Issue of drawings and calculation of loadings for miscellneous elements Terxaghi's Bearing Capacity 29-Aug 2nd Exam Topic 2, 3 & 4 (refer to Syllabus) 4-Sep Load Combination for Project (Bring copy of NSCP Load Combination) Wall Footing Issue of Lateral Earth Pressure Calculation Square Isolated Footing 5-Sep Rectangular Isolated Footing Rectangular Combined Footing 11-Sep Footing on Piles Trapezoidal Footing 12-Sep Checking of Project Progress Checking. Hard Copy Content: Load Combination, Load Envelope, Design Calculation 18-Sep 3rd Exam Foundation Design (Topic 6.1 - 6.6 - please refer to Syllabus) 19-Sep Final Checking of Project Content: Design Calculation, Foundation Plan reflecting the correct foundation sizes 25-Sep Settlement Analysis of Foundation Note: Retaining wall design must be included on the final issue of the project (soft copy) Retaining Walls and Protection 26-Sep Final Exam Note:Final soft copy of the project (PDF Format) must be emailed to jrddeomampo@gmail.com before Oct. 2 All Topics Grade for the project will depend on how you defense and explain your design. This will gauge what you learnt from this 2-Oct Release of Final Exam / Issue of Project Hard copy subject 3-Oct Retake exam if needed (Last chance to pass the subject) 9-Oct Submission of Grades