tasks transferred to zonal

8-1 and 8-2 sections list the tasks coming respectively from systems/powerplant and structure MSG-3 working
groups that are transferred to zonal working group.
The traceability is ensured through these sections as well as in MSG-3 analyses.
These tasks are covered by one or several zonal tasks and consequently have not to be performed individually.

For appropriate traceability, such tasks are listed with their original systems /structure task reference
and the zonal tasks references that are transferred to.

Issue : NOV 30/ 11 Section : 8 - intro Page : 1

You might also like