You are on page 1of 26
CHAPTER - 8 CONCRETE PAVEMENT 8-1 Portland Cement 8-2 Concrete Payement Characteristics and Behavior 8-3 Control of Cracks 8-4 Transverse Expansion Joints 8-5 Longitudinal Joints 8-6 Construction Joint 8-7 Reinforcement of Joints 8-8. The Sub-Grade and Sub-Base for Concrete Pavement 8-9 Concrete Proportions 8-10 Concrete Mixture 8-11 Polymer Concrete 8-12 Curing of Concrete Pavement 8-13. DPWH Specifications on Concrete Pavement 8-14 Equipment 8-15 Preparation of Grade 8- 8-17 Placing or Depositing of Concrete 8-18 Final Consolidation ay Finishing 8-19 Curing 8-20 Removal of Forms 8-21 Concreting by the Slip Form Method 8-22 Tolerance and Pavement Thickness 1 1 16 Handling Measuring and Batching of Materials 278 1 253 254 eae 257 259 260 261 262 263 265 267 267 268 274 | 276 280 285 291 293 293 296