You are on page 1of 20

Hari, Tanggal Selasa, 1 November 2016

Inlet Outlet
Range Setiap
oNH + (ppm) oNH + (ppm)
60 menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 2.42 7.13 0.56 0.27 1.57 6.93 0.55
Ke- 2 2.62 7.05 0.51 0.31 1.87 7.01 0.52
Ke- 3 2.35 7.08 0.42 0.28 1.65 7.05 0.40
Ke- 4 2.13 7.06 0.71 0.31 1.39 7.02 0.59
Ke- 5 3.11 7.04 0.61 0.33 0.98 7.00 0.58
Ke- 6 2.52 7.06 0.55 0.29 1.28 7.03 0.53
Ke- 7
Ke- 8

Hari, Tanggal Rabu, 2 November 2016


Inlet Outlet
Range Setiap
oNH + (ppm) oNH + (ppm)
60 menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 3.62 7.01 0.63 0.45 1.54 7.02 0.57
Ke- 2 3.30 7.00 0.65 0.44 0.72 7.06 0.63
Ke- 3 2.16 7.03 0.77 0.33 0.77 7.08 0.72
Ke- 4 2.12 7.11 0.75 0.27 0.72 7.08 0.71
Ke- 5 2.25 7.12 0.73 0.13 0.52 7.18 0.69
Ke- 6
Ke- 7
Ke- 8

Hari, Tanggal Kamis, 3 November 2016


Inlet Outlet
Range Setiap
oNH + (ppm) oNH + (ppm)
60 menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 5.53 6.97
### 0.47 0.30 3.94 7.12
### 0.39
Ke- 2 5.39 7.02
### 0.45 0.26 3.71 7.15
### 0.40
Ke- 3 9.58 7.00
### 0.48 0.12 5.45 7.13
### 0.50
Ke- 4 3.64 6.99
### 0.54 0.20 1.70 7.05
### 0.52
Ke- 5
Ke- 6
Ke- 7
Ke- 8
utlet Removal
MBAS (ppm)
0.24 11.1%
0.27 12.9%
0.20 28.6%
0.22 29.0%
0.27 18.2%
0.22 24.1%

utlet
MBAS (ppm)
0.40 11.1%
0.42 4.5%
0.25 24.2%
0.24 11.1%
0.09 30.8%

utlet
MBAS (ppm)
0.28 6.7%
0.24 7.7%
0.08 33.3%
0.18 10.0%
Hari, Tanggal Senin, 7 November 2016
Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 5.53 6.97 0.47 0.30 3.94 7.12 0.39
Ke- 2 5.19 7.02 0.45 0.26 3.71 7.15 0.40
Ke- 3 9.58 7.00 0.48 0.13 5.45 7.13 0.50
Ke- 4 3.64 6.99 0.34 0.20 1.70 7.05 0.52
Ke- 5
Ke- 6
Ke- 7
Ke- 8

Hari, Tanggal Selasa, 8 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 2.02 7.04 0.37 0.06 0.67 7.09 0.34
Ke- 2
Ke- 3
Ke- 4 Ganti Komposisi Media
Ke- 5 1.79 7.01 0.87 0.12 1.66 7.12 0.85
Ke- 6 2.63 7.30 0.66 0.33 2.78 7.25 0.79
Ke- 7 1.64 7.40 0.25 0.94 0.88 7.26 0.28
Ke- 8

Hari, Tanggal Rabu, 9 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1
Ke- 2
Ke- 3
Ke- 4
Pejompongan
Ke- 5
Ke- 6
Ke- 7
Ke- 8

Hari, Tanggal Kamis, 10 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1
Ke- 2
Ke- 3
Ke- 4
Ke- 5
Ke- 6
Ke- 7
Ke- 8
utlet Removal
MBAS (ppm)
0.28 6.7%
0.24 7.7%
0.08 38.5%
0.18 10.0%

utlet
MBAS (ppm)
0.12 -100.0% pencilan
#DIV/0!
#DIV/0!
#DIV/0!
0.19 -58.3% pencilan
0.27 18.2%
0.93 1.1%

utlet
MBAS (ppm)

utlet Removal
MBAS (ppm)
Hari, Tanggal senin, 14 November 2016
Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 2.05 7.05 0.41 0.26 15.00 7.09 0.51
Ke- 2 1.48 7.09 0.34 0.18 1.18 7.10 0.33
Ke- 3 1.60 7.06 0.48 0.12 0.69 7.08 0.43
Ke- 4 1.36 7.07 0.37 0.18 0.51 7.10 0.33
Ke- 5 1.57 7.09 0.37 0.17 0.84 7.14 0.39
Ke- 6
Ke- 7
Ke- 8

Hari, Tanggal selasa, 15 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 2.41 7.11 0.54 0.26 2.98 7.10 0.44
Ke- 2 2.51 7.16 0.57 0.29 0.93 7.16 0.40
Ke- 3 2.34 7.10 0.61 0.37 0.82 7.10 0.53
Ke- 4 2.43 7.07 0.53 0.40 0.79 7.07 0.46
Ke- 5 3.19 7.07 0.61 0.49 0.91 7.07 0.50
Ke- 6 1.87 7.10 0.54 0.35 0.85 7.10 0.48
Ke- 7 1.50 7.16 0.65 0.65 0.98 7.16 0.55
Ke- 8

Hari, Tanggal Rabu, 16 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 Backwash
Ke- 2 4.40 7.00 0.78 0.40 2.98 7.10 0.44
Ke- 3 5.06 7.10 0.80 0.35 0.93 7.16 0.40
Ke- 4 3.73 7.06 0.50 0.33 0.82 7.10 0.53
Ke- 5
Ke- 6
Ke- 7
Ke- 8

Hari, Tanggal Kamis, 17 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1
Ke- 2
Ke- 3
Ke- 4
Ke- 5
Ke- 6
Ke- 7
Ke- 8
Outlet Removal
MBAS (ppm)
0.24 7.7%
0.24 -33.3%
0.28 -133.3%
0.37 -105.6%
0.35 -105.9%

Outlet Removal
MBAS (ppm)
0.24 7.7%
0.18 37.9%
0.16 56.8%
0.22 45.0%
0.41 16.3%
0.17 51.4%
0.41 36.9%

Outlet Removal
MBAS (ppm)

0.24 40.0%
0.18 48.6%
0.16 51.5%

Outlet Removal
MBAS (ppm)
Hari, Tanggal senin, 21 November 2016
Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 1.50 6.93 0.47 0.13 0.73 7.01 0.41
Ke- 2 2.65 7.05 0.84 0.13 1.25 7.10 0.75
Ke- 3 3.67 7.15 0.66 0.40 1.31 7.17 0.60
Ke- 4 5.45 7.14 0.62 0.18 2.08 7.16 0.59
Ke- 5
Ke- 6
Ke- 7
Ke- 8

Hari, Tanggal selasa, 22 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1
Ke- 2 preparasi double filter
Ke- 3
Ke- 4 3.79 7.11 1.04 0.11 6.28 7.47 1.01
Ke- 5 listrik padam
Ke- 6 2.67 7.12 0.90 0.26 0.79 7.37 0.89
Ke- 7 2.42 7.12 0.97 0.20 0.84 7.37 0.94
Ke- 8 3.63 7.21 1.02 0.20 1.59 7.35 0.96

Hari, Tanggal rabu, 23 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 listrik padam
Ke- 2 2.40 7.08 0.65 0.11 1.00 7.26 0.60
Ke- 3 2.50 7.08 0.76 0.10 0.80 7.23 0.70
Ke- 4 3.30 7.09 0.98 0.16 1.00 7.17 0.94
Ke- 5 2.80 7..05 0.98 0.14 0.90 7.23 0.96
Ke- 6
Ke- 7
Ke- 8

Hari, Tanggal kamis, 24 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 1.87 6.89 0.93 0.62 2.20 6.97 0.90
Ke- 2 5.40 6.52 0.81 0.46 3.10 6.75 0.79
Ke- 3 1.84 6.89 0.88 0.40 0.77 6.78 0.87
Ke- 4
Ke- 5
Ke- 6
Ke- 7
Ke- 8
utlet Removal
MBAS (ppm)
0.12 7.7%
0.07 46.2%
0.19 52.5%
0.17 5.6%

utlet
MBAS (ppm)

0.03 72.7%

0.21 19.2%
0.13 35.0%
0.14 30.0%

utlet
MBAS (ppm)

0.07 36.4%
0.06 40.0%
0.10 37.5%
0.05 64.3%

utlet Removal
MBAS (ppm)
0.23 62.9%
0.32 30.4%
0.28 30.0%
Hari, Tanggal senin, 28 November 2016
Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 1.16 6.89
### 0.31 0.25 1.14 6.90
### 0.29
Ke- 2 1.73 7.00
### 0.33 0.22 0.35 7.05
### 0.31
Ke- 3 1.31 6.89
### 0.35 0.16 0.44 7.00
### 0.32
Ke- 4 1.56 7.02
### 0.31 0.10 0.37 7.08
### 0.26
Ke- 5
Ke- 6 0.93 6.94
### 0.43 0.07 0.39 7.05
### 0.42
Ke- 7 0.55 6.96
### 0.31 0.09 0.12 7.05
### 0.30
Ke- 8

Hari, Tanggal selasa, 29 November 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 1.10 7.14
### 0.37 0.21 0.54 7.13
### 0.36
Ke- 2 1.00 6.95
### 0.39 0.07 0.42 6.99
### 0.36
Ke- 3 0.91 6.98
### 0.57 0.07 0.63 6.95
### 0.52
Ke- 4 0.89 6.97
### 0.68 0.11 0.35 7.02
### 0.65
Ke- 5
Ke- 6
Ke- 7
Ke- 8

Hari, Tanggal kamis,1 desember 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 1.13 6.94 1.60 0.41 0.87 7.06 1.49
Ke- 2 1.53 7.01 1.46 0.18 1.00 7.05 1.43
Ke- 3 1.14 6.99 1.48 0.24 0.89 7.03 1.41
Ke- 4 1.02 7.07 1.46 0.46 0.62 7.14 1.45
Ke- 5
Ke- 6
Ke- 7
Ke- 8
utlet Removal
MBAS (ppm)
0.36 -44%
0.35 -59%
0.25 -56%
0.17 -70%

0.19 -171%
0.04 56%

utlet Removal
MBAS (ppm)
0.08 61.9%
0.04 42.9%
0.03 57.1%
0.07 36.4%

utlet
MBAS (ppm)
0.35 14.6%
0.14 22.2%
0.14 41.7%
0.22 52.2%
Hari, Tanggal selasa, 6 desember 2016
Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 1.84 7.01 0.36 0.24 0.77 7.14 0.32
Ke- 2 1.87 7.01 0.38 0.13 0.46 7.14 0.36
Ke- 3 1.72 7.03 0.45 0.20 0.40 7.15 0.42
Ke- 4 Istirahat
Ke- 5 1.48 7.07 0.43 0.20 0.35 7.14 0.40
Ke- 6 1.43 7.09 0.43 0.26 0.36 7.20 0.42
Ke- 7 1.32 7.13 0.39 0.05 0.47 7.22 0.38
Ke- 8

Hari, Tanggal Rabu, 7 desember 2016


Inlet Outlet
Range Setiap 60
oNH (ppm)
+ oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 1.64 7.08 0.28 0.22 0.51 7.19 0.25
Ke- 2 Backwash
Ke- 3 1.31 7.12 0.32 0.19 6.35 7.27 0.29
Ke- 4 1.34 7.07 0.38 0.22 0.54 7.23 0.34
Ke- 5 istirahat
Ke- 6 1.13 7.03 0.39 0.18 0.57 7.14 0.38
Ke- 7 1.04 7.07 0.42 0.13 0.16 7.20 0.41
Ke- 8 1.06 7.13 0.40 0.06 0.61 7.16 0.38
utlet removal
MBAS (ppm)
0.01 95.8%
0.01 92.3%
0.01 95.0%

0.01 95.0%
0.01 96.2%
0.03 40.0%

utlet
MBAS (ppm)
0.09 59.1%

0.01 94.7%
0.03 86.4%

0.01 94.4%
0.01 92.3%
0.01 83.3%
Hari, Tanggal selasa, 13 desember 2016
Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 1.08 7.10 0.60 0.23 0.47 7.17 0.55
Ke- 2 0.92 7.03 0.58 0.17 0.48 7.19 0.55
Ke- 3 0.85 7.11 0.79 0.16 0.56 7.21 0.71
Ke- 4 1.07 7.11 1.04 0.06 0.56 7.33 1.02
Ke- 5 1.32 7.09 1.18 0.16 0.25 7.14 1.13
Ke- 6 1.30 7.13 1.10 0.15 0.27 7.19 1.08
Ke- 7
Ke- 8

Hari, Tanggal Rabu, 14 desember 2016


Inlet Outlet
Range Setiap 60
oNH + (ppm) oNH + (ppm)
menit NTU pH C 4 MBAS (ppm) NTU pH C 4
Ke- 1 backwash 11:45
Ke- 2 1.16 7.05 1.35 0.27 1.8 7.28 1.23
Ke- 3 0.95 7.07 1.31 0.19 0.63 7.26 1.2
Ke- 4 1.23 7.12 0.84 0.2 0.55 7.4 0.71
Ke- 5 1.40 7.14 0.92 0.25 0.41 7.25 0.86
Ke- 6
Ke- 7
Ke- 8
utlet
MBAS (ppm) removal
0.17 26.1%
0.10 41.2%
0.01 93.8%
0.01 83.3%
0.01 93.8%
0.01 93.3%

utlet
MBAS (ppm)

0.03 88.9%
0.03 84.2%
0.03 85.0%
0.04 84.0%