2.Old 1st ODF rack and position and type of connector- 3.Distance between rack and 1st ODF- 4.Position of all 2nd ODF's and type of connector- 5.Distance between 1st ODF to all 2nd ODF's- 6.New SR-12e Rack Position- 7.New 1st ODF Rack & Position- 8.Distance between SR-12e to 1st ODF with type of connector- 9. Power DB for new rack- 10.Distance between New rack to Power DB- 11.Distance b/w new rack to Earth bar and also check how the rack grounding is t erminated-