You are on page 1of 2

A-45 A-45 A-45

system C310
+5.2
C335
+4.8
C0
+3.6 Processing test of using
A-60
C310
Y+
Basis
A-60
C0
VC-X500
+5.4 0 -0.9
A-30 A-30 A-30
C310 C335 C0
-4.9 -4.5 -0.3

A-60 A-45 A-30 A-10 A-25 A-50 A-30 A-45 A-60


C80 C80 C80 C60 C60 C60 C210 C210 C210
-0.4 -0.6 -2.2 -3.1 -2.1 +1.0 -2.2 +4.8 +6.1
A-60 X- A-30 A-15 Z+ A-35 A-30 X+ A-60
C55 Basis C55 C0 Basis C0 C235 Basis C235
+4.2 0 -4.8 -2.5 0 -1.0 -1.0 0 +5.7
A-60 A-45 A-30 A-10 A-25 A-50 A-30 A-45 A-60
C30 C30 C30 C30 C30 C30 C260 C260 C260
+5.7 +3.8 -4.2 -1.3 -0.5 +1.4 -0.6 +4.2 +3.9

A-30 A-30 A-30


Processing result C180 C155 C130
AC Each index angle +0.8 -2.3 -4.0
A-60 Y- A-60
Blue Error of the C180 Basis C130
-1.6 0 +5.4
theoretical value(m) A-45 A-45 A-45
C180 C155 C130
+3.3 +3.7 +5.
Dividing the surface 9 of the cube.
system Processing at different angles eight
locations with the exception of the
center.
To verify accuracy to measure the
depth of processing