METODO GRAFICO DE DYKSTRA - PARSONS

DATOS :
= 29 % Krw = 0,2 md
A= 1043 ac-pies Kro = 0,8 md
h= 20,2 pies w = 0,5 cps
Swc = 32 % o = 10,68 cps
Soi = 52,21 % * EA = 70 %
Sor = 36,81 % K50% = 160 md
Bo = 1,062 bbl/bbf * K84,1% = 57 md
Qiny = 4800 BPD Npf = 6873527,19 bbls
M= 5,34 N'p = 4811469,03 bbls
V = 0,6438 N'p = 4,81147 MM bbls

Muestra FRAC % PROB. Kj


i
1 0 0,000 1132
2 1 5,263 791
3 2 10,526 562
4 3 15,789 416
5 4 21,053 325
6 5 26,316 271
7 6 31,579 238
8 7 36,842 217
9 8 42,105 199
10 9 47,368 182
11 10 52,632 163
12 11 57,895 142
13 12 63,158 121
14 13 68,421 101
15 14 73,684 84
16 15 78,947 70
17 16 84,211 59
18 17 89,474 49
19 18 94,737 33
20 19 100,000 4

- VARIACION DE PERMEABILIDAD, Vk

DE LA GRAFICA K vs % MAYOR QUE: K50%= 160 K84,1% = 57

K50% - K84,1% 160 - 57


Vk = = 0,64375
K50% 160

- RELACION DE MOVILIDAD, M

M = Krw*o 0,2 * 10,68


= 5,34
Kro*w 0,8 * 0,5

- PRODUCCION DE PETROLEO, N'p

7758*A*h*(Soi - Sor) 7758*1043*20,2*0,29*(0,5221 - 0,3681)


Npf = = 6,8735 MM BF
Bo 1,062

N'p = Npf * Ep 6,8735 * 0,70 = 4,81147 MM BF

By: JPSI DP-Grafico Pgina 1


WOR DE FIG 5,8 GRAFICAS R Np Wp WINY tINY Np Wp tINY Qo Qw
0 CORRELACION DE JOHNSON'S MM BBL MM BBL MM BBL aos MM BBL MM BBL aos BPD BPD
1 R(1-Swi) 0,0430 0,0632 0,30425 0,152 5,2619 3,003 0,3043 0,1521 3,0034 277,55 138,77
5 R(1-0,72 Swi) 0,1500 0,1949 0,93779 1,901 7,0104 4,001 0,6335 1,7485 0,9980 1739,21 4800,00
25 R(1-0,52 Swi) 0,2400 0,2879 1,38526 6,712 11,8219 6,748 0,4475 4,8115 2,7463 446,40 4800,00
100 R(1-0,40 Swi) 0,3250 0,3727 1,79327 25,500 30,6101 17,472 0,4080 18,7882 10,7239 104,24 4800,00

PROCEDIMIENTO DE CALCULOS:
- RECUPERACION FRACCIONAL A VALORES DE WOR = 1, 5, 25 Y 100
DE CORRELACION DE JOHNSON'S, CON M = 5,34 Y Vk = 0,6438 SE OBTIENEN:

PARA WOR = 1 R(1-Swi) = 0,043 0,043


R= = 0,0632
(1 - 0,32)
- Np PARA CADA UNO DE LOS VALORES DE WOR

Np = N'p * R = 4,81147 * 0,0632 = 0,30425 MM BF

- Wp PARA CADA UNO DE LOS VALORES DE WOR


ESTE VALOR SE LO OBTIENE POR INTEGRACION GRAFICA DE LA CURVA Np vs WOR

Wp = (WOR2+WOR1)(Np2-Np1)/2 Wp = 1*0,30425
= 0,1521 MM BBL
2
PARA WOR = 1 Wp = 0,1521 MM Bbl

- VOLUMEN DE AGUA INYECTADA (DESPUES DEL LLENADO), W INY

WINY = N'p * Bo + Wp = 4,81147 * 1,062 + 0,152 = 5,26191 MM BBL

- TIEMPO DE INYECCION, t INY

WINY 5.261.907,44
tINY = = 3,0034 AOS
QINY * 365 4800 * 365

- CALCULO DE Np

Np = Np1 - Np0 = 0,3043 - 0 = 3,0034 MM BBL

- CALCULO DE Wp

Wp = Wp1 - Wp0 = 0,1521 - 0 = 0,1521 MM BBL

- CALCULO DE TINY

tINY = tINY1 - tINY0 = 3,003 - 0 = 3,003 AOS

- CAUDAL DE PETROLEO PRODUCIDO, Qo

Np 0,3043
Qo = = 277,546 BPD
tINY * 365 3,0034 * 365

- CAUDAL DE AGUA PRODUCIDA, Qw

Wp 0,1521
Qw = = 138,773 BPD
tINY * 365 3,0034 * 365

By: JPSI DP-Grafico Pgina 2


By: JPSI DP-Grafico Pgina 3
2,00

1,80

1,60
VOLUMEN PRODUCIDO, Np MM Bbl

1,40

1,20

1,00

0,80

0,60

0,40

0,20

0,00
0 10 20 30 40 50 60 70 80 90 100
WOR