BASED ON CHRA 2016 RECOMMENDATION:

BIL. DESCRIPTION DATE OF OSH VERIFY BY:


IMPLEMENT
1. Covered shoes in laboratory

2. Reminder signage for wearing cover shoes at April 2017


all laboratorys entrance
3. Concrete spill containment for diesel storage
tank
4. Scheduled Waste Store Spill containment
design
5. Chemical storage

6. Plastic tray for boiler water test chemical March 2017


container
7. Relocate laboratory administrative corner
8. Installation window to isolate boiler water March 2017
analysis room
8. Washing basin for organic solvent handling
9. Periodically cleaning program for wall
mounted ventilation fan in Laboratory
10. Housekeeping at CaCO3 storage area and Clay
Bath area
11. Portable welding fume extractor for welding
activities at enclosure
12. Industrial fans (ventilation fan) for welding
activities
13. Pest control

14. Display Dasar Keselamatan di Tempat Kerja March 2017

15. SOP for store (chemical receiving protocol)


16. SOP for Nalco 156C PULV
17. Implementation FIFO for chemical Jan 2017
18. SOP Briefing for Workshop
19. Storage cage for compressed gas cylinder
20. PPE (DOSH approval model) and recorded.
21. Chemical resistant gloves
Half-mask respirator and current usage
cartridge storage
Goggles and N95 particulate respirator during
CaCO3 handling task