You are on page 1of 3
Jumeirah iinet fF | ots Pecnso Pate: 23-May-2018, Page Tof1® FIRE ALARM & VOICE EVACUATION SYSTEM Checked By Revision Details Date Revision EP CONTRACTOR B+G+2+R at Jumeirah simian IY Srert ss ee METHOD STATEMENT FOR fo? MSIE A INSTALLATION, TESTING & ev. No: 0 COMMISSIONING OF FIRE ALARM Pate: 25:uey-2016 & VOICE EVACUATION SYSTEM | Page 2/18 CONTENTS 3.0 REFERENCES Page - 3 of 19 Page ~ 3 of 19 Page - 4 of 19 (MEP CONTRACTOR MAIN CONTRACTOR aw Project Title : B+G+2+R at Jumeirah dvahic age iat yo | METHOD STATEMENT FOR Ret No. M516 1. PURPOSE: The purpose of this Method Statement is to identify the ‘commissioning of Fire Alarm and voice evacuation system as per the contract specification, drawings and as per Civil Defense regulations. 2. SCOPE: ‘This method statement is applicable to all activities related to instafation, testing and commissioning cof Fire Alarm and voice evacuation system. This document will ensure thet the work is carried out ‘and complies with the project specifications and requirements. This method statement is applicable to all the infrastructure in the Project, $, REFERENCES: 3.1 Electrical Specification 3.2 Approved Drawing far Gonstruction 3.3 Approved material submittals, 3.4 DCD — Conforming on iatest regulation 3.5 British Standards / Codes 4, DEFINITIONS: 44 CLIENT 42 CONSULTANT 43 CONTRACTOR 44 MEP SUBCONTRACTOR 45 SPECIALIST 4.6 — DWC-Dubai World Central 4.7 BS- British Standard 48 SITE: Project 49 MS-Methad Statement 410 _iTP-inspection Test Pian MEP CONTRACTOR MAIN CONTRACTOR a ~ INSTALLATION, TESTING & — fewtto 8 COMNISSIONING OF FIRE ALARM Bb ay- 2018 & VOICE EVACUATION SYSTEM [Figs 3a18 ale

You might also like