You are on page 1of 16

RESUMEN DE PRODUCCION Y EROGACION DE ENERGIA Y POTENCIA

Jan-12
1.- PRODUCCION (Kwh) POTENCIA MAX. DEMANDA (Kw)

1.1.- C.H. MUYO

1.1.1.- ENERGIA HORAS PUNTA


G-1 = 287,020.00 G-1 = 2698 kw (01/09/12)
G-2 = 278,111.00 G-2 = 2606 kw (01/11/12)
TOTAL : 565,131.00 TOTAL : 5278 kw (01/11/12)

1.1.2.- ENERGIA HORAS FUERA DE PUNTA


G-1 = 1,471,219.00
G-2 = 1,444,899.00
TOTAL : 2,916,118.00

TOTAL C.H. MUYO : 3,481,249.00

1.2.- C.H. LA PELOTA

1.2.1.- ENERGIA HORAS PUNTA


G-1 = 131,729.00 G-1 = 1520 kw (01/24/12)
G-2 = 128,373.00 G-2 = 1449 kw (01/21/12)
TOTAL : 260,102.00 TOTAL : 2809 kw (01/03/12)

1.2.2.- ENERGIA HORAS FUERA DE PUNTA


G-1 = 661,449.00
G-2 = 684,869.00
TOTAL : 1,346,318.00

TOTAL C.H. LA PELOTA 1,606,420.00

1.3.- C.H. LONYA GRANDE.

1.3.1.- ENERGIA HORAS PUNTA


G-1 = 14,408.00 G-1 = 180 kw (01/15/12)
G-2 = 14,151.00 G-2 = 175 kw (01/01/12)
TOTAL : 28,559.00 TOTAL : 339 kw (01/02/12)

1.3.2.- ENERGIA HORAS FUERA DE PUNTA


G-1 = 25,698.00
G-2 = 26,579.00
TOTAL : 52,277.00

TOTAL C.H. LONYA GDE 80,836.00

1.4.- C.H. QUANDA

1.4.1.- ENERGIA HORAS PUNTA


G-1 = 171,442.00 G-1 = 1,350 kw (01/02/12)
G-2 = 388,680.00 G-2 = 1,380 kw (01/06/12)
TOTAL : 560,122.00 TOTAL : 2,509 kw (01/27/12)

1.4.2.- ENERGIA HORAS FUERA DE PUNTA


G-1 = 321,268.00
G-2 = 365,881.00
TOTAL : 687,149.00

TOTAL C.H. QUANDA : 1,247,271.00


TOTAL CC.HH.: 6,415,776.00 TOTAL : 10,855 kw (01/03/12)

ENERGIA TOTAL SISTEMA


MUYO- LA PELOTA 6,415,776.00 PMD SISTEMA: 10,855 kw (01/03/12)

RESUMEN DE PRODUCCION Y EROGACION DE ENERGIA Y POTENCIA


Jan-12

1.- PRODUCCION (Kwh) POTENCIA MAX. DEMANDA (Kw)

1.1.- C.H. CACLIC.

1.1.1.- ENERGIA HORAS PUNTA


G-1 = 114,072.00 G-1 = 1191 kw (01/05/12)
G-2 = 128,004.00 G-2 = 1136 kw (01/05/12)
G-3 = 65,561.00 G-3 = 1137 kw (01/05/12)
G-4 = 117,330.00 G-4 = 1120 kw (01/05/12)
TOTAL : 424,967.00 TOTAL : 4197 kw (01/02/12)

1.1.2.- ENERGIA HORAS FUERA DE PUNTA


G-1 = 404,682.00
G-2 = 294,470.00
G-3 = 222,897.00
G-4 = 437,453.00
TOTAL : 1,359,502.00

TOTAL C.H. CACLIC : 1,784,469.00 TOTAL : 4197 kw (01/02/12)

1.2.- C.T. CHACHAPOYAS

1.2.1.- ENERGIA HORAS PUNTA


Cat 1 = 5,312.00 G-1 = 347 kw (01/17/12)
Cat 2 = 2,994.00 G-2 = 350 kw (01/18/12)
Cat 1_Alq = 43,772.00 Cat 1 = 852 kw (01/21/12)
Cat 2_Alq = 55,055.00 Cat 2 = 811 kw (01/06/12)

TOTAL : 107,133.00 TOTAL : 1955 kw (01/18/12)

1.2.2.- ENERGIA HORAS FUERA DE PUNTA


Cat 1 = -
Cat 2 = -
Cat 1_Alq = -
Cat 2_Alq = -

TOTAL : -

TOTAL C.T. CHACHAPOYAS : 107,133.00


ENERGIA TOTAL SISTEMA
CACLIC 1,891,602.00 PMD SISTEMA: 5,084 kw (12/16/11)
RESUMEN DE EROGACION DE ENERGIA Y POTENCIA
SISTEMA MUYO - LA PELOTA
Jan-12

2.- EROGACION (Kwh) POT. MAX. DEMANDA (Kw)


2.1.- ELECTRONORTE S.A
2.1.1.- ENERGIA HORAS PUNTA = 1,002,727.81 4338.69 Kw(01/24/12)
2.1.2.- ENERGIA HORAS FUERA DE PUNTA = 4,194,977.11

TOTAL: 5,197,704.92
2.2.- EMSEU

2.2.1.- ENERGIA HORAS PUNTA = 220,233.00 2,040.00 Kw(01/05/12)


2.2.2.- ENERGIA HORAS FUERA DE PUNTA = 691,026.00
TOTAL: 911,259.00

ENERGIA TOTAL DEL SIST.: 6,108,963.92


M.D. DEL SISTEMA 10,513.12 (01/01/12)
M.D. ELECTRONORTE S.A. 4,338.69 (01/24/12)
M.D. DEL EMSEU 2,040.00 (01/05/12)
M.D. DEL SISTEMA EROGADO 6,378.69
RESUMEN DE EROGACION DE ENERGIA Y POTENCIA

SISTEMA CACLIC

Jan-12

2.-EROGACION
2.1.- P.S.E. CHACHAPOYAS.

2.1.1.- ENERGIA HORAS PUNTA = 347,191.67 3283.86 Kw(01/16/12)


2.1.2.- ENERGIA HORAS FUERA DE PUNTA = 969,911.75
TOTAL: 1,317,103.42

2.2.- P.S.E. LUYA - LAMUD.

2.2.1.- ENERGIA HORAS PUNTA = 122,211.00 1,237.04 Kw(01/16/12)


2.2.2.- ENERGIA HORAS FUERA DE PUNTA = 275,769.59
TOTAL: 397,980.59

2.3.- C.P.M. CACLIC

2.3.1.- ENERGIA HORAS PUNTA = 305.20 4.00 Kw(01/16/12)


2.3.2.- ENERGIA HORAS FUERA DE PUNTA = 261.00
TOTAL: 566.20

2.4.- FUNDO LA PITAYA

2.4.1.- ENERGIA HORAS PUNTA = 9.00 0.50 Kw(01/16/12)


2.4.2.- ENERGIA HORAS FUERA DE PUNTA = 8.00
TOTAL: 17.00

2.5.- PSE LEYMEBAMBA

2.4.1.- ENERGIA HORAS PUNTA = 51,929.92 525.65 Kw(01/16/12)


2.4.2.- ENERGIA HORAS FUERA DE PUNTA = 112,824.82
TOTAL: 164,754.74

ENERGIA TOTAL DEL SIST.: 1,880,421.95 5051.05 Kw(01/16/12)


adinelsa
ELECTRO ORIENTE S.A.

VALORIZACION DE ENERGIA Y POTENCIA

MES : ENERO 2012

Formato de Informacin Mensual. EL MUYO

BARRA DE ENTREGA PRECIO DE BARRA ENERGIA ACTIVA KWH P. M. D


ENERGIA ENERGIA
PCSPT PPB
PEB PEB
PEERI - I ENERGIA HORA REACTIVA REACTIVA
ctm Sol- ctm Sol- PEERI - C ACTIVA KVAR KVAR PCSPT
NOMBRE TENSION S/./kW- S/.Kw- cS/. H. P H. F. P PUNTA
Kwh Kwh cS/. KVARh VENDIDA INDUCTIVA CAPACITIVA S/.
mes mes KVARh Kw
HP HFP
TOTAL
ELECTRO NORTE S.A 10 Kv 5.230 17.550 11.200 10.690 1.130 2.261 1,002,727.81 4,194,977.11 5,197,704.92 4,338.69 66,578.55 1,028.49 22,691.35
TOTAL 1,002,727.81 4,194,977.11 5,197,704.92 4,338.69 66,578.55 1,028.49 22,691.35
POTENCIA CONTRATADA 8,900.00
POTENCIA FIJA (LEIDA)
POTENCIA VARIABLE
TOTAL GENERAL

adinelsa
ELECTRO ORIENTE S.A.

VALORIZACION DE ENERGIA Y POTENCIA


CLIENTE : EMSEU - EMPRESA MUNICIPAL DE SERVICIO ELECTRICO DE UTCUBAMBA
MES : ENERO 2012

Formato de Informacin Mensual.

BARRA DE ENTREGA PRECIO DE BARRA ENERGIA ACTIVA KWH P. M. D


ENERGIA ENERGIA
PCSPT PPB
PEB PEB
PEERI - I ENERGIA HORA REACTIVA REACTIVA
ctm Sol- ctm Sol- PEERI - C ACTIVA KVAR KVAR PCSPT
NOMBRE TENSION S/./kW- S/.Kw- cS/. H. P H. F. P PUNTA
Kwh Kwh cS/. KVARh VENDIDA INDUCTIVA CAPACITIVA S/.
mes mes KVARh Kw
HP HFP
TOTAL
EMSEU 10 Kv 10.17 17.030 10.910 10.420 1.130 2.261 220,233.00 691,026.00 911,259.00 2,040.00 47,162.70 20,746.80
TOTAL 220,233.00 691,026.00 911,259.00 2,040.00 47,162.70 - 20,746.80
POTENCIA CONTRATADA 2,000.00
EXCESO DE POTENCIA 40.00

TOTAL GENERAL 20,746.80

adinelsa
ELECTRO ORIENTE S.A.
VALORIZACION DE ENERGIA Y POTENCIA
CLIENTE : ELECTRONORTE S.A.- CENTRO DE SERVICIOS CHACHAPOYAS
MES : ENERO 2012

Formato de Informacin Mensual. CACLIC

BARRA DE ENTREGA PRECIO DE BARRA ENERGIA ACTIVA KWH P. M. D


ENERGIA ENERGIA
PEB PEB ENERGIA
PPB PEERI - I PEERI - C HORA REACTIVA REACTIVA ENERGIA
NOMBRE TENSION S/.Kw-
ctm Sol- ctm Sol-
cS/. cS/. H. P H. F. P ACTIVA PUNTA KVAR KVAR POTENCIA
H.P.
Kwh Kwh VENDIDA INDUCTIVA CAPACITIVA S/.
mes KVARh KVARh Kw S/.
HP HFP TOTAL
1.- S.E. CHACHAPOYAS 22,9 Kv 18.040 17.500 17.500 1.130 2.261 347,191.67 969,911.75 1,317,103.42 3,283.86 59,240.83 60,758.54
2.- S.E. LUYA - LAMUD 22,9 Kv 18.040 17.500 17.500 1.130 2.261 122,211.00 275,769.59 397,980.59 1,237.04 22,316.20 21,386.93
3,- C.P.M. CACLIC 4,16 Kv 18.040 17.500 17.500 1.130 2.261 305.20 261.00 566.20 4.00 72.16 53.41
4.- FUNDO LA PITAYA 4,16 Kv 18.040 17.500 17.500 1.130 2.261 9.00 8.00 17.00 0.50 9.02 1.58
5.- PSE LEYMEBAMBA 22.9 Kv 18.040 17.500 17.500 1.130 2.261 51,929.92 112,824.82 164,754.74 525.65 5,812.62 9,482.73 9,087.74
TOTAL 521,646.79 1,358,775.16 1,880,421.95 5,051.05 - 5,812.62 91,120.94 91,288.19
POTENCIA CONTRATADA 5,100.00
EXCESO DE P.C -
TOTAL GENERAL 91,120.94
DPTO. GENERACION AMAZONAS CAJAMARCA

Formato G2

VALORIZACION
ENERGIA
ENERGIA
ENERGIA ENERGIA REACTIVA
POTENCIA ENERGIA REACTIVA TOTAL
H.P. H.F.P CAPACITIV
S/. S/. INDUCTIVA S/.
S/. S/. A
S/.
S/.
76,144.01 112,305.51 448,443.05 560,748.57 752.34 23.25 660,359.52
76,144.01 112,305.51 448,443.05 560,748.57 752.34 23.25 660,359.52

-
-
76,144.01 448,443.05 560,748.57 752.34 23.25 660,359.52

DPTO. GENERACION AMAZONAS CAJAMARCA


Formato G2

VALORIZACION
ENERGIA
ENERGIA
ENERGIA ENERGIA REACTIVA
POTENCIA ENERGIA REACTIVA TOTAL
H.P. H.F.P CAPACITIV
S/. S/. INDUCTIVA S/.
S/. S/. A
S/.
S/.
34,741.20 24,027.42 72,004.91 96,032.33 532.94 152,053.27
34,741.20 24,027.42 72,004.91 96,032.33 532.94 - 152,053.27

340.60 340.60
-
35,081.80 96,032.33 532.94 - 152,393.87

DPTO. GENERACION AMAZONAS CAJAMARCA


Formato G2

VALORIZACION

ENERGIA ENERGIA
ENERGIA
ENERGIA REACTIVA REACTIVA TOTAL
H.F.P
S/. INDUCTIVA CAPACITIVA S/.
S/.
S/. S/.

169,734.56 230,493.10 - - 289,733.93


48,259.68 69,646.60 - - 91,962.80
45.68 99.09 - - 171.25
1.40 2.98 - - 12.00
19,744.34 28,832.08 - 131.42 38,446.23
237,785.65 329,073.84 - 131.42 420,326.21

-
329,073.84 - 131.42 420,326.21

1,233,079.59
adinelsa
ELECTRO ORIENTE DPTO. GENERACION AMAZONAS - CAJAMARCA

INFORMACION DE EMPRESAS GENERADORAS

DATOS DE GENERACION
FORMATO DE INFORMACION MENSUAL

EMPRESA: ELECTRO ORIENTE S.A. FECHA:02/06/2012


MES : ENERO - 2012
FORMATO G1

CENTRAL HIDROELECTRICA POTENCIA PRODUCCION BRUTA CONSUMO PRODUCCION MAXIMA Horas de HORAS Horas de
INSTALADA EFECTIVA H.P. H.F.P. TOTAL PROPIO NETA DEMANDA Mantto DE Salidas
NOMBRE GRUPO ESTADO (Mw) (Mw) (Mwh) (Mwh) (Mwh) (Mwh) (Mwh) (Mw) Programado OPERACION Forzadas
C.H. MUYO G-1 OP 2.837 2.600 287.020 1471.219 1,758.239 2.698 743.72
G-2 OP 2.837 2.600 278.111 1444.899 1,723.010 2.606 743.18
TOT. C.H. MUYO 2 5.674 5.200 565.131 2,916.118 3,481.249 9.247 3,472.002 5.278 5.50 744.00
C.H. LA PELOTA G-1 OP 1.590 1.450 131.729 661.449 793.178 1.520 3.00 707.59
G-2 OP 1.590 1.450 128.373 684.869 813.242 1.449 5.00 721.44
TOT. C.H. LA PEL. 2 3.180 2.800 260.102 1,346.318 1,606.420 7.020 1,599.400 2.809 8.00 725.10
C.H. LONYA GDE G-1 OP 0.190 0.180 14.408 25.698 40.106 0.180 5.00 350.65
G-2 OP 0.190 0.180 14.151 26.579 40.730 0.175 4.00 349.72
TOT. C.H. LONYA GDE 0.380 0.360 28.559 52.277 80.836 0.500 80.336 0.339 9.00 360.00
C.H. QUANDA G-1 OP 1.438 1.400 171.442 321.268 492.710 1.350 12.00 432.44
G-2 OP 1.438 1.400 388.680 365.881 754.561 1.380 8.00 730.75
TOT. C.H. QUANDA 2.876 2.800 560.122 687.149 1,247.271 2.863 1,244.408 2.509 20.00 731.94
TOTAL: SISTEMA M-LP. 12.110 11.160 1413.914 5001.862 6415.776 19.630 6396.146 10.855 42.50 744.00
adinelsa
ELECTRO ORIENTE S.A DPTO. GENERACION AMAZONAS - CAJAMARCA

INFORMACION DE EMPRESAS GENERADORAS

DATOS DE GENERACION
FORMATO DE INFORMACION MENSUAL

EMPRESA: ELECTRO ORIENTE S.A. FECHA:11/05/2011


MES : OCTUBRE - 2011
FORMATO G1

CENTRAL HIDROELECTRICA POTENCIA PRODUCCION BRUTA CONSUMO PRODUCCION MAXIMA Horas de HORAS Horas de
ESTADO INSTALADA EFECTIVA H.P. H.F.P. TOTAL PROPIO NETA DEMANDA Mantto DE Salidas
NOMBRE GRUPO (Mw) (Mw) (Mwh) (Mwh) (Mwh) (Mwh) (Mwh) (Mw) Programado OPERACION Forzadas
C.H. CACLIC G-1 OP 1.253 1.200 114.072 404.682 518.754 1.191 19.50 722.40 0.83
G-2 OP 1.253 1.200 128.004 294.470 422.474 1.136 6.00 598.23 0.83
G-3 OP 1.253 1.200 65.561 222.897 288.458 1.137 158.50 405.04
G-4 OP 1.253 1.200 117.330 437.453 554.783 1.120 713.29 0.83
TOTAL C.H. CACLIC 4 5.012 4.800 424.967 1359.502 1,784.469 8.502 1,775.967 4.197 184.00 743.17 0.33
C.T. CHACHAPOYAS Cat 1 OP 0.500 0.400 5.312 0.000 5.312 0.347 23.18 0.67
Cat 2 OP 0.500 0.400 2.994 0.000 2.994 0.350 14.69 0.67
Cat 1_Alq OP 1.200 0.800 43.772 0.000 43.772 0.852 65.59 0.67
Cat 2_Alq OP 1.200 0.800 55.055 0.000 55.055 0.811 79.80 0.67
TOT. C.T. CHACHAPOYAS 3.400 2.400 107.133 0.000 107.133 2.678 104.455 1.955 - 80.50 0.83
TOTAL: SISTEMA Chachapoyas 8.412 7.200 532.100 1359.502 1891.602 11.180 1880.422 5.084 184.00 743.17 0.83
adinelsa
ELECTRO ORIENTE S.A. DPTO. GENERACION A-C.

INFORMACION DE EMPRESAS GENERADORAS


BALANCE MENSUAL DE ENERGIA ELECTRICA

FORMATO DE INFORMACION MENSUAL FORMATO : G5


NOMBRE DE LA EMPRESA : ELECTRO ORIENTE S.A.
NOMBRE DEL SISTEMA : C.H MUYO - C.H. LA PELOTA
MES Y AO : ENERO - 2 012

CONCEPTO Mwh
1.- ENERGIA PRODUCIDA 6,415.776
1.1.- HIDROELECTRICA 6,415.776
1.2.- TERMOELECTRICA
a) Diesel
b) Vapor
c) Gas
d) Ciclo Combinado
e) Otros
2.- COMPRA DE ENERGIA
2.1.- DE EMPRESAS GENERADORAS
2.1.1.- COES-SICN
2.1.2.- COES-SUR
2.2.- DE OTROS
3.- CONSUMO PROPIO DEL SISTEMA 19.630
4.- PERDIDAS SISTEMA DE TRANSMISION 4.48% 287.182
4.1.- En muy Alta Tensin
4.2.- En Alta Tensin
4.3.- En Media Tensin
5.- ENERGIA TOTAL DISPONIBLE: (1+2-3-4)=(6) 6,108.964
6.- VENTA DE ENERGIA
6.1.- A EMPRESAS GENERADORAS
6.1.1.- COES-SICN
6.1.2.- COES-SUR
6.1.3.- Otras
6.2.- A EMPRESAS DISTRIBUIDORAS 6,108.964
6.2.2.- Mercado Libre
6.2.3.- Mercado Regulado 6,108.964
6.3.- A CLIENTES LIBRES
6.3.1.- En muy Alta Tensin
6.3.2.- En Alta Tensin
6.3.3.- En Media Tensin
adinelsa
ELECTRONORTE DPTO. GENERACION A-C.

INFORMACION DE EMPRESAS GENERADORAS


BALANCE MENSUAL DE ENERGIA ELECTRICA

FORMATO DE INFORMACION MENSUAL FORMATO : G5


NOMBRE DE LA EMPRESA : ELECTRO ORIENTE S.A.
NOMBRE DEL SISTEMA : C.H. CACLIC
MES Y AO : ENERO - 2 012

CONCEPTO Mwh
1.- ENERGIA PRODUCIDA 1,891.602
1.1.- HIDROELECTRICA 1,784.469
1.2.- TERMOELECTRICA 107.133
a) Diesel
b) Vapor
c) Gas
d) Ciclo Combinado
e) Otros
2.- COMPRA DE ENERGIA
2.1.- DE EMPRESAS GENERADORAS
2.1.1.- COES-SICN
2.1.2.- COES-SUR
2.2.- DE OTROS
3.- CONSUMO PROPIO DEL SISTEMA 11.180
4.- PERDIDAS SISTEMA DE TRANSMISION
4.1.- En muy Alta Tensin
4.2.- En Alta Tensin
4.3.- En Media Tensin
5.- ENERGIA TOTAL DISPONIBLE: (1+2-3-4)=(6) 1,880.422
6.- VENTA DE ENERGIA
6.1.- A EMPRESAS GENERADORAS
6.1.1.- COES-SICN
6.1.2.- COES-SUR
6.1.3.- Otras
6.2.- A EMPRESAS DISTRIBUIDORAS 1,880.422
6.2.2.- Mercado Libre
6.2.3.- Mercado Regulado 1,880.422
6.3.- A CLIENTES LIBRES
6.3.1.- En muy Alta Tensin
6.3.2.- En Alta Tensin
6.3.3.- En Media Tensin

You might also like