You are on page 1of 1

lndiar}oil

Welding Procedure Specification (WPS)


DAS OFFSHORE ENGG.PVT. LTD
lcope Of Work FIRE WATER SYSTEM PARADIP CRUDE OIL TANK FARM LOCATION
)escription >ioe-Pioe/Pioe-Fitti ns
/VPS No. OCL/DAS/NOCPL/WPS-1
)QR No. rocL/DAS/NOCPL/PQR-1
\PPLICABLE CODE qNSt 8.31.4, APt 1104
]ASE MATERIAL lS3589 Gr. 410
)IAMETER L4" NB
THICKNESS 7.92mm
)iameter Range 5" to 36" NB
RANGE QUALIFIED Ihk 3.96 mm to 15.8 mm
/t/ELD PROGRESSION ROOT - UPHILL, OTHER PASSES - DOWNHILL
FILLER MATERIAL :5010, E 7018
No of Welder 1
WELDING PROCESS JMAW
WELDING TYPE MANUAL
ut/ELDING PROGRESSION UPHILL / DOWN HILL
WELDING POSITION 5G
NO. OF WELDER 3NE
NO. OF PASS & SEQUENCE AS PER JOINT DESIGN
:LEANING METHOD GRINDING(AFTER ROOT PASS) AND POWR BRUSH (AFTER ALL OTHER PASSES)
MIN. PREHEAT TEMPERATURE 10
MAx.INTERPASS TEMPERATURE 250'C
PWHT NA
METHOD OF BACK GOUGING NA

Remarks: Visual Site lnspection along with 10% Radiography.

WELDING PARAMETERS
Welding Consumable Weldint Parameters
WELD I ravell Welding Welding
Pass No Remarks
Process AWS Class Dia (mm) Polarity Amp. (A) volt(v) Speed Position Direction
(mm/Min)

ROOT SMAW Ador 6010 25 105-210 HILV


80-120 23-27
hF*'
E DCEP 6G UP
Era/t{.{+ttt

HOT SMAW Ador E 7018 32 DCEP 90-r.10 26-32 110-240 6G UP HILV


Ar
\1.--
FLL SMAW Ador E 7018 4 DCEP 80-r.10 26-30 L70-240 6G UP HILV
DOWN HILI.

CAP SMAW Ador E 7018 4 DCEP 80-110 25-30 90-170 6G UP HILV


DOWN HILI
Prepared BylChecked By Reiviewed By \ Approved by