1) Site selection + Building Purpose + Site Planning
- Problem statement - University vision
- Alternative sites considered - Method of selection Survey Why we selected res vs multi Take down multi. - Preliminary cost comparison Elected residential Justify advantages to university, social aspect - Site planning Why selected site (Near la, gare, facilities gym, space availability, privacy) Orientation (sun), setbacks + areas ppgs, OPS, - Integrating aspects (Refer to arnat video) - 2) Architecture and planning - Shape of building, heat dissipation (justify rectangular shape), maximise natural lightening (position of rooms) - Room configuration - Amenities in buildings - Faade design - Use fire exit strategy (Location of staircases) aspect fire guidelines - Accessibility for disables (ramp, width of corridor) - % of green area - Construction materials, finishes 3) Design, BBS, BoQ, Value Engineering - Member elements, codes of practice, bearing capacity, raft, basement walls - Shear walls, wind loads, deflection limits satisfied - Software Staad Pro, Robot - Amount of steel used in tons high tensile, mild steel - Project cost, sources of rates, preliminary and detailed cost estimates - M &E out of scope- lump sum - Value Engineering principles applied throughout project - Design of Alucobond, glass panel, timber, timber connections, steel plates 4) Civil works stormwater, wastewater, roadworks, rainwater harvesting, permeable pavements - Rain intensity, return period, coefficient of permeability - Catchment area - Wastewater discharge, alternatives considered, choice criteria, recommended proposal - Peak traffic (assessment of demand) - Road geometry, access, road furniture, number of parking slots 5) Summary + Video -