Perancangan Struktur Bangunan Gedung Tahan Gempa Di Pulau Flores, Nusa Tenggara Timur
Perancangan Struktur Bangunan Gedung Tahan Gempa Di Pulau Flores, Nusa Tenggara Timur
Tebal Pelat 12.5 cm Tebal Pelat 12.5 cm Tebal Pelat 11 cm Tebal Pelat 11 cm
Besi Tulangan Besi Tulangan Besi Tulangan Besi Tulangan
LX, TX D10 150 LX, TX D10 150 LX, TX D10 150 LX, TX D10 150
Tulangan Pokok Tulangan Pokok Tulangan Pokok Tulangan Pokok
LY, TY D10 150 LY, TY D10 150 LY, TY D10 150 LY, TY D10 150
TX P8 200 TX P8 200 TX P8 200 TX P8 200
Tulangan Susut Tulangan Susut Tulangan Susut Tulangan Susut
TY P8 200 TY P8 200 TY P8 200 TY P8 200
P Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3 P Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3
DI PULAU FLORES,
Berat Tul Pokok 9.344 kg Berat Tul Pokok 9.344 kg Berat Tul Pokok 9.344 kg Berat Tul Pokok 9.344 kg
L Berat Tul Susut 4.485 kg Berat Tul Susut 4.485 kg A Berat Tul Susut 4.485 kg Berat Tul Susut 4.485 kg
GEDUNG TAHAN GEMPA
Total Berat Besi Tul 13.829 kg Total Berat Besi Tul 13.829 kg Total Berat Besi Tul 13.829 kg Total Berat Besi Tul 13.829 kg
Formwork Formwork Formwork Formwork
Panjang 1 m2 Panjang 1 m2 Panjang 1 m2 Panjang 1 m2
PERANCANGAN STRUKTUR BANGUNAN
A Lapangan Tul Bawah 7 D19 Lapangan Tul Bawah 5 D19 Lapangan Tul Bawah 5 D19 Lapangan Tul Bawah 8 D19
Sengkang 2 D10 250 Sengkang 2 D10 200 Sengkang 2 D10 300 Sengkang 2 D10 300
GEDUNG TAHAN GEMPA
I Tul Susut 4 D12 Tul Susut 4 D12 Tul Susut 8 D12 Tul Susut 8 D12
Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3
Berat Tul Atas 13.3542 kg Berat Tul Atas 13.3542 kg Berat Tul Atas 14.46705 kg Berat Tul Atas 13.3542 kg
Berat Tul Bawah 12.24135 kg Berat Tul Bawah 11.1285 kg Berat Tul Bawah 11.1285 kg Berat Tul Bawah 13.3542 kg
PERANCANGAN STRUKTUR BANGUNAN
1
Berat Tumpuan 5.178915 kg Berat Tumpuan 5.178915 kg Berat Tumpuan 5.09671 kg Berat Tumpuan 5.09671 kg
Begel Lapangan 2.071566 kg Begel Lapangan 2.589458 kg Begel Lapangan 2.548355 kg Begel Lapangan 2.548355 kg
Berat Tul Susut 3.551256 kg Berat Tul Susut 3.551256 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 7.102513 kg
2 Total Berat Besi Tul 36.39729 kg Total Berat Besi Tul 35.80234 kg Total Berat Besi Tul 40.34314 kg Total Berat Besi Tul 41.45599 kg
Formwork Formwork Formwork Formwork
Panjang 1.3 m2 Panjang 1.3 m Panjang 1.95 m Panjang 1.95 m
3 Output Output Output Output
Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3
IQBAL HADI
Besi Tulangan 173.32 kg Besi Tulangan 170.49 kg Besi Tulangan 94.93 kg Besi Tulangan 97.54 kg
Formwork 6.190476 m2 Formwork 6.190476 m Formwork 4.588235 m Formwork 4.588235 m
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
A Lapangan Tul Bawah 6 D19 Lapangan Tul Bawah 5 D19 Lapangan Tul Bawah 6 D19 Lapangan Tul Bawah 7 D19
Sengkang 2 D10 250 Sengkang 2 D10 200 Sengkang 2 D10 300 Sengkang 2 D10 300
GEDUNG TAHAN GEMPA
I Tul Susut 4 D12 Tul Susut 4 D12 Tul Susut 8 D12 Tul Susut 8 D12
Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3
Berat Tul Atas 12.24135 kg Berat Tul Atas 13.3542 kg Berat Tul Atas 14.46705 kg Berat Tul Atas 12.24135 kg
Berat Tul Bawah 13.3542 kg Berat Tul Bawah 12.24135 kg Berat Tul Bawah 13.3542 kg Berat Tul Bawah 12.24135 kg
PERANCANGAN STRUKTUR BANGUNAN
4
Berat Tumpuan 5.178915 kg Berat Tumpuan 5.178915 kg Berat Tumpuan 5.09671 kg Berat Tumpuan 5.09671 kg
Begel Lapangan 2.071566 kg Begel Lapangan 2.589458 kg Begel Lapangan 2.548355 kg Begel Lapangan 2.548355 kg
Berat Tul Susut 3.551256 kg Berat Tul Susut 3.551256 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 7.102513 kg
5 Total Berat Besi Tul 36.39729 kg Total Berat Besi Tul 36.91519 kg Total Berat Besi Tul 42.56884 kg Total Berat Besi Tul 39.23028 kg
Formwork Formwork Formwork Formwork
Panjang 1.3 m2 Panjang 1.3 m Panjang 1.95 m Panjang 1.95 m
6 Output Output Output Output
Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3
IQBAL HADI
Besi Tulangan 173.32 kg Besi Tulangan 175.79 kg Besi Tulangan 100.16 kg Besi Tulangan 92.31 kg
Formwork 6.190476 m2 Formwork 6.190476 m Formwork 4.588235 m Formwork 4.588235 m
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
A Lapangan Tul Bawah 4 D19 Lapangan Tul Bawah 4 D19 Lapangan Tul Bawah 11 D19 Lapangan Tul Bawah 7 D19
Sengkang 2 D10 250 Sengkang 2 D10 200 Sengkang 2 D10 300 Sengkang 2 D10 300
GEDUNG TAHAN GEMPA
I Tul Susut 4 D12 Tul Susut 4 D12 Tul Susut 8 D12 Tul Susut 8 D12
Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3
Berat Tul Atas 11.1285 kg Berat Tul Atas 10.01565 kg Berat Tul Atas 18.91845 kg Berat Tul Atas 12.24135 kg
Berat Tul Bawah 8.902802 kg Berat Tul Bawah 8.902802 kg Berat Tul Bawah 18.91845 kg Berat Tul Bawah 12.24135 kg
PERANCANGAN STRUKTUR BANGUNAN
7
Berat Tumpuan 5.178915 kg Berat Tumpuan 5.178915 kg Berat Tumpuan 5.09671 kg Berat Tumpuan 5.09671 kg
Begel Lapangan 2.071566 kg Begel Lapangan 2.589458 kg Begel Lapangan 2.548355 kg Begel Lapangan 2.548355 kg
Berat Tul Susut 3.551256 kg Berat Tul Susut 3.551256 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 7.102513 kg
8 Total Berat Besi Tul 30.83304 kg Total Berat Besi Tul 30.23808 kg Total Berat Besi Tul 52.58449 kg Total Berat Besi Tul 39.23028 kg
Formwork Formwork Formwork Formwork
Panjang 1.3 m2 Panjang 1.3 m Panjang 1.95 m Panjang 1.95 m
9 Output Output Output Output
Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3
IQBAL HADI
Besi Tulangan 146.82 kg Besi Tulangan 143.99 kg Besi Tulangan 123.73 kg Besi Tulangan 92.31 kg
Formwork 6.190476 m2 Formwork 6.190476 m Formwork 4.588235 m Formwork 4.588235 m
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
Lapangan Tul Bawah 4 D19 Lapangan Tul Bawah 4 D19 Lapangan Tul Bawah 7 D19 Lapangan Tul Bawah 16 D19
T Sengkang 2 D10 200 Sengkang 2 D10 200 Sengkang 2 D10 300 Sengkang 2 D10 300
GEDUNG TAHAN GEMPA
Tul Susut 4 D12 Tul Susut 4 D12 Tul Susut 8 D12 Tul Susut 8 D12
A Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3 Berat Volume Besi 7850 kg/m3
I Berat Tul Atas 10.01565 kg Berat Tul Atas 10.01565 kg Berat Tul Atas 12.24135 kg Berat Tul Atas 26.70841 kg
Berat Tul Bawah 8.902802 kg Berat Tul Bawah 8.902802 kg Berat Tul Bawah 12.24135 kg Berat Tul Bawah 26.70841 kg
PERANCANGAN STRUKTUR BANGUNAN
Berat Tumpuan 4.254109 kg Berat Tumpuan 4.254109 kg Berat Tumpuan 4.685685 kg Berat Tumpuan 4.685685 kg
Begel Lapangan 2.127055 kg Begel Lapangan 2.127055 kg Begel Lapangan 2.342843 kg Begel Lapangan 2.342843 kg
1 Berat Tul Susut 3.551256 kg Berat Tul Susut 3.551256 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 7.102513 kg
Total Berat Besi Tul 28.85088 kg Total Berat Besi Tul 28.85088 kg Total Berat Besi Tul 38.61375 kg Total Berat Besi Tul 67.54785 kg
0 Formwork Formwork Formwork Formwork
Panjang 1.08 m2 Panjang 1.08 m Panjang 1.83 m Panjang 1.83 m
Output Output Output Output
Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3
IQBAL HADI
Besi Tulangan 192.34 kg Besi Tulangan 192.34 kg Besi Tulangan 107.26 kg Besi Tulangan 187.63 kg
Formwork 7.2 m2 Formwork 7.2 m Formwork 5.083333 m Formwork 5.083333 m
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
Berat Tul Susut 3.551256 kg Berat Tul Susut 3.551256 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg
2 Total Berat Besi Tul 36.66549 kg Total Berat Besi Tul 36.91519 kg Total Berat Besi Tul 40.7408 kg Total Berat Besi Tul 37.68894 kg Total Berat Besi Tul 26.55691 kg Total Berat Besi Tul 23.21528 kg Total Berat Besi Tul 20.67867 kg
Formwork Formwork Formwork Formwork Formwork Formwork Formwork
GEDUNG TAHAN GEMPA
Panjang 1.3 m2 Panjang 1.3 m Panjang 1.45 m Panjang 1.45 m Panjang 0.8 m Panjang 0.8 m Panjang 0.8 m
3 Output Output Output Output Output Output Output
Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3
Besi Tulangan 174.60 kg Besi Tulangan 175.79 kg Besi Tulangan 135.80 kg Besi Tulangan 125.63 kg Besi Tulangan 265.57 kg Besi Tulangan 232.15 kg Besi Tulangan 206.79 kg
Formwork 6.190476 m2 Formwork 6.190476 m Formwork 4.833333 m Formwork 4.833333 m Formwork 8 m Formwork 8 m Formwork 8 m
PERANCANGAN STRUKTUR BANGUNAN
IQBAL HADI
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
Berat Tul Susut 3.551256 kg Berat Tul Susut 3.551256 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg
5 Total Berat Besi Tul 73.80571 kg Total Berat Besi Tul 41.89373 kg Total Berat Besi Tul 45.44498 kg Total Berat Besi Tul 51.93096 kg Total Berat Besi Tul 34.76655 kg Total Berat Besi Tul 31.12282 kg Total Berat Besi Tul 22.22001 kg
Formwork Formwork Formwork Formwork Formwork Formwork Formwork
GEDUNG TAHAN GEMPA
Panjang 1.75 m Panjang 1.45 m Panjang 1.45 m Panjang 1.45 m Panjang 1.05 m Panjang 1.05 m Panjang 1.05 m
6 Output Output Output Output Output Output Output
Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3
Besi Tulangan 230.64 kg Besi Tulangan 139.65 kg Besi Tulangan 151.48 kg Besi Tulangan 173.10 kg Besi Tulangan 231.78 kg Besi Tulangan 207.49 kg Besi Tulangan 148.13 kg
Formwork 5.46875 m Formwork 4.833333 m Formwork 4.833333 m Formwork 4.833333 m Formwork 7 m Formwork 7 m Formwork 7 m
PERANCANGAN STRUKTUR BANGUNAN
IQBAL HADI
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
Berat Tul Susut 3.551256 kg Berat Tul Susut 3.551256 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 7.102513 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg
8 Total Berat Besi Tul 49.74533 kg Total Berat Besi Tul 38.55518 kg Total Berat Besi Tul 37.11556 kg Total Berat Besi Tul 41.18471 kg Total Berat Besi Tul 31.12282 kg Total Berat Besi Tul 23.33286 kg Total Berat Besi Tul 22.22001 kg
Formwork Formwork Formwork Formwork Formwork Formwork Formwork
GEDUNG TAHAN GEMPA
Panjang 1.75 m Panjang 1.45 m Panjang 1.45 m Panjang 1.45 m Panjang 1.05 m Panjang 1.05 m Panjang 1.05 m
9 Output Output Output Output Output Output Output
Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3
Besi Tulangan 155.45 kg Besi Tulangan 128.52 kg Besi Tulangan 123.72 kg Besi Tulangan 137.28 kg Besi Tulangan 207.49 kg Besi Tulangan 155.55 kg Besi Tulangan 148.13 kg
Formwork 5.46875 m Formwork 4.833333 m Formwork 4.833333 m Formwork 4.833333 m Formwork 7 m Formwork 7 m Formwork 7 m
PERANCANGAN STRUKTUR BANGUNAN
IQBAL HADI
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
1 Berat Tul Susut 3.551256 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg Berat Tul Susut 1.775628 kg
Total Berat Besi Tul 44.98258 kg Total Berat Besi Tul 23.63805 kg Total Berat Besi Tul 23.63805 kg Total Berat Besi Tul 26.47412 kg Total Berat Besi Tul 22.22001 kg Total Berat Besi Tul 22.22001 kg Total Berat Besi Tul 22.22001 kg
0 Formwork Formwork Formwork Formwork Formwork Formwork Formwork
GEDUNG TAHAN GEMPA
Panjang 1.6 m Panjang 1.1 m Panjang 1.1 m Panjang 1.1 m Panjang 1.1 m Panjang 1.1 m Panjang 1.1 m
Output Output Output Output Output Output Output
Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3 Beton 1 m3
Besi Tulangan 160.65 kg Besi Tulangan 157.59 kg Besi Tulangan 157.59 kg Besi Tulangan 176.49 kg Besi Tulangan 148.13 kg Besi Tulangan 148.13 kg Besi Tulangan 148.13 kg
Formwork 5.714286 m Formwork 7.333333 m Formwork 7.333333 m Formwork 7.333333 m Formwork 7.333333 m Formwork 7.333333 m Formwork 7.333333 m
PERANCANGAN STRUKTUR BANGUNAN
IQBAL HADI
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
I Begel Luar Sendi Plastis 31.050 kg 1 Begel Luar Sendi Plastis 31.050 kg 4 Begel Luar Sendi Plastis 31.050 kg 7 Begel Luar Sendi Plastis 31.050 kg
Total Berat Besi Tulangan 154.581 kg Total Berat Besi Tulangan 154.581 kg Total Berat Besi Tulangan 139.167 kg Total Berat Besi Tulangan 123.754 kg
GEDUNG TAHAN GEMPA
Beton 1 m3 Beton 1 m3
Besi Tulangan 199.049 kg Besi Tulangan 36.211 kg
Formwork 2.513 m2 Formwork 4.6 m2
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
Total Jumlah Bored Pile 164 jlh Jumlah pile cap = kolom 41
13 mm bar 1 m = 1.04 kg/m'
13 511 178
13 511 177
13 511 171
PERANCANGAN STRUKTUR BANGUNAN DIKERJAKAN OLEH KELOMPOK 5 :
GEDUNG TAHAN GEMPA SYAMSUL ARIF NUGRAHA 13 511 171
DI PULAU FLORES, IQBAL HADI 13 511 177
NUSA TENGGARA TIMUR. FILDZAH ADHANIA J. PARANSA 13 511 178
Harga Satuan Harga Total Jumlah Harga Harga Satuan Harga Total Jumlah Harga
No Elemen Satuan Volume No Elemen Satuan Volume
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
2 PEKERJAAN BALOK LT. 1, 2, 3 2 PEKERJAAN BALOK LT. 4, 5, 6
BI 1 Rp 8,960,647.84 BI 1 Rp 8,960,647.84
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.1 2.8
Besi kg 232.570 Rp 21,965.75 Rp 5,108,564.09 Besi kg 232.570 Rp 21,965.75 Rp 5,108,564.09
Bekisting m2 5.5 Rp 536,742.50 Rp 2,952,083.75 Bekisting m2 5.5 Rp 536,742.50 Rp 2,952,083.75
BI 2 Rp 7,697,295.61 BI 2 Rp 7,697,295.61
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.2 2.9
Besi kg 190.531 Rp 21,965.75 Rp 4,185,148.77 Besi kg 190.531 Rp 21,965.75 Rp 4,185,148.77
Bekisting m2 4.867 Rp 536,742.50 Rp 2,612,146.83 Bekisting m2 4.867 Rp 536,742.50 Rp 2,612,146.83
BI 3 Rp 8,261,575.18 BI 3 Rp 7,697,295.61
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.3 2.10
Besi kg 216.220 Rp 21,965.75 Rp 4,749,428.35 Besi kg 190.531 Rp 21,965.75 Rp 4,185,148.77
Bekisting m2 4.867 Rp 536,742.50 Rp 2,612,146.83 Bekisting m2 4.867 Rp 536,742.50 Rp 2,612,146.83
BI 4 Rp 9,256,964.36 BI 4 Rp 8,410,544.99
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.4 2.11
Besi kg 261.535 Rp 21,965.75 Rp 5,744,817.53 Besi kg 223.002 Rp 21,965.75 Rp 4,898,398.16
Bekisting m2 4.867 Rp 536,742.50 Rp 2,612,146.83 Bekisting m2 4.867 Rp 536,742.50 Rp 2,612,146.83
BA 1 Rp 13,089,911.88 BA 1 Rp 12,451,147.39
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.5 2.12
Besi kg 382.274 Rp 21,965.75 Rp 8,396,931.54 Besi kg 353.194 Rp 21,965.75 Rp 7,758,167.06
Bekisting m2 7.067 Rp 536,742.50 Rp 3,792,980.33 Bekisting m2 7.067 Rp 536,742.50 Rp 3,792,980.33
BA 2 Rp 12,807,772.09 BA 2 Rp 11,679,212.93
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.6 2.13
Besi kg 369.429 Rp 21,965.75 Rp 8,114,791.75 Besi kg 318.051 Rp 21,965.75 Rp 6,986,232.60
Bekisting m2 7.067 Rp 536,742.50 Rp 3,792,980.33 Bekisting m2 7.067 Rp 536,742.50 Rp 3,792,980.33
BA 3 Rp 9,422,094.62 BA 3 Rp 9,422,094.62
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.7 2.14
Besi kg 215.295 Rp 21,965.75 Rp 4,729,114.29 Besi kg 215.295 Rp 21,965.75 Rp 4,729,114.29
Bekisting m2 7.067 Rp 536,742.50 Rp 3,792,980.33 Bekisting m2 7.067 Rp 536,742.50 Rp 3,792,980.33
JUMLAH HARGA 1 M3 PEKERJAAN BALOK LT. 1,2,3 Rp 69,496,261.58 JUMLAH HARGA 1 M3 PEKERJAAN BALOK LT. 4,5,6 Rp 66,318,238.99
TOTAL HARGA 1 M3 PEKERJAAN BALOK
Harga Satuan Harga Total Jumlah Harga Harga Satuan Harga Total Jumlah Harga
No Elemen Satuan Volume No Elemen Satuan Volume
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
2 PEKERJAAN BALOK LT. 7, 8, 9 2 PEKERJAAN BALOK LT. 10
BI 1 Rp 7,309,072.05 BI 1 Rp 7,544,310.08
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.15 2.22
Besi kg 157.381 Rp 21,965.75 Rp 3,456,988.30 Besi kg 162.854 Rp 21,965.75 Rp 3,577,210.08
Bekisting m2 5.5 Rp 536,742.50 Rp 2,952,083.75 Bekisting m2 5.714286 Rp 536,742.50 Rp 3,067,100.00
BI 2 Rp 7,274,085.92 BI 2 Rp 9,772,880.84
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.16 2.23
Besi kg 171.264 Rp 21,965.75 Rp 3,761,939.09 Besi kg 224.748 Rp 21,965.75 Rp 4,936,769.17
Bekisting m2 4.866667 Rp 536,742.50 Rp 2,612,146.83 Bekisting m2 7.333333 Rp 536,742.50 Rp 3,936,111.67
BI 3 Rp 6,968,246.39 BI 3 Rp 9,772,880.84
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.17 2.24
Besi kg 157.340 Rp 21,965.75 Rp 3,456,099.56 Besi kg 224.748 Rp 21,965.75 Rp 4,936,769.17
Bekisting m2 4.866667 Rp 536,742.50 Rp 2,612,146.83 Bekisting m2 7.333333 Rp 536,742.50 Rp 3,936,111.67
BI 4 Rp 7,266,186.01 BI 4 Rp 10,188,190.61
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.18 2.25
Besi kg 170.904 Rp 21,965.75 Rp 3,754,039.18 Besi kg 243.656 Rp 21,965.75 Rp 5,352,078.94
Bekisting m2 4.866667 Rp 536,742.50 Rp 2,612,146.83 Bekisting m2 7.333333 Rp 536,742.50 Rp 3,936,111.67
BA 1 Rp 11,679,212.93 BA 1 Rp 9,565,225.95
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.19 2.26
Besi kg 318.051 Rp 21,965.75 Rp 6,986,232.60 Besi kg 215.295 Rp 21,965.75 Rp 4,729,114.29
Bekisting m2 7.066667 Rp 536,742.50 Rp 3,792,980.33 Bekisting m2 7.333333 Rp 536,742.50 Rp 3,936,111.67
BA 2 Rp 9,704,234.41 BA 2 Rp 9,565,225.95
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.20 2.27
Besi kg 228.139 Rp 21,965.75 Rp 5,011,254.08 Besi kg 215.295 Rp 21,965.75 Rp 4,729,114.29
Bekisting m2 7.066667 Rp 536,742.50 Rp 3,792,980.33 Bekisting m2 7.333333 Rp 536,742.50 Rp 3,936,111.67
BA 3 Rp 9,422,094.62 BA 3 Rp 9,565,225.95
Beton m3 1 Rp 900,000.00 Rp 900,000.00 Beton m3 1 Rp 900,000.00 Rp 900,000.00
2.21 2.28
Besi kg 215.295 Rp 21,965.75 Rp 4,729,114.29 Besi kg 215.295 Rp 21,965.75 Rp 4,729,114.29
Bekisting m2 7.066667 Rp 536,742.50 Rp 3,792,980.33 Bekisting m2 7.333333 Rp 536,742.50 Rp 3,936,111.67
JUMLAH HARGA 1 M3 PEKERJAAN BALOK LT. 7,8,9 Rp 50,201,037.72 JUMLAH HARGA 1 M3 PEKERJAAN BALOK LT. 10 Rp 56,408,714.27
Rp 242,424,252.55
PERANCANGAN STRUKTUR BANGUNAN DIKERJAKAN OLEH KELOMPOK 5 :
GEDUNG TAHAN GEMPA SYAMSUL ARIF NUGRAHA 13 511 171
DI PULAU FLORES, IQBAL HADI 13 511 177
NUSA TENGGARA TIMUR. FILDZAH ADHANIA J. PARANSA 13 511 178
Lx Ly H Volume
No. Elemen n
(m) (m) (m) (m3)
1 PEKERJAAN PELAT
1.1 PL 1 4.4 6.2 0.12 234 766.022
1.2 PL 2 4.4 5.4 0.12 90 256.608
1.3 PL 3 3 4.4 0.12 126 199.584
1.4 PA 1 4.4 6.2 0.1 28 76.384
1.5 PA 2 4.4 5.4 0.1 12 28.512
1.6 PA 3 3 4.4 0.1 14 18.480
JUMLAH VOLUME PEKERJAAN PELAT (10 LT.) 1345.590
B H L Volume B H L Volume B H L Volume B H L Volume
No Elemen n No Elemen n No Elemen n No Elemen n
(m) (m) (m) (m3) (m) (m) (m) (m3) (m) (m) (m) (m3) (m) (m) (m) (m3)
2 PEKERJAAN BALOK LT. 1, 2, 3 2 PEKERJAAN BALOK LT. 4, 5, 6 2 PEKERJAAN BALOK LT. 7, 8, 9 2 PEKERJAAN BALOK LT. 10
2.1 BI 1 0.4 0.8 8.8 102 287.232 2.8 BI 1 0.4 0.8 8.8 102 287.232 2.15 BI 1 0.4 0.8 8.8 102 287.232 2.22 BI 1 0.4 0.7 8.8 102 251.328
2.2 BI 2 0.5 0.6 6.2 48 89.28 2.9 BI 2 0.5 0.6 6.2 48 89.28 2.16 BI 2 0.5 0.6 6.2 48 89.28 2.23 BI 2 0.3 0.5 6.2 48 44.64
2.3 BI 3 0.5 0.6 5.4 27 43.74 2.10 BI 3 0.5 0.6 5.4 27 43.74 2.17 BI 3 0.5 0.6 5.4 27 43.74 2.24 BI 3 0.3 0.5 5.4 27 21.87
2.4 BI 4 0.5 0.6 3 24 21.6 2.11 BI 4 0.5 0.6 3 24 21.6 2.18 BI 4 0.5 0.6 3 24 21.6 2.25 BI 4 0.3 0.5 3 24 10.8
2.5 BA 1 0.3 0.5 6.2 42 39.06 2.12 BA 1 0.3 0.5 6.2 42 39.06 2.19 BA 1 0.3 0.5 6.2 42 39.06 2.26 BA 1 0.3 0.5 6.2 42 39.06
2.6 BA 2 0.3 0.5 5.4 18 14.58 2.13 BA 2 0.3 0.5 5.4 18 14.58 2.20 BA 2 0.3 0.5 5.4 18 14.58 2.27 BA 2 0.3 0.5 5.4 18 14.58
2.7 BA 3 0.3 0.5 3 21 9.45 2.14 BA 3 0.3 0.5 3 21 9.45 2.21 BA 3 0.3 0.5 3 21 9.45 2.28 BA 3 0.3 0.5 3 21 9.45
JUMLAH VOLUME PEKERJAAN BALOK LT. 1,2,3 504.942 JUMLAH HARGA 1 M3 PEKERJAAN BALOK LT. 4,5,6 504.942 JUMLAH HARGA 1 M3 PEKERJAAN BALOK LT. 7, 8, 9 504.942 JUMLAH HARGA 1 M3 PEKERJAAN BALOK LT. 10 391.728
TOTAL VOLUME PEKERJAAN BALOK 1906.554
DI PULAU FLORES,
GEDUNG TAHAN GEMPA
IQBAL HADI
SYAMSUL ARIF NUGRAHA
DIKERJAKAN OLEH KELOMPOK 5 :
B H L Volume
No Elemen n
(m) (m) (m) (m3)
3 PEKERJAAN KOLOM
KOLOM
3.1 0.8 0.8 4 41 104.96
LT. 0
KOLOM
3.2 0.8 0.8 4 41 314.88
LT. 1, 2, 3
KOLOM
3.3 0.8 0.8 4 41 314.88
LT. 4, 5, 6
KOLOM
3.4 0.8 0.8 4 41 314.88
LT. 7, 8, 9
JUMLAH VOLUME PEKERJAAN KOLOM 1049.6
B H L Volume
No Elemen n
(m) (m) (m) (m3)
4 PEKERJAAN PONDASI
4.1 PILE CAP 3 3 0.8 41 295.2
BORED
4.2 0.005 22 164 18.136
PILE
JUMLAH VOLUME PEKERJAAN KOLOM 313.336
PERANCANGAN STRUKTUR BANGUNAN DIKERJAKAN OLEH KELOMPOK 5 :
GEDUNG TAHAN GEMPA SYAMSUL ARIF NUGRAHA 13 511 171
DI PULAU FLORES, IQBAL HADI 13 511 177
NUSA TENGGARA TIMUR. FILDZAH ADHANIA J. PARANSA 13 511 178
PEKERJAAN JENIS PEKERJAAN Volume Satuan HARGA SATUAN HARGA PEKERJAAN JUMLAH HARGA
a b c d e f =cx e g
PEKERJAAN PELAT Rp 1,906,958,213
PL 1 766.022 m3 Rp 1,696,710 Rp 1,299,717,852
PL 2 256.608 m3 Rp 1,696,710 Rp 435,389,355
A
PA 1 76.384 m3 Rp 1,638,299 Rp 125,139,826
PA 2 28.512 m3 Rp 1,638,299 Rp 46,711,179