fey
VISIT REPORT
Report by MHorsfall Of UK Engineering Dept. Report No. 48/06
Date of visit 9/28-9.08 Report date 13-906, Page 1 ors
Printdate 27-906
John Crane Ref. Client Ref.
Client Represented by Status
BP/Sonatrach 1. Twinkoj JK Engineering Manager
In Amenas Gas Project,
Algeria 2. Miwamoto Ebara Pump Engineering
Group Manager
John Crane represented by: M.Horsfall, D.Boukara (JC Dubai), S.Misaki (JC Japan).
Distribution for action :
Distribution for information : _S.D.Hall, C.Fone, J.Fahner, A Skelhorn, D.Smith,
Subject: Seal Type 0950/48XP/-/SC5876 & 5877
Plant Item No 05-P-411A/B
LPG Pipeline Pumps (Ebara)
‘This visit was to change out the original tandem 8B1’s to tandem 48XP/8B1's. Originally the
plan was to ship the seals to Slough and carry out all the modifications, pressure test them.
{and ship them to site. Unfortunately the first pair of seals, off the ‘A’ pump, were held up in
the customs at Algiers so the decision was taken to hand carry all the parts to site and build
the seals there using the seals from the ‘B’ pump.
These were removed and examined. A quaniity of sand was found in both pump stuffing
boxes when the seals were removed, The DE seal had been run for aparoximately ten
‘minutes whilst the NDE had not run at all and as such was in good condition.
The primary DE seal faces were in good condition and showed no signs of distress. The DE
secondary Mating Ring (ref_20) had a piece missing from the edge between its bore and
running face. A few small cracks emanated from this chip and these showed signs of
‘overheating as they were higher than the surrounding area, In the writers opinion the
damage to the ring looked mechanical as the remainder of the face was in goad condition.
‘The only major problem encountered during the build was that the two M12 jacking bolt holes
through the two new inner Giand Plates (ref.25) had been drilled and tapped midway between
the M24 stud bolt holes, This meant that they did not line up with the two 14mm diameter
clearance holes in the Outer Gland Plate (ref.26) as these are offset from the midway position
by 5%. This was overcome by lapping the 44mm clearance holes out to M16.
| removed six of the twelve Springs (ref. 19) from the secondary seal to reduce the heat
generated by this seal. The seal arrangement drawings have been modified and a letter
explaining this action has been received by Ebara and site personnel
Using the test cell and pipe-work, which was hand carried to site, both seal cartridges were
successfully pressure lested with air to 1,8 barg for a five minute duration after which they
were installed on the pump.
The Plan 17 flush line had been modified to include two pressure gauges, which are fitted
between the two 4.7mm orifice plates on each end of the pump. The Plan 11 take off point o
JOHN CRANE UK LTD