Professional Documents
Culture Documents
Jan-12
1.- PRODUCCION (Kwh) POTENCIA MAX. DEMANDA (Kw)
TOTAL : -
TOTAL: 5,197,704.92
2.2.- EMSEU
SISTEMA CACLIC
Jan-12
2.-EROGACION
2.1.- P.S.E. CHACHAPOYAS.
adinelsa
ELECTRO ORIENTE S.A.
adinelsa
ELECTRO ORIENTE S.A.
VALORIZACION DE ENERGIA Y POTENCIA
CLIENTE : ELECTRONORTE S.A.- CENTRO DE SERVICIOS CHACHAPOYAS
MES : ENERO 2012
Formato G2
VALORIZACION
ENERGIA
ENERGIA
ENERGIA ENERGIA REACTIVA
POTENCIA ENERGIA REACTIVA TOTAL
H.P. H.F.P CAPACITIV
S/. S/. INDUCTIVA S/.
S/. S/. A
S/.
S/.
76,144.01 112,305.51 448,443.05 560,748.57 752.34 23.25 660,359.52
76,144.01 112,305.51 448,443.05 560,748.57 752.34 23.25 660,359.52
-
-
76,144.01 448,443.05 560,748.57 752.34 23.25 660,359.52
VALORIZACION
ENERGIA
ENERGIA
ENERGIA ENERGIA REACTIVA
POTENCIA ENERGIA REACTIVA TOTAL
H.P. H.F.P CAPACITIV
S/. S/. INDUCTIVA S/.
S/. S/. A
S/.
S/.
34,741.20 24,027.42 72,004.91 96,032.33 532.94 152,053.27
34,741.20 24,027.42 72,004.91 96,032.33 532.94 - 152,053.27
340.60 340.60
-
35,081.80 96,032.33 532.94 - 152,393.87
VALORIZACION
ENERGIA ENERGIA
ENERGIA
ENERGIA REACTIVA REACTIVA TOTAL
H.F.P
S/. INDUCTIVA CAPACITIVA S/.
S/.
S/. S/.
-
329,073.84 - 131.42 420,326.21
1,233,079.59
adinelsa
ELECTRO ORIENTE DPTO. GENERACION AMAZONAS - CAJAMARCA
DATOS DE GENERACION
FORMATO DE INFORMACION MENSUAL
CENTRAL HIDROELECTRICA POTENCIA PRODUCCION BRUTA CONSUMO PRODUCCION MAXIMA Horas de HORAS Horas de
INSTALADA EFECTIVA H.P. H.F.P. TOTAL PROPIO NETA DEMANDA Mantto DE Salidas
NOMBRE GRUPO ESTADO (Mw) (Mw) (Mwh) (Mwh) (Mwh) (Mwh) (Mwh) (Mw) Programado OPERACION Forzadas
C.H. MUYO G-1 OP 2.837 2.600 287.020 1471.219 1,758.239 2.698 743.72
G-2 OP 2.837 2.600 278.111 1444.899 1,723.010 2.606 743.18
TOT. C.H. MUYO 2 5.674 5.200 565.131 2,916.118 3,481.249 9.247 3,472.002 5.278 5.50 744.00
C.H. LA PELOTA G-1 OP 1.590 1.450 131.729 661.449 793.178 1.520 3.00 707.59
G-2 OP 1.590 1.450 128.373 684.869 813.242 1.449 5.00 721.44
TOT. C.H. LA PEL. 2 3.180 2.800 260.102 1,346.318 1,606.420 7.020 1,599.400 2.809 8.00 725.10
C.H. LONYA GDE G-1 OP 0.190 0.180 14.408 25.698 40.106 0.180 5.00 350.65
G-2 OP 0.190 0.180 14.151 26.579 40.730 0.175 4.00 349.72
TOT. C.H. LONYA GDE 0.380 0.360 28.559 52.277 80.836 0.500 80.336 0.339 9.00 360.00
C.H. QUANDA G-1 OP 1.438 1.400 171.442 321.268 492.710 1.350 12.00 432.44
G-2 OP 1.438 1.400 388.680 365.881 754.561 1.380 8.00 730.75
TOT. C.H. QUANDA 2.876 2.800 560.122 687.149 1,247.271 2.863 1,244.408 2.509 20.00 731.94
TOTAL: SISTEMA M-LP. 12.110 11.160 1413.914 5001.862 6415.776 19.630 6396.146 10.855 42.50 744.00
adinelsa
ELECTRO ORIENTE S.A DPTO. GENERACION AMAZONAS - CAJAMARCA
DATOS DE GENERACION
FORMATO DE INFORMACION MENSUAL
CENTRAL HIDROELECTRICA POTENCIA PRODUCCION BRUTA CONSUMO PRODUCCION MAXIMA Horas de HORAS Horas de
ESTADO INSTALADA EFECTIVA H.P. H.F.P. TOTAL PROPIO NETA DEMANDA Mantto DE Salidas
NOMBRE GRUPO (Mw) (Mw) (Mwh) (Mwh) (Mwh) (Mwh) (Mwh) (Mw) Programado OPERACION Forzadas
C.H. CACLIC G-1 OP 1.253 1.200 114.072 404.682 518.754 1.191 19.50 722.40 0.83
G-2 OP 1.253 1.200 128.004 294.470 422.474 1.136 6.00 598.23 0.83
G-3 OP 1.253 1.200 65.561 222.897 288.458 1.137 158.50 405.04
G-4 OP 1.253 1.200 117.330 437.453 554.783 1.120 713.29 0.83
TOTAL C.H. CACLIC 4 5.012 4.800 424.967 1359.502 1,784.469 8.502 1,775.967 4.197 184.00 743.17 0.33
C.T. CHACHAPOYAS Cat 1 OP 0.500 0.400 5.312 0.000 5.312 0.347 23.18 0.67
Cat 2 OP 0.500 0.400 2.994 0.000 2.994 0.350 14.69 0.67
Cat 1_Alq OP 1.200 0.800 43.772 0.000 43.772 0.852 65.59 0.67
Cat 2_Alq OP 1.200 0.800 55.055 0.000 55.055 0.811 79.80 0.67
TOT. C.T. CHACHAPOYAS 3.400 2.400 107.133 0.000 107.133 2.678 104.455 1.955 - 80.50 0.83
TOTAL: SISTEMA Chachapoyas 8.412 7.200 532.100 1359.502 1891.602 11.180 1880.422 5.084 184.00 743.17 0.83
adinelsa
ELECTRO ORIENTE S.A. DPTO. GENERACION A-C.
CONCEPTO Mwh
1.- ENERGIA PRODUCIDA 6,415.776
1.1.- HIDROELECTRICA 6,415.776
1.2.- TERMOELECTRICA
a) Diesel
b) Vapor
c) Gas
d) Ciclo Combinado
e) Otros
2.- COMPRA DE ENERGIA
2.1.- DE EMPRESAS GENERADORAS
2.1.1.- COES-SICN
2.1.2.- COES-SUR
2.2.- DE OTROS
3.- CONSUMO PROPIO DEL SISTEMA 19.630
4.- PERDIDAS SISTEMA DE TRANSMISION 4.48% 287.182
4.1.- En muy Alta Tensin
4.2.- En Alta Tensin
4.3.- En Media Tensin
5.- ENERGIA TOTAL DISPONIBLE: (1+2-3-4)=(6) 6,108.964
6.- VENTA DE ENERGIA
6.1.- A EMPRESAS GENERADORAS
6.1.1.- COES-SICN
6.1.2.- COES-SUR
6.1.3.- Otras
6.2.- A EMPRESAS DISTRIBUIDORAS 6,108.964
6.2.2.- Mercado Libre
6.2.3.- Mercado Regulado 6,108.964
6.3.- A CLIENTES LIBRES
6.3.1.- En muy Alta Tensin
6.3.2.- En Alta Tensin
6.3.3.- En Media Tensin
adinelsa
ELECTRONORTE DPTO. GENERACION A-C.
CONCEPTO Mwh
1.- ENERGIA PRODUCIDA 1,891.602
1.1.- HIDROELECTRICA 1,784.469
1.2.- TERMOELECTRICA 107.133
a) Diesel
b) Vapor
c) Gas
d) Ciclo Combinado
e) Otros
2.- COMPRA DE ENERGIA
2.1.- DE EMPRESAS GENERADORAS
2.1.1.- COES-SICN
2.1.2.- COES-SUR
2.2.- DE OTROS
3.- CONSUMO PROPIO DEL SISTEMA 11.180
4.- PERDIDAS SISTEMA DE TRANSMISION
4.1.- En muy Alta Tensin
4.2.- En Alta Tensin
4.3.- En Media Tensin
5.- ENERGIA TOTAL DISPONIBLE: (1+2-3-4)=(6) 1,880.422
6.- VENTA DE ENERGIA
6.1.- A EMPRESAS GENERADORAS
6.1.1.- COES-SICN
6.1.2.- COES-SUR
6.1.3.- Otras
6.2.- A EMPRESAS DISTRIBUIDORAS 1,880.422
6.2.2.- Mercado Libre
6.2.3.- Mercado Regulado 1,880.422
6.3.- A CLIENTES LIBRES
6.3.1.- En muy Alta Tensin
6.3.2.- En Alta Tensin
6.3.3.- En Media Tensin