You are on page 1of 1

TNG BAO NGOI XEM BN V KIN TRC.

- TON B KCH THC PHI KIM TRA TI CNG TRNH TRC KHI THI CNG LP T NI THT.

- NH THU LP T CA I PHI KIM TRA CONG CA TNG BAO C M BO LP C CA


TRC KHI TIN HNH SN XUT V LP T.

- MI S THAY I PHI C THNG QUA BI NH T VN THIT K CHNH.

Exterior wall Refer to Architecture Drawings

THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCEMENT OF
ANY ID WORKS.

The contractor must check and verify the curved wall to ensure the door can be placed to wall before production and
installation

Any changes must be checked and approved by the design consultant.

You might also like