KINDPA Crane Meeting Salient Points 2017.06.

20

Boom at resting position and perform and random UTTG at bottom of boom mast.
To prioritize on the A-Frame for maintenance painting
Original coating system 1A, able to perform spot repair.
Assessment for fitness for purpose to get help from structural engineer
Plant Inspector to assess overall structural integrity of crane
Painting Inspector to assess painting condition and recommend mitigation
NDT - to be performed by STS/5
Crevice corrosion will limit full surface preparation
Best surface preparation for maintenance painting
Scaffolding access near to the pedestal and A-frame
Surface preparation for NDT to be provided by OKSB
Workscoping 1 to identify areas of major repair
Workscoping 2 to identify areas of maintenance painting
Tentative date for mobilization need to coordinate with Operation regarding the FCB