You are on page 1of 59

RESUMEN

SOCIEDAD MINERA CERRO VERDE S.A.A. AREQUIPA , PERU


PROYECTO: OBRAS DE MOVIMIENTO DE TIERRA, RELLENOS, PAVIMENTOS
A NIVEL DE BASE IMPRIMADA - CARRETERA AR 115

RESUMEN DE METRADOS - VALORIZACION 03


Unidad : m2 y m3
PROGRESIVA : Km. 0+000 - Km- 13+882.09

Progresiva Volumen de Volumen de


Volumen de Volumen de Volumen de Volumen de
Excavacin Conformacin Volumen Imprimacin
Distancia Excavacin Excavacin Conformacin Conformacin
Inicio Fin Material Suelto de Terraplen Base Granular Asfaltica
(m) en Roca Material Suelto de Terraplen de Pedraplenes
(km) (km) (Fundacin) Fundacin (m3) (m2)
(m3) (m3) (m3) (m3)
(m3) (m3)
0+000.000 1+000.000 1,000.00 - 0.08 - 56.70 - - 1,591.50 11,048.38
1+000.000 2+000.000 1,000.00 - 43.93 - 193.20 - - 2,720.85 4,432.99
2+000.000 3+000.000 1,000.00 - 47.70 - 135.00 - - 2,695.85 3,026.07
3+000.000 4+000.000 1,000.00 - 19.90 - 62.25 - - 2,546.13 16,663.52
4+000.000 5+000.000 1,000.00 - 14.10 - 34.10 - - 2,412.55 -
5+000.000 6+000.000 1,000.00 - - - - - - - -
6+000.000 7+000.000 1,000.00 - - 1,144.34 26,335.95 1,424.19 - - -
7+000.000 8+000.000 1,000.00 - - 990.58 10,691.10 464.55 - - -
8+000.000 9+000.000 1,000.00 - 398.85 833.40 18,736.15 363.88 - - -
9+000.000 10+000.000 1,000.00 - - 59.85 - 57.40 - - -
10+000.000 11+000.000 1,000.00 7,271.65 - - - - - - -
11+000.000 11+741.600 741.60 - 1,332.73 4,083.63 265.40 - - -
12+260.000 13+000.000 740.00 - 1,496.43 6,758.74 176.70 - - -
13+000.000 13+882.090 882.09 - 1,307.78 285.82 88.11 - - -
TOTAL 7,271.65 1,832.33 6,143.14 67,086.82 2,840.22 0.00 11,966.88 35,170.96

Page 1
EXCAVACION DE ROCA

SOCIEDAD MINERA CERRO VERDE S.A.A. AREQUIPA , PERU


PROYECTO :OBRAS DE MOVIMIENTO DE TIERRA, RELLENOS, PAVIMENTOS
A NIVEL DE BASE IMPRIMADA - CARRETERA AR 115
Unidad : m3
PROGRESIVAS : Km. 10+000 - Km- 11+000

PLANILLA DE METRADOS - CORTE EN ZONA DE ROCA FIJA

rea de Corte Volumen de Volumen de


rea de Corte
Distancia Material Corte Roca Corte Material
Progresiva Roca Fija
(m) Suelto Fija Suelto
(m2)
(m2) (m3) (m3)

10+000.000 - -
10+010.000 10.00 - - - -
10+020.000 10.00 - - - -
10+030.000 10.00 - - - -
10+040.000 10.00 - - - -
10+050.000 10.00 - - - -
10+060.000 10.00 - - - -
10+070.000 10.00 - - - -
10+080.000 10.00 - - - -
10+090.000 10.00 - - - -
10+100.000 10.00 - - - -
10+110.000 10.00 - - - -
10+120.000 10.00 - - - -
10+130.000 10.00 - - - -
10+140.000 10.00 - - - -
10+150.000 10.00 - - - -
10+160.000 10.00 - - - -
10+170.000 10.00 - - - -
10+180.000 10.00 - - - -
10+190.000 10.00 - - - -
10+200.000 10.00 - - - -
10+210.000 10.00 - - - -
10+220.000 10.00 - - - -
10+230.000 10.00 - - - -
10+240.000 10.00 - - - -
10+250.000 10.00 - - - -
10+260.000 10.00 - - - -
10+270.000 10.00 - - - -
10+280.000 10.00 - - - -
10+290.000 10.00 - - - -
10+300.000 10.00 - - - -
10+310.000 10.00 - - - -
10+320.000 10.00 - - - -
10+330.000 10.00 - - - -
10+340.000 10.00 - - - -
10+350.000 10.00 - - - -
10+360.000 10.00 52.19 - - -
10+370.000 10.00 124.25 14.45 882.20 -
10+380.000 10.00 120.68 9.14 1,224.65 117.95
10+390.000 10.00 111.32 9.97 1,160.00 95.55
10+400.000 10.00 125.93 7.32 1,186.25 86.45
10+410.000 10.00 99.71 9.90 1,128.20 86.10
10+420.000 10.00 45.07 41.17 723.90 255.35
10+430.000 10.00 14.62 16.84 298.45 290.05
10+440.000 10.00 10.33 8.10 124.75 124.70
10+450.000 10.00 6.80 9.12 85.65 86.10
10+460.000 10.00 1.92 2.47 43.60 57.95
10+470.000 10.00 0.82 0.39 13.70 14.30
10+480.000 10.00 0.29 0.15 5.55 2.70

Page 2
10+490.000 10.00 EXCAVACION
0.80 DE ROCA
0.05 5.45 1.00
10+500.000 10.00 2.07 1.15 14.35 6.00
10+510.000 10.00 3.08 2.20 25.75 16.75
10+520.000 10.00 2.53 5.22 28.05 37.10
10+530.000 10.00 10.41 6.11 64.70 56.65
10+540.000 10.00 1.36 4.23 58.85 51.70
10+550.000 10.00 4.68 4.52 30.20 43.75
10+560.000 10.00 9.78 8.26 72.30 63.90
10+570.000 10.00 4.54 6.75 71.60 75.05
10+580.000 10.00 0.16 4.24 23.50 54.95
10+590.000 10.00 - 5.12 - 46.80
10+600.000 10.00 - - - -
10+610.000 10.00 - - - -
10+620.000 10.00 - - - -
10+630.000 10.00 - - - -
10+640.000 10.00 - - - -
10+650.000 10.00 - - - -
10+660.000 10.00 - - - -
10+670.000 10.00 - - - -
10+680.000 10.00 - - - -
10+690.000 10.00 - - - -
10+700.000 10.00 - - - -
10+710.000 10.00 - - - -
10+720.000 10.00 - - - -
10+730.000 10.00 - - - -
10+740.000 10.00 - - - -
10+750.000 10.00 - - - -
10+760.000 10.00 - - - -
10+770.000 10.00 - - - -
10+780.000 10.00 - - - -
10+790.000 10.00 - - - -
10+800.000 10.00 - - - -
10+810.000 10.00 - - - -
10+820.000 10.00 - - - -
10+830.000 10.00 - - - -
10+840.000 10.00 - - - -
10+850.000 10.00 - - - -
10+860.000 10.00 - - - -
10+870.000 10.00 - - - -
10+880.000 10.00 - - - -
10+890.000 10.00 - - - -
10+900.000 10.00 - - - -
10+910.000 10.00 - - - -
10+920.000 10.00 - - - -
10+930.000 10.00 - - - -
10+940.000 10.00 - - - -
10+950.000 10.00 - - - -
10+960.000 10.00 - - - -
10+970.000 10.00 - - - -
10+980.000 10.00 - - - -
10+990.000 10.00 - - - -
11+000.000 10.00 - - - -
Vol. parcial (km 10 - km 11) 7,271.65 1,670.85

Page 3
CORTE MATERIAL SUELTO

SOCIEDAD MINERA CERRO VERDE S.A.A. AREQUIPA , PERU


PROYECTO :OBRAS DE MOVIMIENTO DE TIERRA, RELLENOS, PAVIMENTOS
A NIVEL DE BASE IMPRIMADA - CARRETERA AR 115
Unidad : m3
PROGRESIVAS : Km. 8+000 - Km. 13+882

PLANILLA DE METRADOS - CORTE MAT.SUELTO

rea Corte Volumen Corte


Distancia
Progresiva Mat. Suelto Mat.Suelto
(m)
(m2) (m3)

8+000.000 -
8+010.000 10.00 - -
8+020.000 10.00 - -
8+030.000 10.00 - -
8+040.000 10.00 - -
8+050.000 10.00 - -
8+060.000 10.00 - -
8+070.000 10.00 - -
8+080.000 10.00 - -
8+090.000 10.00 - -
8+100.000 10.00 - -
8+110.000 10.00 - -
8+120.000 10.00 - -
8+130.000 10.00 - -
8+140.000 10.00 - -
8+150.000 10.00 - -
8+160.000 10.00 - -
8+170.000 10.00 - -
8+180.000 10.00 - -
8+190.000 10.00 - -
8+200.000 10.00 - -
8+210.000 10.00 - -
8+220.000 10.00 - -
8+230.000 10.00 - -
8+240.000 10.00 - -
8+250.000 10.00 - -
8+260.000 10.00 - -
8+270.000 10.00 - -
8+280.000 10.00 - -
8+290.000 10.00 - -
8+300.000 10.00 - -
8+310.000 10.00 - -
8+320.000 10.00 - -
8+330.000 10.00 - -

Page 4
CORTE MATERIAL SUELTO

8+340.000 10.00 - -
8+350.000 10.00 - -
8+360.000 10.00 - -
8+370.000 10.00 - -
8+380.000 10.00 - -
8+390.000 10.00 - -
8+400.000 10.00 - -
8+410.000 10.00 - -
8+420.000 10.00 - -
8+430.000 10.00 - -
8+440.000 10.00 - -
8+450.000 10.00 - -
8+460.000 10.00 - -
8+470.000 10.00 - -
8+480.000 10.00 - -
8+490.000 10.00 - -
8+500.000 10.00 - -
8+510.000 10.00 - -
8+520.000 10.00 0.41 -
8+530.000 10.00 0.76 5.85
8+540.000 10.00 1.26 10.10
8+550.000 10.00 5.24 32.50
8+560.000 10.00 8.70 69.70
8+570.000 10.00 7.52 81.10
8+580.000 10.00 11.58 95.50
8+590.000 10.00 3.60 75.90
8+600.000 10.00 0.34 19.70
8+610.000 10.00 1.36 8.50
8+620.000 10.00 - -
8+630.000 10.00 - -
8+640.000 10.00 - -
8+650.000 10.00 - -
8+660.000 10.00 - -
8+670.000 10.00 - -
8+680.000 10.00 - -
8+690.000 10.00 - -
8+700.000 10.00 - -
8+710.000 10.00 - -
8+720.000 10.00 - -
8+730.000 10.00 - -
8+740.000 10.00 - -
8+750.000 10.00 - -
8+760.000 10.00 - -
8+770.000 10.00 - -
8+780.000 10.00 - -
8+790.000 10.00 - -
8+800.000 10.00 - -
8+810.000 10.00 - -
8+820.000 10.00 - -
8+830.000 10.00 - -
8+840.000 10.00 - -

Page 5
CORTE MATERIAL SUELTO

8+850.000 10.00 - -
8+860.000 10.00 - -
8+870.000 10.00 - -
8+880.000 10.00 - -
8+890.000 10.00 - -
8+900.000 10.00 - -
8+910.000 10.00 - -
8+920.000 10.00 - -
8+930.000 10.00 - -
8+940.000 10.00 - -
8+950.000 10.00 - -
8+960.000 10.00 - -
8+970.000 10.00 - -
8+980.000 10.00 - -
8+990.000 10.00 - -
9+000.000 10.00 - -
Vol. parcial (km 8 - km 9) 398.85
13+000.000 -
13+010.000 10.00 - -
13+020.000 10.00 - -
13+030.000 10.00 19.01 47.53
13+040.000 10.00 17.33 181.70
13+050.000 10.00 16.52 169.25
13+060.000 10.00 15.98 162.50
13+070.000 10.00 14.74 153.60
13+080.000 10.00 18.58 166.60
13+090.000 10.00 19.03 188.05
13+100.000 10.00 19.12 190.75
13+110.000 10.00 - 47.80
13+120.000 10.00 - -
13+130.000 10.00 - -
13+140.000 10.00 - -
13+150.000 10.00 - -
13+160.000 10.00 - -
13+170.000 10.00 - -
13+180.000 10.00 - -
13+190.000 10.00 - -
13+200.000 10.00 - -
13+210.000 10.00 - -
13+220.000 10.00 - -
13+230.000 10.00 - -
13+240.000 10.00 - -
13+250.000 10.00 - -
13+260.000 10.00 - -
13+270.000 10.00 - -
13+280.000 10.00 - -
13+290.000 10.00 - -
13+300.000 10.00 - -
13+310.000 10.00 - -
13+320.000 10.00 - -
13+330.000 10.00 - -

Page 6
CORTE MATERIAL SUELTO

13+340.000 10.00 - -
13+350.000 10.00 - -
13+360.000 10.00 - -
13+370.000 10.00 - -
13+380.000 10.00 - -
13+390.000 10.00 - -
13+400.000 10.00 - -
13+410.000 10.00 - -
13+420.000 10.00 - -
13+430.000 10.00 - -
13+440.000 10.00 - -
13+450.000 10.00 - -
13+460.000 10.00 - -
13+470.000 10.00 - -
13+480.000 10.00 - -
13+490.000 10.00 - -
13+500.000 10.00 - -
13+510.000 10.00 - -
13+520.000 10.00 - -
13+530.000 10.00 - -
13+540.000 10.00 - -
13+550.000 10.00 - -
13+560.000 10.00 - -
13+570.000 10.00 - -
13+580.000 10.00 - -
13+590.000 10.00 - -
13+600.000 10.00 - -
13+610.000 10.00 - -
13+620.000 10.00 - -
13+630.000 10.00 - -
13+640.000 10.00 - -
13+650.000 10.00 - -
13+660.000 10.00 - -
13+670.000 10.00 - -
13+680.000 10.00 - -
13+690.000 10.00 - -
13+700.000 10.00 - -
13+710.000 10.00 - -
13+720.000 10.00 - -
13+730.000 10.00 - -
13+740.000 10.00 - -
13+750.000 10.00 - -
13+760.000 10.00 - -
13+770.000 10.00 - -
13+780.000 10.00 - -
13+790.000 10.00 - -
13+800.000 10.00 - -
13+810.000 10.00 - -
13+820.000 10.00 - -
13+830.000 10.00 - -
13+840.000 10.00 - -

Page 7
CORTE MATERIAL SUELTO

13+850.000 10.00 - -
13+860.000 10.00 - -
13+870.000 10.00 - -
13+880.000 10.00 - -
13+882.000 2.00 - -
Vol. parcial (km 13 - km 13.882) 1,307.78

Page 8
CONFORMACION DE TERRAPLEN

SOCIEDAD MINERA CERRO VERDE S.A.A. AREQUIPA , PERU


PROYECTO :OBRAS DE MOVIMIENTO DE TIERRA, RELLENOS, PAVIMENTOS
A NIVEL DE BASE IMPRIMADA - CARRETERA AR 115
Unidad : m3
PROGRESIVAS : Km. 6+000 - Km- 13+882

PLANILLA DE METRADOS - CONFORMACIN DE TERRAPLEN

rea de Volumen de
Distancia Conformacin Conformacin
Progresiva
(m) de Terraplen de Terraplen
(m2) (m3)

6+000.000 7.04
6+010.000 10.00 11.36 92.00
6+020.000 10.00 13.34 123.50
6+030.000 10.00 12.05 126.95
6+040.000 10.00 9.92 109.85
6+050.000 10.00 9.85 98.85
6+060.000 10.00 10.27 100.60
6+070.000 10.00 11.30 107.85
6+080.000 10.00 10.56 109.30
6+090.000 10.00 7.83 91.95
6+100.000 10.00 5.67 67.50
6+110.000 10.00 7.10 63.85
6+120.000 10.00 13.27 101.85
6+130.000 10.00 28.01 206.40
6+140.000 10.00 36.93 324.70
6+150.000 10.00 38.82 378.75
6+160.000 10.00 41.09 399.55
6+170.000 10.00 47.33 442.10
6+180.000 10.00 52.89 501.10
6+190.000 10.00 54.65 537.70
6+200.000 10.00 55.67 551.60
6+210.000 10.00 59.39 575.30
6+220.000 10.00 61.38 603.85
6+230.000 10.00 63.37 782.25
V. ATRS 6+232.490 2.49 63.94
V. ADELANTE 0.00 63.94
6+240.000 10.00 70.19 670.65
6+250.000 10.00 74.23 722.10
6+260.000 10.00 75.17 747.00
6+270.000 10.00 80.81 779.90
6+280.000 10.00 87.94 843.75
6+290.000 10.00 93.00 904.70
6+300.000 10.00 98.38 956.90
6+310.000 10.00 97.36 978.70
6+320.000 10.00 94.36 958.60
6+330.000 10.00 89.45 919.05
6+340.000 10.00 54.37 719.10
6+350.000 10.00 19.50 369.35
6+360.000 10.00 9.60 145.50

Page 9
6+370.000 10.00 CONFORMACION
3.05 DE TERRAPLEN
63.25
6+380.000 10.00 14.58 88.15
6+390.000 10.00 13.64 141.10
6+400.000 10.00 13.97 138.05
6+410.000 10.00 13.97 139.70
6+420.000 10.00 4.23 91.00
6+430.000 10.00 14.35 92.90
6+440.000 10.00 23.43 188.90
6+450.000 10.00 34.00 287.15
6+460.000 10.00 44.79 393.95
6+470.000 10.00 58.89 518.40
6+480.000 10.00 70.63 647.60
6+490.000 10.00 77.01 738.20
6+500.000 10.00 67.89 724.50
6+510.000 10.00 40.20 540.45
6+520.000 10.00 7.77 239.85
6+530.000 10.00 7.41 75.90
6+540.000 10.00 7.46 74.35
6+550.000 10.00 7.23 73.45
6+560.000 10.00 5.20 62.15
6+570.000 10.00 4.95 50.75
6+580.000 10.00 4.96 49.55
6+590.000 10.00 7.93 64.45
6+600.000 10.00 13.82 108.75
6+610.000 10.00 18.70 162.60
6+620.000 10.00 23.58 211.40
6+630.000 10.00 31.27 274.25
6+640.000 10.00 40.89 360.80
6+650.000 10.00 51.25 460.70
6+660.000 10.00 54.61 529.30
6+670.000 10.00 45.77 501.90
6+680.000 10.00 29.85 378.10
6+690.000 10.00 9.05 194.50
6+700.000 10.00 - -
6+710.000 10.00 - -
6+720.000 10.00 - -
6+730.000 10.00 - -
6+740.000 10.00 - -
6+750.000 10.00 - -
6+760.000 10.00 - -
6+770.000 10.00 - -
6+780.000 10.00 - -
6+790.000 10.00 - -
6+800.000 10.00 - -
6+810.000 10.00 - -
6+820.000 10.00 - -
6+830.000 10.00 - -
6+840.000 10.00 - -
6+850.000 10.00 - -
6+860.000 10.00 - -
6+870.000 10.00 - -
6+880.000 10.00 - -
6+890.000 10.00 - -
6+900.000 10.00 - -
6+910.000 10.00 - -
6+920.000 10.00 - -

Page 10
6+930.000 10.00 CONFORMACION
- DE TERRAPLEN
-
6+940.000 10.00 - -
6+950.000 10.00 - -
6+960.000 10.00 58.92 -
6+970.000 10.00 63.17 610.45
6+980.000 10.00 33.03 481.00
6+990.000 10.00 15.57 243.00
7+000.000 10.00 8.99 122.80
Volumen parcial (km 6 - km 7) 26,335.95

7+000.000 8.99
7+010.000 10.00 3.33 61.60
7+020.000 10.00 4.86 40.95
7+030.000 10.00 3.97 44.15
7+040.000 10.00 4.09 40.30
7+050.000 10.00 1.57 28.30
7+060.000 10.00 3.90 27.35
7+070.000 10.00 5.04 44.70
7+080.000 10.00 6.41 57.25
7+090.000 10.00 6.44 64.25
7+100.000 10.00 4.69 55.65
7+110.000 10.00 6.16 54.25
7+120.000 10.00 6.28 62.20
7+130.000 10.00 5.95 61.15
7+140.000 10.00 6.14 60.45
7+150.000 10.00 6.27 62.05
7+160.000 10.00 5.98 61.25
7+170.000 10.00 6.16 60.70
7+180.000 10.00 5.96 60.60
7+190.000 10.00 6.63 62.95
7+200.000 10.00 6.70 66.65
7+210.000 10.00 7.20 69.50
7+220.000 10.00 7.85 75.25
7+230.000 10.00 8.08 79.65
7+240.000 10.00 7.51 77.95
7+250.000 10.00 - -
7+260.000 10.00 - -
7+270.000 10.00 - -
7+280.000 10.00 - -
7+290.000 10.00 - -
7+300.000 10.00 - -
7+310.000 10.00 - -
7+320.000 10.00 10.40 26.00
7+330.000 10.00 31.90 211.50
7+340.000 10.00 32.56 322.30
7+350.000 10.00 1.35 169.55
7+360.000 10.00 - -
7+370.000 10.00 - -
7+380.000 10.00 10.30 -
7+390.000 10.00 13.03 116.65
7+400.000 10.00 12.61 128.20
7+410.000 10.00 12.11 123.60
7+420.000 10.00 11.83 119.70
7+430.000 10.00 10.99 114.10
7+440.000 10.00 10.98 109.85
7+450.000 10.00 11.18 110.80

Page 11
7+460.000 10.00 CONFORMACION
10.65 DE TERRAPLEN
109.15
7+470.000 10.00 10.32 104.85
7+480.000 10.00 10.16 102.40
7+490.000 10.00 9.90 100.30
7+500.000 10.00 9.26 95.80
7+510.000 10.00 6.22 77.40
7+520.000 10.00 8.25 72.35
7+530.000 10.00 13.16 107.05
7+540.000 10.00 18.99 160.75
7+550.000 10.00 26.93 229.60
7+560.000 10.00 34.28 306.05
7+570.000 10.00 37.89 360.85
7+580.000 10.00 40.62 392.55
7+590.000 10.00 42.25 414.35
7+600.000 10.00 39.27 407.60
7+610.000 10.00 31.51 353.90
7+620.000 10.00 21.02 262.65
7+630.000 10.00 14.19 176.05
7+640.000 10.00 16.73 154.60
7+650.000 10.00 17.69 172.10
7+660.000 10.00 17.17 174.30
7+670.000 10.00 16.52 168.45
7+680.000 10.00 14.57 155.45
7+690.000 10.00 12.24 134.05
7+700.000 10.00 11.73 119.85
7+710.000 10.00 11.45 115.90
7+720.000 10.00 11.44 114.45
7+730.000 10.00 11.70 115.70
7+740.000 10.00 10.81 112.55
7+750.000 10.00 11.66 112.35
7+760.000 10.00 13.20 124.30
7+770.000 10.00 12.09 126.45
7+780.000 10.00 7.67 98.80
7+790.000 10.00 5.46 65.65
7+800.000 10.00 8.12 67.90
7+810.000 10.00 8.08 81.00
7+820.000 10.00 8.35 82.15
7+830.000 10.00 8.35 83.50
7+840.000 10.00 8.17 82.60
7+850.000 10.00 7.64 79.05
7+860.000 10.00 8.00 78.20
7+870.000 10.00 7.04 75.20
7+880.000 10.00 6.05 65.45
7+890.000 10.00 6.22 61.35
7+900.000 10.00 7.43 68.25
7+910.000 10.00 7.93 76.80
7+920.000 10.00 7.27 76.00
7+930.000 10.00 7.62 74.45
7+940.000 10.00 8.46 80.40
7+950.000 10.00 9.77 91.15
7+960.000 10.00 10.39 100.80
7+970.000 10.00 10.75 105.70
7+980.000 10.00 12.01 113.80
7+990.000 10.00 15.63 138.20
8+000.000 10.00 20.21 179.20
Volumen parcial (km 7 - km 8) 10,691.10

Page 12
CONFORMACION DE TERRAPLEN
8+000.000 20.21
8+010.000 10.00 23.06 216.35
8+020.000 10.00 22.59 228.25
8+030.000 10.00 24.76 236.75
8+040.000 10.00 25.18 249.70
8+050.000 10.00 26.57 258.75
8+060.000 10.00 28.02 272.95
8+070.000 10.00 28.21 281.15
8+080.000 10.00 26.14 271.75
8+090.000 10.00 25.18 256.60
8+100.000 10.00 25.99 255.85
8+110.000 10.00 28.11 270.50
8+120.000 10.00 30.64 293.75
8+130.000 10.00 31.17 309.05
8+140.000 10.00 29.47 303.20
8+150.000 10.00 26.58 280.25
8+160.000 10.00 25.17 258.75
8+170.000 10.00 27.77 264.70
8+180.000 10.00 30.91 293.40
8+190.000 10.00 32.01 314.60
8+200.000 10.00 31.76 318.85
8+210.000 10.00 34.37 330.65
8+220.000 10.00 33.76 340.65
8+230.000 10.00 34.33 340.45
8+240.000 10.00 33.57 339.50
8+250.000 10.00 35.11 343.40
8+260.000 10.00 44.16 396.35
8+270.000 10.00 46.36 452.60
8+280.000 10.00 47.29 468.25
8+290.000 10.00 47.36 473.25
8+300.000 10.00 47.70 475.30
8+310.000 10.00 46.66 471.80
8+320.000 10.00 33.07 398.65
8+330.000 10.00 26.57 298.20
8+340.000 10.00 24.49 255.30
8+350.000 10.00 24.87 246.80
8+360.000 10.00 25.63 252.50
8+370.000 10.00 32.24 289.35
8+380.000 10.00 46.53 393.85
8+390.000 10.00 56.47 515.00
8+400.000 10.00 59.40 579.35
8+410.000 10.00 60.79 600.95
8+420.000 10.00 60.94 608.65
8+430.000 10.00 60.91 609.25
8+440.000 10.00 60.27 605.90
8+450.000 10.00 61.05 606.60
8+460.000 10.00 61.84 614.45
8+470.000 10.00 58.58 602.10
8+480.000 10.00 56.85 577.15
8+490.000 10.00 52.70 547.75
8+500.000 10.00 0.70 267.00
8+510.000 10.00 - -
8+520.000 10.00 - -
8+530.000 10.00 - -
8+540.000 10.00 - -

Page 13
8+550.000 10.00 CONFORMACION
- DE TERRAPLEN
-
8+560.000 10.00 - -
8+570.000 10.00 - -
8+580.000 10.00 - -
8+590.000 10.00 - -
8+600.000 10.00 - -
8+610.000 10.00 - -
8+620.000 10.00 - -
8+630.000 10.00 - -
8+640.000 10.00 - -
8+650.000 10.00 - -
8+660.000 10.00 - -
8+670.000 10.00 - -
8+680.000 10.00 - -
8+690.000 10.00 - -
8+700.000 10.00 - -
8+710.000 10.00 - -
8+720.000 10.00 - -
8+730.000 10.00 - -
8+740.000 10.00 - -
8+750.000 10.00 - -
8+760.000 10.00 - -
8+770.000 10.00 - -
8+780.000 10.00 - -
8+790.000 10.00 - -
8+800.000 10.00 - -
8+810.000 10.00 - -
8+820.000 10.00 - -
8+830.000 10.00 - -
8+840.000 10.00 - -
8+850.000 10.00 - -
8+860.000 10.00 - -
8+870.000 10.00 - -
8+880.000 10.00 - -
8+890.000 10.00 - -
8+900.000 10.00 - -
8+910.000 10.00 - -
8+920.000 10.00 - -
8+930.000 10.00 - -
8+940.000 10.00 - -
8+950.000 10.00 - -
8+960.000 10.00 - -
8+970.000 10.00 - -
8+980.000 10.00 - -
8+990.000 10.00 - -
9+000.000 10.00 - -
Volumen parcial (km 8 - km 9) 18,736.15
11+000.000 -
11+010.000 10.00 - -
11+020.000 10.00 - -
11+030.000 10.00 - -
11+040.000 10.00 - -
11+050.000 10.00 - -
11+060.000 10.00 - -
11+070.000 10.00 - -

Page 14
11+080.000 10.00 CONFORMACION
- DE TERRAPLEN
-
11+090.000 10.00 - -
11+100.000 10.00 - -
11+110.000 10.00 - -
11+120.000 10.00 - -
11+130.000 10.00 - -
11+140.000 10.00 - -
11+150.000 10.00 50.40 -
11+160.000 10.00 23.13 367.65
11+170.000 10.00 1.18 121.55
11+180.000 10.00 - -
11+190.000 10.00 - -
11+200.000 10.00 5.83 14.58
11+210.000 10.00 8.06 69.45
11+220.000 10.00 7.57 78.15
11+230.000 10.00 2.74 51.55
11+240.000 10.00 0.64 16.90
11+250.000 20.00 - -
11+260.000 30.00 - -
11+270.000 10.00 - -
11+280.000 10.00 - -
11+290.000 10.00 - -
11+300.000 10.00 - -
11+310.000 10.00 4.45 -
11+320.000 10.00 24.99 147.20
11+330.000 10.00 46.95 359.70
11+340.000 10.00 60.30 536.25
11+350.000 10.00 57.70 590.00
11+360.000 10.00 35.90 468.00
11+370.000 10.00 26.63 312.65
11+380.000 10.00 24.19 254.10
11+390.000 10.00 24.01 241.00
11+400.000 10.00 13.67 188.40
11+410.000 10.00 7.15 104.10
11+420.000 10.00 7.03 70.90
11+430.000 10.00 4.40 57.15
11+440.000 10.00 2.47 34.35
11+450.000 10.00 - -
11+460.000 10.00 - -
11+470.000 10.00 - -
11+480.000 10.00 - -
11+490.000 10.00 - -
11+500.000 10.00 - -
11+510.000 10.00 - -
11+520.000 10.00 - -
11+530.000 10.00 - -
11+540.000 10.00 - -
11+550.000 10.00 - -
11+560.000 10.00 - -
11+570.000 10.00 - -
11+580.000 10.00 - -
11+590.000 10.00 - -
11+600.000 10.00 - -
11+610.000 10.00 - -
11+620.000 10.00 - -
11+630.000 10.00 - -

Page 15
11+640.000 10.00 CONFORMACION
- DE TERRAPLEN
-
11+650.000 10.00 - -
11+660.000 10.00 - -
11+670.000 10.00 - -
11+680.000 10.00 - -
11+690.000 10.00 - -
11+700.000 10.00 - -
11+710.000 10.00 - -
11+720.000 10.00 - -
11+730.000 10.00 - -
11+740.000 10.00 - -
V. ATRS 11+741.596 1.60
V. ADELANTE - -
Volumen parcial (km 11 - km 12) 4,083.63
EE. V.AD 12+260.000 -
12+270.000 10.00 - -
12+271.000 1.00 0.10 -
12+280.000 9.00 2.77 12.92
12+290.000 10.00 5.03 39.00
12+300.000 10.00 7.15 60.90
12+310.000 10.00 7.41 72.80
12+320.000 10.00 7.78 75.95
12+330.000 10.00 6.14 69.60
12+340.000 10.00 4.02 50.80
12+350.000 10.00 2.44 32.30
12+360.000 10.00 1.44 19.40
12+370.000 10.00 - -
12+380.000 10.00 0.95 2.38
12+390.000 10.00 1.17 10.60
12+400.000 10.00 2.18 16.75
12+410.000 10.00 1.61 18.95
12+420.000 10.00 0.70 11.55
12+430.000 10.00 1.23 9.65
12+440.000 10.00 1.36 12.95
12+450.000 10.00 2.81 20.85
12+460.000 10.00 3.30 30.55
12+470.000 10.00 2.17 27.35
12+480.000 10.00 2.37 22.70
12+490.000 10.00 1.76 20.65
12+500.000 10.00 1.16 14.60
12+510.000 10.00 1.76 14.60
12+520.000 10.00 1.37 15.65
12+530.000 10.00 1.07 12.20
12+540.000 10.00 4.08 25.75
12+550.000 10.00 12.31 81.95
12+560.000 10.00 24.60 184.55
12+570.000 10.00 33.50 290.50
12+580.000 10.00 32.32 329.10
12+590.000 10.00 24.92 286.20
12+600.000 10.00 13.24 190.80
12+610.000 10.00 11.20 122.20
12+620.000 10.00 14.50 128.50
12+630.000 10.00 18.93 167.15
12+640.000 10.00 19.70 193.15
12+650.000 10.00 12.88 162.90

Page 16
12+660.000 10.00 CONFORMACION
6.88 DE TERRAPLEN
98.80
12+670.000 10.00 6.08 64.80
12+680.000 10.00 4.63 53.55
12+690.000 10.00 4.67 46.50
12+700.000 10.00 5.40 50.35
12+710.000 10.00 8.05 67.25
12+720.000 10.00 16.67 123.60
12+730.000 10.00 18.84 177.55
12+740.000 10.00 6.62 127.30
12+750.000 10.00 5.28 59.50
12+760.000 10.00 5.10 51.90
12+770.000 10.00 5.32 52.10
12+780.000 10.00 6.66 59.90
12+790.000 10.00 5.56 61.10
12+800.000 10.00 1.30 34.30
12+810.000 10.00 10.01 56.55
12+820.000 10.00 8.69 93.50
12+830.000 10.00 3.94 63.15
12+840.000 10.00 3.93 39.35
12+850.000 10.00 4.82 43.75
12+860.000 10.00 8.68 67.50
12+870.000 10.00 13.00 108.40
12+880.000 10.00 18.22 156.10
12+890.000 10.00 25.55 218.85
12+900.000 10.00 32.61 290.80
12+910.000 10.00 34.20 334.05
12+920.000 10.00 32.75 334.75
12+930.000 10.00 24.65 287.00
12+940.000 10.00 25.50 250.75
12+950.000 10.00 23.57 245.35
12+960.000 10.00 12.83 182.00
12+970.000 10.00 - -
12+980.000 10.00 - -
12+990.000 10.00 - -
Volumen parcial (km 12 - km 13) 6,758.74

Page 17
RELLENO BASE

SOCIEDAD MINERA CERRO VERDE S.A.A. AREQUIPA , PERU


PROYECTO :OBRAS DE MOVIMIENTO DE TIERRA, RELLENOS, PAVIMENTOS
A NIVEL DE BASE IMPRIMADA - CARRETERA AR 115
Unidad : m3
PROGRESIVAS : Km. 0+000 - Km. 5+000

PLANILLA DE METRADOS - RELLENO BASE

rea Base Volumen Base


Distancia
Progresiva Granular Granular
(m)
(m2) (m3)

0+000.000 -
0+010.000 10.00 - -
0+020.000 10.00 - -
0+030.000 10.00 - -
0+040.000 10.00 - -
0+050.000 10.00 - -
0+060.000 10.00 - -
0+070.000 10.00 - -
0+080.000 10.00 - -
0+090.000 10.00 - -
0+100.000 10.00 - -
0+110.000 10.00 - -
0+120.000 10.00 - -
0+130.000 10.00 - -
0+140.000 10.00 - -
0+150.000 10.00 - -
0+160.000 10.00 - -
PC 0+170.000 10.00 - -
0+180.000 10.00 - -
0+190.000 10.00 - -
0+200.000 10.00 - -
0+210.000 10.00 - -
0+220.000 10.00 - -
0+230.000 10.00 - -
0+240.000 10.00 - -
0+250.000 10.00 - -
0+260.000 10.00 - -
0+270.000 10.00 - -
0+280.000 10.00 - -
0+290.000 10.00 - -
0+300.000 10.00 - -
0+310.000 10.00 - -
PT 0+320.000 10.00 - -
0+330.000 10.00 - -
0+340.000 10.00 - -
0+350.000 10.00 - -
0+360.000 10.00 - -
0+370.000 10.00 - -
0+380.000 10.00 - -

Page 18
0+390.000 10.00 RELLENO -BASE -
0+400.000 10.00 - -
0+410.000 10.00 - -
0+420.000 10.00 - -
0+430.000 10.00 - -
0+440.000 10.00 - -
0+450.000 10.00 - -
0+460.000 10.00 - -
0+470.000 10.00 - -
0+480.000 10.00 - -
0+490.000 10.00 - -
0+500.000 10.00 3.66 -
0+510.000 10.00 3.84 37.50
0+520.000 10.00 4.02 39.30
0+530.000 10.00 4.02 40.20
0+540.000 10.00 4.02 40.20
0+550.000 10.00 4.02 40.20
0+560.000 10.00 4.02 40.20
0+570.000 10.00 4.02 40.20
0+580.000 10.00 4.02 40.20
0+590.000 10.00 4.02 40.20
0+600.000 10.00 4.02 40.20
0+610.000 10.00 4.02 40.20
0+620.000 10.00 4.02 40.20
0+630.000 10.00 4.02 40.20
0+640.000 10.00 4.02 40.20
0+650.000 10.00 4.02 40.20
PC 0+660.000 10.00 4.00 40.10
0+670.000 10.00 3.84 39.20
0+680.000 10.00 3.67 37.55
0+690.000 10.00 3.54 36.05
0+700.000 10.00 3.46 35.00
0+710.000 10.00 3.28 33.70
0+720.000 10.00 3.12 32.00
0+730.000 10.00 3.00 30.60
0+740.000 10.00 2.93 29.65
0+750.000 10.00 2.80 28.65
0+760.000 10.00 2.65 27.25
0+770.000 10.00 2.55 26.00
PT 0+780.000 10.00 2.50 25.25
0+790.000 10.00 2.49 24.95
0+800.000 10.00 2.47 24.80
0+810.000 10.00 2.47 24.70
0+820.000 10.00 2.47 24.70
0+830.000 10.00 2.47 24.70
0+840.000 10.00 2.47 24.70
0+850.000 10.00 2.47 24.70
0+860.000 10.00 2.47 24.70
0+870.000 10.00 2.47 24.70
0+880.000 10.00 2.47 24.70
0+890.000 10.00 2.47 24.70
0+900.000 10.00 2.47 24.70
0+910.000 10.00 2.47 24.70
0+920.000 10.00 2.47 24.70
0+930.000 10.00 2.47 24.70
0+940.000 10.00 2.47 24.70

Page 19
0+950.000 10.00 RELLENO2.47
BASE 24.70
0+960.000 10.00 2.47 24.70
0+970.000 10.00 2.47 24.70
0+980.000 10.00 2.47 24.70
0+990.000 10.00 2.47 24.70
PC 1+000.000 10.00 2.47 24.70
Vol. parcial (km 0 - km 1) 1,564.15

PC 1+000.000 2.47
1+010.000 10.00 2.47 24.70
1+020.000 10.00 2.47 24.70
1+030.000 10.00 2.47 24.70
1+040.000 10.00 2.47 24.70
1+050.000 10.00 2.47 24.70
1+060.000 10.00 2.47 24.70
1+070.000 10.00 2.47 24.70
1+080.000 10.00 2.47 24.70
1+090.000 10.00 2.47 24.70
1+100.000 10.00 2.47 24.70
1+110.000 10.00 2.47 24.70
PT 1+120.000 10.00 2.47 24.70
1+130.000 10.00 2.47 24.70
1+140.000 10.00 2.47 24.70
1+150.000 10.00 2.47 24.70
1+160.000 10.00 2.47 24.70
1+170.000 10.00 2.47 24.70
1+180.000 10.00 2.47 24.70
1+190.000 10.00 2.67 25.70
1+200.000 10.00 3.07 28.70
1+210.000 10.00 3.07 30.70
1+220.000 10.00 3.07 30.70
1+230.000 10.00 3.07 30.70
1+240.000 10.00 3.07 30.70
1+250.000 10.00 2.67 28.70
1+260.000 10.00 2.47 25.70
1+270.000 10.00 2.47 24.70
1+280.000 10.00 2.47 24.70
1+290.000 10.00 2.47 24.70
1+300.000 10.00 2.47 24.70
1+310.000 10.00 2.47 24.70
1+320.000 10.00 2.47 24.70
1+330.000 10.00 2.47 24.70
1+340.000 10.00 2.47 24.70
1+350.000 10.00 2.47 24.70
1+360.000 10.00 2.47 24.70
1+370.000 10.00 2.49 24.80
1+380.000 10.00 2.54 25.15
1+390.000 10.00 2.60 25.70
1+400.000 10.00 2.62 26.10
1+410.000 10.00 2.70 26.60
PC 1+420.000 10.00 2.69 26.95
1+430.000 10.00 2.69 26.90
1+440.000 10.00 2.69 26.90
1+450.000 10.00 2.69 26.90
1+460.000 10.00 2.69 26.90
1+470.000 10.00 2.69 26.90

Page 20
1+480.000 10.00 RELLENO2.69
BASE 26.90
1+490.000 10.00 2.69 26.90
1+500.000 10.00 2.69 26.90
1+510.000 10.00 2.69 26.90
1+520.000 10.00 2.69 26.90
1+530.000 10.00 2.69 26.90
PT 1+540.000 10.00 2.69 26.90
1+550.000 10.00 2.70 26.95
1+560.000 10.00 2.64 26.70
1+570.000 10.00 2.60 26.20
1+580.000 10.00 2.54 25.70
1+590.000 10.00 2.50 25.20
1+600.000 10.00 2.47 24.85
1+610.000 10.00 2.47 24.70
1+620.000 10.00 2.47 24.70
1+630.000 10.00 2.47 24.70
1+640.000 10.00 2.47 24.70
1+650.000 10.00 2.47 24.70
1+660.000 10.00 2.47 24.70
1+670.000 10.00 2.47 24.70
1+680.000 10.00 2.47 24.70
1+690.000 10.00 2.47 24.70
1+700.000 10.00 2.47 24.70
1+710.000 10.00 2.47 24.70
1+720.000 10.00 2.47 24.70
1+730.000 10.00 2.47 24.70
1+740.000 10.00 2.47 24.70
1+750.000 10.00 2.47 24.70
1+760.000 10.00 2.47 24.70
1+770.000 10.00 2.47 24.70
1+780.000 10.00 2.47 24.70
1+790.000 10.00 2.47 24.70
1+800.000 10.00 2.47 24.70
1+810.000 10.00 2.47 24.70
1+820.000 10.00 2.47 24.70
1+830.000 10.00 2.47 24.70
1+840.000 10.00 2.47 24.70
1+850.000 10.00 2.47 24.70
1+860.000 10.00 2.47 24.70
1+870.000 10.00 2.47 24.70
1+880.000 10.00 2.47 24.70
1+890.000 10.00 2.47 24.70
1+900.000 10.00 2.47 24.70
1+910.000 10.00 2.47 24.70
1+920.000 10.00 2.47 24.70
1+930.000 10.00 2.47 24.70
1+940.000 10.00 2.47 24.70
1+950.000 10.00 2.47 24.70
1+960.000 10.00 2.47 24.70
1+970.000 10.00 2.47 24.70
1+980.000 10.00 2.47 24.70
1+990.000 10.00 2.47 24.70
2+000.000 10.00 2.47 24.70
Volumen parcial (km 1 - km 2) 2,544.90

2+000.000 2.47

Page 21
2+010.000 10.00 RELLENO2.47
BASE 24.70
2+020.000 10.00 2.47 24.70
2+030.000 10.00 2.47 24.70
2+040.000 10.00 2.47 24.70
2+050.000 10.00 2.47 24.70
2+060.000 10.00 2.47 24.70
2+070.000 10.00 2.48 24.75
2+080.000 10.00 2.53 25.05
2+090.000 10.00 2.59 25.60
2+100.000 10.00 2.62 26.05
2+110.000 10.00 2.69 26.55
PC 2+120.000 10.00 2.69 26.90
2+130.000 10.00 2.69 26.90
2+140.000 10.00 2.69 26.90
2+150.000 10.00 2.69 26.90
2+160.000 10.00 2.69 26.90
2+170.000 10.00 2.69 26.90
2+180.000 10.00 2.69 26.90
2+190.000 10.00 2.69 26.90
2+200.000 10.00 2.69 26.90
PT 2+210.000 10.00 2.69 26.90
2+220.000 10.00 2.70 26.95
2+230.000 10.00 2.63 26.65
2+240.000 10.00 2.60 26.15
2+250.000 10.00 2.54 25.70
2+260.000 10.00 2.49 25.15
2+270.000 10.00 2.47 24.80
2+280.000 10.00 2.47 24.70
2+290.000 10.00 2.47 24.70
2+300.000 10.00 2.47 24.70
2+310.000 10.00 2.47 24.70
2+320.000 10.00 2.47 24.70
2+330.000 10.00 2.47 24.70
2+340.000 10.00 2.47 24.70
2+350.000 10.00 2.47 24.70
2+360.000 10.00 2.47 24.70
2+370.000 10.00 2.47 24.70
2+380.000 10.00 2.47 24.70
2+390.000 10.00 2.47 24.70
2+400.000 10.00 2.47 24.70
2+410.000 10.00 2.47 24.70
2+420.000 10.00 2.47 24.70
2+430.000 10.00 2.47 24.70
2+440.000 10.00 2.47 24.70
2+450.000 10.00 2.47 24.70
2+460.000 10.00 2.47 24.70
2+470.000 10.00 2.47 24.70
2+480.000 10.00 2.47 24.70
2+490.000 10.00 2.47 24.70
2+500.000 10.00 2.47 24.70
2+510.000 10.00 2.49 24.80
2+520.000 10.00 2.54 25.15
2+530.000 10.00 2.60 25.70
2+540.000 10.00 2.63 26.15
2+550.000 10.00 2.70 26.65
PC 2+560.000 10.00 2.69 26.95

Page 22
2+570.000 10.00 RELLENO2.69
BASE 26.90
2+580.000 10.00 2.69 26.90
2+590.000 10.00 2.69 26.90
2+600.000 10.00 2.69 26.90
PT 2+610.000 10.00 2.69 26.90
2+620.000 10.00 2.70 26.95
2+630.000 10.00 2.65 26.75
2+640.000 10.00 2.61 26.30
2+650.000 10.00 2.54 25.75
2+660.000 10.00 2.50 25.20
2+670.000 10.00 2.47 24.85
2+680.000 10.00 2.47 24.70
2+690.000 10.00 2.47 24.70
2+700.000 10.00 2.47 24.70
2+710.000 10.00 2.47 24.70
2+720.000 10.00 2.47 24.70
2+730.000 10.00 2.47 24.70
2+740.000 10.00 2.47 24.70
2+750.000 10.00 2.47 24.70
2+760.000 10.00 2.47 24.70
2+770.000 10.00 2.47 24.70
2+780.000 10.00 2.47 24.70
2+790.000 10.00 2.47 24.70
2+800.000 10.00 2.47 24.70
2+810.000 10.00 2.47 24.70
2+820.000 10.00 2.47 24.70
2+830.000 10.00 2.47 24.70
2+840.000 10.00 2.47 24.70
2+850.000 10.00 2.47 24.70
2+860.000 10.00 2.47 24.70
2+870.000 10.00 2.47 24.70
2+880.000 10.00 2.47 24.70
2+890.000 10.00 2.49 24.80
2+900.000 10.00 2.53 25.10
2+910.000 10.00 2.59 25.60
2+920.000 10.00 2.62 26.05
2+930.000 10.00 2.70 26.60
PC 2+940.000 10.00 2.69 26.95
2+950.000 10.00 2.69 26.90
2+960.000 10.00 2.69 26.90
2+970.000 10.00 2.69 26.90
2+980.000 10.00 2.69 26.90
2+990.000 10.00 2.69 26.90
3+000.000 10.00 2.69 26.90
Volumen parcial (km 2 - km 3) 2,549.60

3+000.000 2.69
3+010.000 10.00 2.69 26.90
PT 3+020.000 10.00 2.69 26.90
3+030.000 10.00 2.62 26.55
3+040.000 10.00 2.58 26.00
3+050.000 10.00 2.53 25.55
3+060.000 10.00 2.48 25.05
3+070.000 10.00 2.47 24.75
3+080.000 10.00 2.47 24.70
3+090.000 10.00 2.47 24.70

Page 23
3+100.000 10.00 RELLENO2.47
BASE 24.70
3+110.000 10.00 2.47 24.70
3+120.000 10.00 2.47 24.70
3+130.000 10.00 2.47 24.70
3+140.000 10.00 2.47 24.70
3+150.000 10.00 2.47 24.70
3+160.000 10.00 2.47 24.70
3+170.000 10.00 2.42 24.45
3+180.000 10.00 2.42 24.20
3+190.000 10.00 2.62 25.20
3+200.000 10.00 3.02 28.20
3+210.000 10.00 3.02 30.20
3+220.000 10.00 3.02 30.20
3+230.000 10.00 3.02 30.20
3+240.000 10.00 3.02 30.20
3+250.000 10.00 2.63 28.25
3+260.000 10.00 2.42 25.25
3+270.000 10.00 2.42 24.20
3+280.000 10.00 2.42 24.20
3+290.000 10.00 2.42 24.20
3+300.000 10.00 2.42 24.20
3+310.000 10.00 2.42 24.20
3+320.000 10.00 2.42 24.20
3+330.000 10.00 2.42 24.20
3+340.000 10.00 2.42 24.20
3+350.000 10.00 2.42 24.20
3+360.000 10.00 2.42 24.20
3+370.000 10.00 2.42 24.20
3+380.000 10.00 2.42 24.20
3+390.000 10.00 2.42 24.20
3+400.000 10.00 2.42 24.20
3+410.000 10.00 2.42 24.20
3+420.000 10.00 2.42 24.20
3+430.000 10.00 2.47 24.45
3+440.000 10.00 2.47 24.70
3+450.000 10.00 2.51 24.90
3+460.000 10.00 2.55 25.30
3+470.000 10.00 2.61 25.80
3+480.000 10.00 2.66 26.35
3+490.000 10.00 2.70 26.80
PC 3+500.000 10.00 2.69 26.95
3+510.000 10.00 2.69 26.90
3+520.000 10.00 2.69 26.90
3+530.000 10.00 2.69 26.90
PT 3+540.000 10.00 2.69 26.90
3+550.000 10.00 2.69 26.90
3+560.000 10.00 2.67 26.80
3+570.000 10.00 2.61 26.40
3+580.000 10.00 2.56 25.85
3+590.000 10.00 2.51 25.35
3+600.000 10.00 2.47 24.90
3+610.000 10.00 2.47 24.70
3+620.000 10.00 2.47 24.70
3+630.000 10.00 2.47 24.70
3+640.000 10.00 - -
3+650.000 10.00 - -

Page 24
3+660.000 10.00 RELLENO -BASE -
3+670.000 10.00 - -
3+680.000 10.00 2.47 -
3+690.000 10.00 2.47 24.70
3+700.000 10.00 2.47 24.70
3+710.000 10.00 2.47 24.70
3+720.000 10.00 2.47 24.70
3+730.000 10.00 2.47 24.70
3+740.000 10.00 2.47 24.70
3+750.000 10.00 2.47 24.70
3+760.000 10.00 2.47 24.70
3+770.000 10.00 2.47 24.70
3+780.000 10.00 2.47 24.70
3+790.000 10.00 2.47 24.70
3+800.000 10.00 2.47 24.70
3+810.000 10.00 2.47 24.70
3+820.000 10.00 2.47 24.70
3+830.000 10.00 2.47 24.70
3+840.000 10.00 2.47 24.70
3+850.000 10.00 2.47 24.70
3+860.000 10.00 2.47 24.70
3+870.000 10.00 2.47 24.70
3+880.000 10.00 2.47 24.70
3+890.000 10.00 2.47 24.70
3+900.000 10.00 2.47 24.70
3+910.000 10.00 2.47 24.70
3+920.000 10.00 2.48 24.75
3+930.000 10.00 2.53 25.05
3+940.000 10.00 2.59 25.60
3+950.000 10.00 2.62 26.05
3+960.000 10.00 2.69 26.55
PC 3+970.000 10.00 2.69 26.90
3+980.000 10.00 2.69 26.90
3+990.000 10.00 2.69 26.90
4+000.000 10.00 2.69 26.90
Volumen parcial (km 3 - km 4) 2,414.40

4+000.000 2.69
4+010.000 10.00 2.69 26.90
4+020.000 10.00 2.69 26.90
4+030.000 10.00 2.69 26.90
4+040.000 10.00 2.69 26.90
PT 4+050.000 10.00 2.69 26.90
4+060.000 10.00 2.68 26.85
4+070.000 10.00 2.62 26.50
4+080.000 10.00 2.57 25.95
4+090.000 10.00 2.52 25.45
4+100.000 10.00 2.47 24.95
4+110.000 10.00 2.47 24.70
4+120.000 10.00 2.47 24.70
4+130.000 10.00 2.47 24.70
4+140.000 10.00 2.47 24.70
4+150.000 10.00 2.47 24.70
4+160.000 10.00 2.47 24.70
4+170.000 10.00 2.47 24.70
4+180.000 10.00 2.47 24.70
4+190.000 10.00 2.47 24.70
4+200.000 10.00 2.47 24.70

Page 25
4+210.000 10.00 RELLENO2.47
BASE 24.70
4+220.000 10.00 2.47 24.70
4+230.000 10.00 2.47 24.70
4+240.000 10.00 2.47 24.70
4+250.000 10.00 2.47 24.70
4+260.000 10.00 2.47 24.70
4+270.000 10.00 2.47 24.70
4+280.000 10.00 2.47 24.70
4+290.000 10.00 2.47 24.70
4+300.000 10.00 2.47 24.70
4+310.000 10.00 2.47 24.70
4+320.000 10.00 2.47 24.70
4+330.000 10.00 2.47 24.70
4+340.000 10.00 2.47 24.70
4+350.000 10.00 2.47 24.70
4+360.000 10.00 2.47 24.70
4+370.000 10.00 2.47 24.70
4+380.000 10.00 2.47 24.70
4+390.000 10.00 2.47 24.70
4+400.000 10.00 2.47 24.70
4+410.000 10.00 2.47 24.70
4+420.000 10.00 2.47 24.70
4+430.000 10.00 2.47 24.70
4+440.000 10.00 2.47 24.70
4+450.000 10.00 2.47 24.70
4+460.000 10.00 2.47 24.70
4+470.000 10.00 2.47 24.70
4+480.000 10.00 2.47 24.70
4+490.000 10.00 2.47 24.70
4+500.000 10.00 2.47 24.70
4+510.000 10.00 2.47 24.70
4+520.000 10.00 2.50 24.85
4+530.000 10.00 2.54 25.20
4+540.000 10.00 2.57 25.55
4+550.000 10.00 2.62 25.95
4+560.000 10.00 2.63 26.25
PC 4+570.000 10.00 2.63 26.30
4+580.000 10.00 2.63 26.30
4+590.000 10.00 2.63 26.30
4+600.000 10.00 2.63 26.30
4+610.000 10.00 2.63 26.30
PT 4+620.000 10.00 2.63 26.30
4+630.000 10.00 2.62 26.25
4+640.000 10.00 2.57 25.95
4+650.000 10.00 2.55 25.60
4+660.000 10.00 2.51 25.30
4+670.000 10.00 2.47 24.90
4+680.000 10.00 2.47 24.70
4+690.000 10.00 2.47 24.70
4+700.000 10.00 2.47 24.70
4+710.000 10.00 2.47 24.70
4+720.000 10.00 2.47 24.70
4+730.000 10.00 2.47 24.70
4+740.000 10.00 2.47 24.70
4+750.000 10.00 2.47 24.70
4+760.000 10.00 2.47 24.70
4+770.000 10.00 2.47 24.70
4+780.000 10.00 2.47 24.70
4+790.000 10.00 2.47 24.70
4+800.000 10.00 2.47 24.70
4+810.000 10.00 2.47 24.70

Page 26
4+820.000 10.00 RELLENO2.47
BASE 24.70
4+830.000 10.00 2.47 24.70
4+840.000 10.00 2.47 24.70
4+850.000 10.00 2.47 24.70
4+860.000 10.00 2.47 24.70
4+870.000 10.00 2.47 24.70
4+880.000 10.00 2.47 24.70
4+890.000 10.00 2.47 24.70
4+900.000 10.00 2.47 24.70
4+910.000 10.00 2.47 24.70
4+920.000 10.00 2.47 24.70
4+930.000 10.00 2.47 24.70
4+940.000 10.00 2.47 24.70
4+950.000 10.00 - -
4+960.000 10.00 - -
4+970.000 10.00 - -
4+980.000 10.00 - -
4+990.000 10.00 - -
5+000.000 10.00 -
Volumen parcial (km 4 - km 5) 2,357.40

Page 27
BASE EXCEDENTE

SOCIEDAD MINERA CERRO VERDE S.A.A. AREQUIPA , PERU


PROYECTO :OBRAS DE MOVIMIENTO DE TIERRA, RELLENOS, PAVIMENTOS
A NIVEL DE BASE IMPRIMADA - CARRETERA AR 115
Unidad : m3
PROGRESIVAS : Km. 0+000 - Km. 5+000

PLANILLA DE METRADOS - BASE EXCEDENTE

rea Base Volumen Base


Distancia
Progresiva Excedente Excedente
(m)
(m2) (m3)

0+000.000 -
0+010.000 10.00 - -
0+020.000 10.00 - -
0+030.000 10.00 - -
0+040.000 10.00 - -
0+050.000 10.00 - -
0+060.000 10.00 - -
0+070.000 10.00 - -
0+080.000 10.00 - -
0+090.000 10.00 - -
0+100.000 10.00 - -
0+110.000 10.00 - -
0+120.000 10.00 - -
0+130.000 10.00 - -
0+140.000 10.00 - -
0+150.000 10.00 - -
0+160.000 10.00 - -
PC 0+170.000 10.00 - -
0+180.000 10.00 - -
0+190.000 10.00 - -
0+200.000 10.00 - -
0+210.000 10.00 - -
0+220.000 10.00 - -
0+230.000 10.00 - -
0+240.000 10.00 - -
0+250.000 10.00 - -
0+260.000 10.00 - -
0+270.000 10.00 - -
0+280.000 10.00 - -
0+290.000 10.00 - -
0+300.000 10.00 - -
0+310.000 10.00 - -
PT 0+320.000 10.00 - -
0+330.000 10.00 - -
0+340.000 10.00 - -
0+350.000 10.00 - -
0+360.000 10.00 - -
0+370.000 10.00 - -
0+380.000 10.00 - -

Page 28
0+390.000 10.00 BASE EXCEDENTE
- -
0+400.000 10.00 - -
0+410.000 10.00 - -
0+420.000 10.00 - -
0+430.000 10.00 - -
0+440.000 10.00 - -
0+450.000 10.00 - -
0+460.000 10.00 - -
0+470.000 10.00 - -
0+480.000 10.00 - -
0+490.000 10.00 - -
0+500.000 10.00 0.25 -
0+510.000 10.00 0.07 1.60
0+520.000 10.00 0.06 0.65
0+530.000 10.00 0.03 0.45
0+540.000 10.00 0.04 0.35
0+550.000 10.00 0.09 0.65
0+560.000 10.00 0.02 0.55
0+570.000 10.00 0.02 0.20
0+580.000 10.00 0.01 0.15
0+590.000 10.00 0.02 0.15
0+600.000 10.00 0.02 0.20
0+610.000 10.00 0.01 0.15
0+620.000 10.00 0.01 0.10
0+630.000 10.00 0.05 0.30
0+640.000 10.00 0.18 1.15
0+650.000 10.00 0.39 2.85
PC 0+660.000 10.00 - -
0+670.000 10.00 - -
0+680.000 10.00 - -
0+690.000 10.00 - -
0+700.000 10.00 - -
0+710.000 10.00 - -
0+720.000 10.00 - -
0+730.000 10.00 - -
0+740.000 10.00 - -
0+750.000 10.00 - -
0+760.000 10.00 - -
0+770.000 10.00 - -
PT 0+780.000 10.00 - -
0+790.000 10.00 0.43 -
0+800.000 10.00 0.27 3.50
0+810.000 10.00 0.17 2.20
0+820.000 10.00 0.05 1.10
0+830.000 10.00 0.04 0.45
0+840.000 10.00 0.02 0.30
0+850.000 10.00 0.01 0.15
0+860.000 10.00 0.02 0.15
0+870.000 10.00 0.05 0.35
0+880.000 10.00 0.04 0.45
0+890.000 10.00 0.05 0.45
0+900.000 10.00 0.07 0.60
0+910.000 10.00 0.04 0.55
0+920.000 10.00 0.06 0.50
0+930.000 10.00 0.10 0.80
0+940.000 10.00 0.10 1.00

Page 29
0+950.000 10.00 BASE EXCEDENTE
0.05 0.75
0+960.000 10.00 0.04 0.45
0+970.000 10.00 0.05 0.45
0+980.000 10.00 0.17 1.10
0+990.000 10.00 0.34 2.55
PC 1+000.000 10.00 - -
Vol. parcial (km 0 - km 1) 27.35

PC 1+000.000 -
1+010.000 10.00 - -
1+020.000 10.00 - -
1+030.000 10.00 - -
1+040.000 10.00 - -
1+050.000 10.00 - -
1+060.000 10.00 - -
1+070.000 10.00 - -
1+080.000 10.00 - -
1+090.000 10.00 - -
1+100.000 10.00 - -
1+110.000 10.00 - -
PT 1+120.000 10.00 - -
1+130.000 10.00 0.41 -
1+140.000 10.00 0.23 3.20
1+150.000 10.00 0.19 2.10
1+160.000 10.00 0.26 2.25
1+170.000 10.00 0.29 2.75
1+180.000 10.00 0.23 2.60
1+190.000 10.00 0.31 2.70
1+200.000 10.00 0.15 2.30
1+210.000 10.00 0.07 1.10
1+220.000 10.00 0.20 1.35
1+230.000 10.00 0.17 1.85
1+240.000 10.00 0.07 1.20
1+250.000 10.00 0.16 1.15
1+260.000 10.00 0.19 1.75
1+270.000 10.00 0.13 1.60
1+280.000 10.00 0.13 1.30
1+290.000 10.00 0.19 1.60
1+300.000 10.00 0.16 1.75
1+310.000 10.00 0.25 2.05
1+320.000 10.00 0.24 2.45
1+330.000 10.00 0.17 2.05
1+340.000 10.00 0.33 2.50
1+350.000 10.00 0.43 3.80
1+360.000 10.00 0.63 5.30
1+370.000 10.00 0.78 7.05
1+380.000 10.00 0.79 7.85
1+390.000 10.00 0.83 8.10
1+400.000 10.00 0.94 8.85
1+410.000 10.00 0.98 9.60
PC 1+420.000 10.00 - -
1+430.000 10.00 - -
1+440.000 10.00 - -
1+450.000 10.00 - -
1+460.000 10.00 - -
1+470.000 10.00 - -

Page 30
1+480.000 10.00 BASE EXCEDENTE
- -
1+490.000 10.00 - -
1+500.000 10.00 - -
1+510.000 10.00 - -
1+520.000 10.00 - -
1+530.000 10.00 - -
PT 1+540.000 10.00 - -
1+550.000 10.00 1.10 -
1+560.000 10.00 1.03 10.65
1+570.000 10.00 0.93 9.80
1+580.000 10.00 0.80 8.65
1+590.000 10.00 0.78 7.90
1+600.000 10.00 0.72 7.50
1+610.000 10.00 0.65 6.85
1+620.000 10.00 0.23 4.40
1+630.000 10.00 0.14 1.85
1+640.000 10.00 0.11 1.25
1+650.000 10.00 0.05 0.80
1+660.000 10.00 0.13 0.90
1+670.000 10.00 0.10 1.15
1+680.000 10.00 0.17 1.35
1+690.000 10.00 0.18 1.75
1+700.000 10.00 0.26 2.20
1+710.000 10.00 0.06 1.60
1+720.000 10.00 0.04 0.50
1+730.000 10.00 0.09 0.65
1+740.000 10.00 0.12 1.05
1+750.000 10.00 0.09 1.05
1+760.000 10.00 0.13 1.10
1+770.000 10.00 0.04 0.85
1+780.000 10.00 0.10 0.70
1+790.000 10.00 0.09 0.95
1+800.000 10.00 0.14 1.15
1+810.000 10.00 0.04 0.90
1+820.000 10.00 0.06 0.50
1+830.000 10.00 0.08 0.70
1+840.000 10.00 0.02 0.50
1+850.000 10.00 0.02 0.20
1+860.000 10.00 0.04 0.30
1+870.000 10.00 0.01 0.25
1+880.000 10.00 - -
1+890.000 10.00 0.04 -
1+900.000 10.00 0.01 0.25
1+910.000 10.00 0.01 0.10
1+920.000 10.00 0.07 0.40
1+930.000 10.00 0.06 0.65
1+940.000 10.00 - -
1+950.000 10.00 0.07 -
1+960.000 10.00 0.06 0.65
1+970.000 10.00 0.02 0.40
1+980.000 10.00 0.04 0.30
1+990.000 10.00 0.06 0.50
2+000.000 10.00 0.06 0.60
Volumen parcial (km 1 - km 2) 175.95

2+000.000 0.06

Page 31
2+010.000 10.00 BASE EXCEDENTE
0.04 0.50
2+020.000 10.00 - -
2+030.000 10.00 0.01 -
2+040.000 10.00 0.03 0.20
2+050.000 10.00 0.15 0.90
2+060.000 10.00 0.36 2.55
2+070.000 10.00 0.41 3.85
2+080.000 10.00 0.39 4.00
2+090.000 10.00 0.46 4.25
2+100.000 10.00 0.54 5.00
2+110.000 10.00 0.65 5.95
PC 2+120.000 10.00 - -
2+130.000 10.00 - -
2+140.000 10.00 - -
2+150.000 10.00 - -
2+160.000 10.00 - -
2+170.000 10.00 - -
2+180.000 10.00 - -
2+190.000 10.00 - -
2+200.000 10.00 - -
PT 2+210.000 10.00 - -
2+220.000 10.00 0.68 -
2+230.000 10.00 0.58 6.30
2+240.000 10.00 0.55 5.65
2+250.000 10.00 0.41 4.80
2+260.000 10.00 0.50 4.55
2+270.000 10.00 0.41 4.55
2+280.000 10.00 0.26 3.35
2+290.000 10.00 0.14 2.00
2+300.000 10.00 0.03 0.85
2+310.000 10.00 0.02 0.25
2+320.000 10.00 - -
2+330.000 10.00 0.01 -
2+340.000 10.00 0.01 0.10
2+350.000 10.00 0.01 0.10
2+360.000 10.00 0.03 0.20
2+370.000 10.00 0.02 0.25
2+380.000 10.00 0.07 0.45
2+390.000 10.00 0.02 0.45
2+400.000 10.00 0.01 0.15
2+410.000 10.00 0.03 0.20
2+420.000 10.00 0.01 0.20
2+430.000 10.00 0.08 0.45
2+440.000 10.00 0.02 0.50
2+450.000 10.00 0.03 0.25
2+460.000 10.00 0.02 0.25
2+470.000 10.00 - -
2+480.000 10.00 0.07 -
2+490.000 10.00 0.22 1.45
2+500.000 10.00 0.42 3.20
2+510.000 10.00 0.37 3.95
2+520.000 10.00 0.37 3.70
2+530.000 10.00 0.46 4.15
2+540.000 10.00 0.51 4.85
2+550.000 10.00 0.67 5.90
PC 2+560.000 10.00 - -

Page 32
2+570.000 10.00 BASE EXCEDENTE
- -
2+580.000 10.00 - -
2+590.000 10.00 - -
2+600.000 10.00 - -
PT 2+610.000 10.00 - -
2+620.000 10.00 0.64 -
2+630.000 10.00 0.55 5.95
2+640.000 10.00 0.46 5.05
2+650.000 10.00 0.40 4.30
2+660.000 10.00 0.37 3.85
2+670.000 10.00 0.33 3.50
2+680.000 10.00 0.32 3.25
2+690.000 10.00 0.22 2.70
2+700.000 10.00 0.01 1.15
2+710.000 10.00 0.01 0.10
2+720.000 10.00 0.01 0.10
2+730.000 10.00 0.03 0.20
2+740.000 10.00 0.02 0.25
2+750.000 10.00 0.02 0.20
2+760.000 10.00 0.04 0.30
2+770.000 10.00 0.03 0.35
2+780.000 10.00 0.05 0.40
2+790.000 10.00 0.04 0.45
2+800.000 10.00 0.01 0.25
2+810.000 10.00 0.03 0.20
2+820.000 10.00 0.01 0.20
2+830.000 10.00 - -
2+840.000 10.00 0.02 0.05
2+850.000 10.00 - -
2+860.000 10.00 0.04 -
2+870.000 10.00 0.08 0.60
2+880.000 10.00 0.29 1.85
2+890.000 10.00 0.34 3.15
2+900.000 10.00 0.34 3.40
2+910.000 10.00 0.43 3.85
2+920.000 10.00 0.52 4.75
2+930.000 10.00 0.60 5.60
PC 2+940.000 10.00 - -
2+950.000 10.00 - -
2+960.000 10.00 - -
2+970.000 10.00 - -
2+980.000 10.00 - -
2+990.000 10.00 - -
3+000.000 10.00 - -
Volumen parcial (km 2 - km 3) 146.25

3+000.000 -
3+010.000 10.00 - -
PT 3+020.000 10.00 - -
3+030.000 10.00 0.57 -
3+040.000 10.00 0.51 5.40
3+050.000 10.00 0.45 4.80
3+060.000 10.00 0.42 4.35
3+070.000 10.00 0.36 3.90
3+080.000 10.00 0.34 3.50
3+090.000 10.00 0.23 2.85

Page 33
3+100.000 10.00 BASE EXCEDENTE
0.05 1.40
3+110.000 10.00 - -
3+120.000 10.00 0.01
3+130.000 10.00 - 0.03
3+140.000 10.00 0.01 -
3+150.000 10.00 - 0.03
3+160.000 10.00 - -
3+170.000 10.00 - -
3+180.000 10.00 - -
3+190.000 10.00 - -
3+200.000 10.00 0.01 -
3+210.000 10.00 0.02 0.15
3+220.000 10.00 - -
3+230.000 10.00 0.01 -
3+240.000 10.00 0.03 0.20
3+250.000 10.00 0.02 0.25
3+260.000 10.00 0.01 0.15
3+270.000 10.00 0.03 0.20
3+280.000 10.00 0.04 0.35
3+290.000 10.00 0.02 0.30
3+300.000 10.00 0.03 0.25
3+310.000 10.00 0.01 0.20
3+320.000 10.00 0.01 0.10
3+330.000 10.00 0.03 0.20
3+340.000 10.00 0.01 0.20
3+350.000 10.00 0.03 0.20
3+360.000 10.00 - -
3+370.000 10.00 - -
3+380.000 10.00 - -
3+390.000 10.00 0.03 0.08
3+400.000 10.00 - -
3+410.000 10.00 0.01 -
3+420.000 10.00 0.13 0.70
3+430.000 10.00 0.31 2.20
3+440.000 10.00 0.45 3.80
3+450.000 10.00 0.37 4.10
3+460.000 10.00 0.45 4.10
3+470.000 10.00 0.48 4.65
3+480.000 10.00 0.53 5.05
3+490.000 10.00 0.70 6.15
PC 3+500.000 10.00 - -
3+510.000 10.00 - -
3+520.000 10.00 - -
3+530.000 10.00 - -
PT 3+540.000 10.00 - -
3+550.000 10.00 0.66 -
3+560.000 10.00 0.61 6.35
3+570.000 10.00 0.52 5.65
3+580.000 10.00 0.43 4.75
3+590.000 10.00 0.45 4.40
3+600.000 10.00 0.44 4.45
3+610.000 10.00 0.39 4.15
3+620.000 10.00 0.13 2.60
3+630.000 10.00 0.04 0.85
3+640.000 10.00 - -
3+650.000 10.00 - -

Page 34
3+660.000 10.00 BASE EXCEDENTE
- -
3+670.000 10.00 - -
3+680.000 10.00 0.06 -
3+690.000 10.00 0.05 0.55
3+700.000 10.00 0.07 0.60
3+710.000 10.00 0.01 0.40
3+720.000 10.00 0.01 0.10
3+730.000 10.00 0.06 0.35
3+740.000 10.00 0.05 0.55
3+750.000 10.00 0.03 0.40
3+760.000 10.00 0.07 0.50
3+770.000 10.00 0.05 0.60
3+780.000 10.00 0.07 0.60
3+790.000 10.00 0.06 0.65
3+800.000 10.00 0.03 0.45
3+810.000 10.00 0.03 0.30
3+820.000 10.00 0.09 0.60
3+830.000 10.00 0.03 0.60
3+840.000 10.00 0.06 0.45
3+850.000 10.00 0.09 0.75
3+860.000 10.00 0.14 1.15
3+870.000 10.00 0.04 0.90
3+880.000 10.00 0.03 0.35
3+890.000 10.00 0.01 0.20
3+900.000 10.00 0.12 0.65
3+910.000 10.00 0.41 2.65
3+920.000 10.00 0.44 4.25
3+930.000 10.00 0.43 4.35
3+940.000 10.00 0.49 4.60
3+950.000 10.00 0.55 5.20
3+960.000 10.00 0.64 5.95
PC 3+970.000 10.00 - -
3+980.000 10.00 - -
3+990.000 10.00 - -
4+000.000 10.00 - -
Volumen parcial (km 3 - km 4) 131.73

4+000.000 -
4+010.000 10.00 - -
4+020.000 10.00 - -
4+030.000 10.00 - -
4+040.000 10.00 - -
PT 4+050.000 10.00 - -
4+060.000 10.00 0.57 -
4+070.000 10.00 0.49 5.30
4+080.000 10.00 0.40 4.45
4+090.000 10.00 0.35 3.75
4+100.000 10.00 0.36 3.55
4+110.000 10.00 0.29 3.25
4+120.000 10.00 0.28 2.85
4+130.000 10.00 0.05 1.65
4+140.000 10.00 0.01 0.30
4+150.000 10.00 0.04 0.25
4+160.000 10.00 - -
4+170.000 10.00 0.04 0.10
4+180.000 10.00 - -
4+190.000 10.00 0.02 0.05
4+200.000 10.00 - -

Page 35
4+210.000 10.00 BASE EXCEDENTE
- -
4+220.000 10.00 0.02 0.05
4+230.000 10.00 - -
4+240.000 10.00 0.43 1.08
4+250.000 10.00 0.01 2.20
4+260.000 10.00 0.02 0.15
4+270.000 10.00 - -
4+280.000 10.00 0.01 -
4+290.000 10.00 0.02 0.15
4+300.000 10.00 0.03 0.25
4+310.000 10.00 0.03 0.30
4+320.000 10.00 0.01 0.20
4+330.000 10.00 0.09 0.50
4+340.000 10.00 0.03 0.60
4+350.000 10.00 0.09 0.60
4+360.000 10.00 0.05 0.70
4+370.000 10.00 0.08 0.65
4+380.000 10.00 0.05 0.65
4+390.000 10.00 0.04 0.45
4+400.000 10.00 0.07 0.55
4+410.000 10.00 0.06 0.65
4+420.000 10.00 0.07 0.65
4+430.000 10.00 0.12 0.95
4+440.000 10.00 - -
4+450.000 10.00 0.03 0.08
4+460.000 10.00 - -
4+470.000 10.00 0.04 -
4+480.000 10.00 0.01 0.25
4+490.000 10.00 - -
4+500.000 10.00 0.01 -
4+510.000 10.00 0.02 0.15
4+520.000 10.00 0.01 0.15
4+530.000 10.00 0.02 0.15
4+540.000 10.00 0.01 0.15
4+550.000 10.00 - -
4+560.000 10.00 - -
PC 4+570.000 10.00 - -
4+580.000 10.00 - -
4+590.000 10.00 - -
4+600.000 10.00 - -
4+610.000 10.00 - -
PT 4+620.000 10.00 - -
4+630.000 10.00 0.02 -
4+640.000 10.00 0.06 0.40
4+650.000 10.00 - -
4+660.000 10.00 0.03 -
4+670.000 10.00 0.03 0.30
4+680.000 10.00 - -
4+690.000 10.00 0.07 -
4+700.000 10.00 0.07 0.70
4+710.000 10.00 0.04 0.55
4+720.000 10.00 0.12 0.80
4+730.000 10.00 0.02 0.70
4+740.000 10.00 0.01 0.15
4+750.000 10.00 0.04 0.25
4+760.000 10.00 0.06 0.50
4+770.000 10.00 0.09 0.75
4+780.000 10.00 0.11 1.00
4+790.000 10.00 0.04 0.75
4+800.000 10.00 0.19 1.15
4+810.000 10.00 0.06 1.25

Page 36
4+820.000 10.00 BASE EXCEDENTE
0.08 0.70
4+830.000 10.00 0.07 0.75
4+840.000 10.00 0.09 0.80
4+850.000 10.00 0.01 0.50
4+860.000 10.00 0.04 0.25
4+870.000 10.00 0.04 0.40
4+880.000 10.00 0.09 0.65
4+890.000 10.00 0.08 0.85
4+900.000 10.00 0.08 0.80
4+910.000 10.00 0.04 0.60
4+920.000 10.00 0.04 0.40
4+930.000 10.00 0.06 0.50
4+940.000 10.00 0.13 0.95
4+950.000 10.00 - -
4+960.000 10.00 - -
4+970.000 10.00 - -
4+980.000 10.00 - -
4+990.000 10.00 - -
5+000.000 10.00 - -
Volumen parcial (km 4 - km 5) 55.15

Page 37
BASE CORTE-RELLENO

SOCIEDAD MINERA CERRO VERDE S.A.A. AREQUIPA , PERU


PROYECTO :OBRAS DE MOVIMIENTO DE TIERRA, RELLENOS, PAVIMENTOS
A NIVEL DE BASE IMPRIMADA - CARRETERA AR 115
Unidad : m3
PROGRESIVAS : Km. 0+000 - Km. 5+000
PLANILLA DE METRADOS - BASE CORTE-RELLENO

rea de Volumen
rea Corte Volumen Mat.
Distancia Conformacin Conformacin
Progresiva Mat. Suelto Suelto
(m) de Terraplen de Terraplen
(m2) (m3)
(m2) (m3)
0+000.000 - -
0+010.000 10.00 - - - -
0+020.000 10.00 - - - -
0+030.000 10.00 - - - -
0+040.000 10.00 - - - -
0+050.000 10.00 - - - -
0+060.000 10.00 - - - -
0+070.000 10.00 - - - -
0+080.000 10.00 - - - -
0+090.000 10.00 - - - -
0+100.000 10.00 - - - -
0+110.000 10.00 - - - -
0+120.000 10.00 - - - -
0+130.000 10.00 - - - -
0+140.000 10.00 - - - -
0+150.000 10.00 - - - -
0+160.000 10.00 - - - -
PC 0+170.000 10.00 - - - -
0+180.000 10.00 - - - -
0+190.000 10.00 - - - -
0+200.000 10.00 - - - -
0+210.000 10.00 - - - -
0+220.000 10.00 - - - -
0+230.000 10.00 - - - -
0+240.000 10.00 - - - -
0+250.000 10.00 - - - -
0+260.000 10.00 - - - -
0+270.000 10.00 - - - -
0+280.000 10.00 - - - -
0+290.000 10.00 - - - -
0+300.000 10.00 - - - -
0+310.000 10.00 - - - -
PT 0+320.000 10.00 - - - -
0+330.000 10.00 - - - -
0+340.000 10.00 - - - -
0+350.000 10.00 - - - -
0+360.000 10.00 - - - -
0+370.000 10.00 - - - -
0+380.000 10.00 - - - -
0+390.000 10.00 - - - -
0+400.000 10.00 - - - -
0+410.000 10.00 - - - -
0+420.000 10.00 - - - -
0+430.000 10.00 - - - -
0+440.000 10.00 - - - -
0+450.000 10.00 - - - -

Page 38
0+460.000 10.00 BASE CORTE-RELLENO
- - - -
0+470.000 10.00 - - - -
0+480.000 10.00 - - - -
0+490.000 10.00 - - - -
0+500.000 10.00 - - - -
0+510.000 10.00 - - - -
0+520.000 10.00 - - - -
0+530.000 10.00 - - - -
0+540.000 10.00 - - - -
0+550.000 10.00 - - - -
0+560.000 10.00 - - - -
0+570.000 10.00 - - - -
0+580.000 10.00 - - - -
0+590.000 10.00 - - - -
0+600.000 10.00 - - - -
0+610.000 10.00 - - - -
0+620.000 10.00 - - - -
0+630.000 10.00 - - - -
0+640.000 10.00 - - - -
0+650.000 10.00 - - - -
PC 0+660.000 10.00 0.47 - - -
0+670.000 10.00 0.44 0.01 4.55 -
0+680.000 10.00 0.47 - 4.55 0.03
0+690.000 10.00 0.47 - 4.70 -
0+700.000 10.00 0.57 - 5.20 -
0+710.000 10.00 0.55 - 5.60 -
0+720.000 10.00 0.45 - 5.00 -
0+730.000 10.00 0.42 0.02 4.35 -
0+740.000 10.00 0.46 - 4.40 0.05
0+750.000 10.00 0.46 - 4.60 -
0+760.000 10.00 0.44 - 4.50 -
0+770.000 10.00 0.46 - 4.50 -
PT 0+780.000 10.00 0.49 - 4.75 -
0+790.000 10.00 - - - -
0+800.000 10.00 - - - -
0+810.000 10.00 - - - -
0+820.000 10.00 - - - -
0+830.000 10.00 - - - -
0+840.000 10.00 - - - -
0+850.000 10.00 - - - -
0+860.000 10.00 - - - -
0+870.000 10.00 - - - -
0+880.000 10.00 - - - -
0+890.000 10.00 - - - -
0+900.000 10.00 - - - -
0+910.000 10.00 - - - -
0+920.000 10.00 - - - -
0+930.000 10.00 - - - -
0+940.000 10.00 - - - -
0+950.000 10.00 - - - -
0+960.000 10.00 - - - -
0+970.000 10.00 - - - -
0+980.000 10.00 - - - -
0+990.000 10.00 - - - -
PC 1+000.000 10.00 0.46 - - -
Vol. parcial (km 0 - km 1) 56.70 0.08

PC 1+000.000 0.46 -
1+010.000 10.00 0.33 - 3.95 -
1+020.000 10.00 0.45 - 3.90 -
1+030.000 10.00 0.51 - 4.80 -
1+040.000 10.00 0.37 - 4.40 -
1+050.000 10.00 0.46 - 4.15 -
1+060.000 10.00 0.44 - 4.50 -

Page 39
1+070.000 10.00 BASE CORTE-RELLENO
0.44 0.01 4.40 -
1+080.000 10.00 0.43 - 4.35 0.03
1+090.000 10.00 0.42 - 4.25 -
1+100.000 10.00 0.39 - 4.05 -
1+110.000 10.00 0.37 - 3.80 -
PT 1+120.000 10.00 0.45 - 4.10 -
1+130.000 10.00 - - - -
1+140.000 10.00 - - - -
1+150.000 10.00 - - - -
1+160.000 10.00 - - - -
1+170.000 10.00 - - - -
1+180.000 10.00 - - - -
1+190.000 10.00 - - - -
1+200.000 10.00 - - - -
1+210.000 10.00 - - - -
1+220.000 10.00 - - - -
1+230.000 10.00 - - - -
1+240.000 10.00 - - - -
1+250.000 10.00 - - - -
1+260.000 10.00 - - - -
1+270.000 10.00 - - - -
1+280.000 10.00 - - - -
1+290.000 10.00 - - - -
1+300.000 10.00 - - - -
1+310.000 10.00 - - - -
1+320.000 10.00 - - - -
1+330.000 10.00 - - - -
1+340.000 10.00 - - - -
1+350.000 10.00 - - - -
1+360.000 10.00 - - - -
1+370.000 10.00 - - - -
1+380.000 10.00 - - - -
1+390.000 10.00 - - - -
1+400.000 10.00 - - - -
1+410.000 10.00 - - - -
PC 1+420.000 10.00 1.19 0.37 - -
1+430.000 10.00 1.12 0.36 11.55 3.65
1+440.000 10.00 1.12 0.32 11.20 3.40
1+450.000 10.00 1.18 0.33 11.50 3.25
1+460.000 10.00 1.17 0.40 11.75 3.65
1+470.000 10.00 1.22 0.38 11.95 3.90
1+480.000 10.00 1.18 0.38 12.00 3.80
1+490.000 10.00 1.19 0.43 11.85 4.05
1+500.000 10.00 1.20 0.40 11.95 4.15
1+510.000 10.00 1.38 0.36 12.90 3.80
1+520.000 10.00 1.27 0.31 13.25 3.35
1+530.000 10.00 1.05 0.35 11.60 3.30
PT 1+540.000 10.00 1.16 0.37 11.05 3.60
1+550.000 10.00 - - - -
1+560.000 10.00 - - - -
1+570.000 10.00 - - - -
1+580.000 10.00 - - - -
1+590.000 10.00 - - - -
1+600.000 10.00 - - - -
1+610.000 10.00 - - - -
1+620.000 10.00 - - - -
1+630.000 10.00 - - - -
1+640.000 10.00 - - - -
1+650.000 10.00 - - - -
1+660.000 10.00 - - - -
1+670.000 10.00 - - - -
1+680.000 10.00 - - - -
1+690.000 10.00 - - - -

Page 40
1+700.000 10.00 BASE CORTE-RELLENO
- - - -
1+710.000 10.00 - - - -
1+720.000 10.00 - - - -
1+730.000 10.00 - - - -
1+740.000 10.00 - - - -
1+750.000 10.00 - - - -
1+760.000 10.00 - - - -
1+770.000 10.00 - - - -
1+780.000 10.00 - - - -
1+790.000 10.00 - - - -
1+800.000 10.00 - - - -
1+810.000 10.00 - - - -
1+820.000 10.00 - - - -
1+830.000 10.00 - - - -
1+840.000 10.00 - - - -
1+850.000 10.00 - - - -
1+860.000 10.00 - - - -
1+870.000 10.00 - - - -
1+880.000 10.00 - - - -
1+890.000 10.00 - - - -
1+900.000 10.00 - - - -
1+910.000 10.00 - - - -
1+920.000 10.00 - - - -
1+930.000 10.00 - - - -
1+940.000 10.00 - - - -
1+950.000 10.00 - - - -
1+960.000 10.00 - - - -
1+970.000 10.00 - - - -
1+980.000 10.00 - - - -
1+990.000 10.00 - - - -
2+000.000 10.00 - - - -
Volumen parcial (km 1 - km 2) 193.20 43.93

2+000.000 - -
2+010.000 10.00 - - - -
2+020.000 10.00 - - - -
2+030.000 10.00 - - - -
2+040.000 10.00 - - - -
2+050.000 10.00 - - - -
2+060.000 10.00 - - - -
2+070.000 10.00 - - - -
2+080.000 10.00 - - - -
2+090.000 10.00 - - - -
2+100.000 10.00 - - - -
2+110.000 10.00 - - - -
PC 2+120.000 10.00 0.72 0.22 - -
2+130.000 10.00 0.69 0.24 7.05 2.30
2+140.000 10.00 0.71 0.23 7.00 2.35
2+150.000 10.00 0.68 0.18 6.95 2.05
2+160.000 10.00 0.69 0.24 6.85 2.10
2+170.000 10.00 0.66 0.20 6.75 2.20
2+180.000 10.00 0.68 0.21 6.70 2.05
2+190.000 10.00 0.64 0.21 6.60 2.10
2+200.000 10.00 0.68 0.23 6.60 2.20
PT 2+210.000 10.00 0.70 0.21 6.90 2.20
2+220.000 10.00 - - - -
2+230.000 10.00 - - - -
2+240.000 10.00 - - - -
2+250.000 10.00 - - - -
2+260.000 10.00 - - - -
2+270.000 10.00 - - - -
2+280.000 10.00 - - - -
2+290.000 10.00 - - - -
2+300.000 10.00 - - - -

Page 41
2+310.000 10.00 BASE CORTE-RELLENO
- - - -
2+320.000 10.00 - - - -
2+330.000 10.00 - - - -
2+340.000 10.00 - - - -
2+350.000 10.00 - - - -
2+360.000 10.00 - - - -
2+370.000 10.00 - - - -
2+380.000 10.00 - - - -
2+390.000 10.00 - - - -
2+400.000 10.00 - - - -
2+410.000 10.00 - - - -
2+420.000 10.00 - - - -
2+430.000 10.00 - - - -
2+440.000 10.00 - - - -
2+450.000 10.00 - - - -
2+460.000 10.00 - - - -
2+470.000 10.00 - - - -
2+480.000 10.00 - - - -
2+490.000 10.00 - - - -
2+500.000 10.00 - - - -
2+510.000 10.00 - - - -
2+520.000 10.00 - - - -
2+530.000 10.00 - - - -
2+540.000 10.00 - - - -
2+550.000 10.00 - - - -
PC 2+560.000 10.00 0.68 0.22 - -
2+570.000 10.00 0.69 0.25 6.85 2.35
2+580.000 10.00 0.70 0.27 6.95 2.60
2+590.000 10.00 0.69 0.26 6.95 2.65
2+600.000 10.00 0.67 0.27 6.80 2.65
PT 2+610.000 10.00 0.68 0.28 6.75 2.75
2+620.000 10.00 - - - -
2+630.000 10.00 - - - -
2+640.000 10.00 - - - -
2+650.000 10.00 - - - -
2+660.000 10.00 - - - -
2+670.000 10.00 - - - -
2+680.000 10.00 - - - -
2+690.000 10.00 - - - -
2+700.000 10.00 - - - -
2+710.000 10.00 - - - -
2+720.000 10.00 - - - -
2+730.000 10.00 - - - -
2+740.000 10.00 - - - -
2+750.000 10.00 - - - -
2+760.000 10.00 - - - -
2+770.000 10.00 - - - -
2+780.000 10.00 - - - -
2+790.000 10.00 - - - -
2+800.000 10.00 - - - -
2+810.000 10.00 - - - -
2+820.000 10.00 - - - -
2+830.000 10.00 - - - -
2+840.000 10.00 - - - -
2+850.000 10.00 - - - -
2+860.000 10.00 - - - -
2+870.000 10.00 - - - -
2+880.000 10.00 - - - -
2+890.000 10.00 - - - -
2+900.000 10.00 - - - -
2+910.000 10.00 - - - -
2+920.000 10.00 - - - -
2+930.000 10.00 - - - -

Page 42
PC 2+940.000 10.00 BASE CORTE-RELLENO
0.66 0.28 - -
2+950.000 10.00 0.68 0.23 6.70 2.55
2+960.000 10.00 0.65 0.26 6.65 2.45
2+970.000 10.00 0.63 0.23 6.40 2.45
2+980.000 10.00 0.63 0.27 6.30 2.50
2+990.000 10.00 0.67 0.25 6.50 2.60
3+000.000 10.00 0.68 0.27 6.75 2.60
Volumen parcial (km 2 - km 3) 135.00 47.70

3+000.000 0.68 0.27


3+010.000 10.00 0.66 0.25 6.70 2.60
PT 3+020.000 10.00 0.69 0.23 6.75 2.40
3+030.000 10.00 - - - -
3+040.000 10.00 - - - -
3+050.000 10.00 - - - -
3+060.000 10.00 - - - -
3+070.000 10.00 - - - -
3+080.000 10.00 - - - -
3+090.000 10.00 - - - -
3+100.000 10.00 - - - -
3+110.000 10.00 - - - -
3+120.000 10.00 - - - -
3+130.000 10.00 - - - -
3+140.000 10.00 - - - -
3+150.000 10.00 - - - -
3+160.000 10.00 - - - -
3+170.000 10.00 - - - -
3+180.000 10.00 - - - -
3+190.000 10.00 - - - -
3+200.000 10.00 - - - -
3+210.000 10.00 - - - -
3+220.000 10.00 - - - -
3+230.000 10.00 - - - -
3+240.000 10.00 - - - -
3+250.000 10.00 - - - -
3+260.000 10.00 - - - -
3+270.000 10.00 - - - -
3+280.000 10.00 - - - -
3+290.000 10.00 - - - -
3+300.000 10.00 - - - -
3+310.000 10.00 - - - -
3+320.000 10.00 - - - -
3+330.000 10.00 - - - -
3+340.000 10.00 - - - -
3+350.000 10.00 - - - -
3+360.000 10.00 - - - -
3+370.000 10.00 - - - -
3+380.000 10.00 - - - -
3+390.000 10.00 - - - -
3+400.000 10.00 - - - -
3+410.000 10.00 - - - -
3+420.000 10.00 - - - -
3+430.000 10.00 - - - -
3+440.000 10.00 - - - -
3+450.000 10.00 - - - -
3+460.000 10.00 - - - -
3+470.000 10.00 - - - -
3+480.000 10.00 - - - -
3+490.000 10.00 - - - -
PC 3+500.000 10.00 0.70 0.20 - -
3+510.000 10.00 0.68 0.20 6.90 2.00
3+520.000 10.00 0.74 0.23 7.10 2.15
3+530.000 10.00 0.68 0.21 7.10 2.20
PT 3+540.000 10.00 0.72 0.21 7.00 2.10

Page 43
3+550.000 10.00 BASE CORTE-RELLENO
- - - -
3+560.000 10.00 - - - -
3+570.000 10.00 - - - -
3+580.000 10.00 - - - -
3+590.000 10.00 - - - -
3+600.000 10.00 - - - -
3+610.000 10.00 - - - -
3+620.000 10.00 - - - -
3+630.000 10.00 - - - -
3+640.000 10.00 - - - -
3+650.000 10.00 - - - -
3+660.000 10.00 - - - -
3+670.000 10.00 - - - -
3+680.000 10.00 - - - -
3+690.000 10.00 - - - -
3+700.000 10.00 - - - -
3+710.000 10.00 - - - -
3+720.000 10.00 - - - -
3+730.000 10.00 - - - -
3+740.000 10.00 - - - -
3+750.000 10.00 - - - -
3+760.000 10.00 - - - -
3+770.000 10.00 - - - -
3+780.000 10.00 - - - -
3+790.000 10.00 - - - -
3+800.000 10.00 - - - -
3+810.000 10.00 - - - -
3+820.000 10.00 - - - -
3+830.000 10.00 - - - -
3+840.000 10.00 - - - -
3+850.000 10.00 - - - -
3+860.000 10.00 - - - -
3+870.000 10.00 - - - -
3+880.000 10.00 - - - -
3+890.000 10.00 - - - -
3+900.000 10.00 - - - -
3+910.000 10.00 - - - -
3+920.000 10.00 - - - -
3+930.000 10.00 - - - -
3+940.000 10.00 - - - -
3+950.000 10.00 - - - -
3+960.000 10.00 - - - -
PC 3+970.000 10.00 0.68 0.25 - -
3+980.000 10.00 0.72 0.19 7.00 2.20
3+990.000 10.00 0.67 0.22 6.95 2.05
4+000.000 10.00 0.68 0.22 6.75 2.20
Volumen parcial (km 3 - km 4) 62.25 19.90

4+000.000 0.68 0.22


4+010.000 10.00 0.67 0.26 6.75 2.40
4+020.000 10.00 0.64 0.28 6.55 2.70
4+030.000 10.00 0.69 0.14 6.65 2.10
4+040.000 10.00 0.66 0.27 6.75 2.05
PT 4+050.000 10.00 0.63 0.26 6.45 2.65
4+060.000 10.00 - - - -
4+070.000 10.00 - - - -
4+080.000 10.00 - - - -
4+090.000 10.00 - - - -
4+100.000 10.00 - - - -
4+110.000 10.00 - - - -
4+120.000 10.00 - - - -
4+130.000 10.00 - - - -
4+140.000 10.00 - - - -
4+150.000 10.00 - - - -
4+160.000 10.00 - - - -

Page 44
4+170.000 10.00 BASE CORTE-RELLENO
- - - -
4+180.000 10.00 - - - -
4+190.000 10.00 - - - -
4+200.000 10.00 - - - -
4+210.000 10.00 - - - -
4+220.000 10.00 - - - -
4+230.000 10.00 - - - -
4+240.000 10.00 - - - -
4+250.000 10.00 - - - -
4+260.000 10.00 - - - -
4+270.000 10.00 - - - -
4+280.000 10.00 - - - -
4+290.000 10.00 - - - -
4+300.000 10.00 - - - -
4+310.000 10.00 - - - -
4+320.000 10.00 - - - -
4+330.000 10.00 - - - -
4+340.000 10.00 - - - -
4+350.000 10.00 - - - -
4+360.000 10.00 - - - -
4+370.000 10.00 - - - -
4+380.000 10.00 - - - -
4+390.000 10.00 - - - -
4+400.000 10.00 - - - -
4+410.000 10.00 - - - -
4+420.000 10.00 - - - -
4+430.000 10.00 - - - -
4+440.000 10.00 - - - -
4+450.000 10.00 - - - -
4+460.000 10.00 - - - -
4+470.000 10.00 - - - -
4+480.000 10.00 - - - -
4+490.000 10.00 - - - -
4+500.000 10.00 - - - -
4+510.000 10.00 - - - -
4+520.000 10.00 - - - -
4+530.000 10.00 - - - -
4+540.000 10.00 - - - -
4+550.000 10.00 - - - -
4+560.000 10.00 - - - -
PC 4+570.000 10.00 0.02 0.05 - -
4+580.000 10.00 0.03 0.05 0.25 0.50
4+590.000 10.00 0.02 0.04 0.25 0.45
4+600.000 10.00 0.01 0.03 0.15 0.35
4+610.000 10.00 0.02 0.04 0.15 0.35
PT 4+620.000 10.00 0.01 0.07 0.15 0.55
4+630.000 10.00 - - - -
4+640.000 10.00 - - - -
4+650.000 10.00 - - - -
4+660.000 10.00 - - - -
4+670.000 10.00 - - - -
4+680.000 10.00 - - - -
4+690.000 10.00 - - - -
4+700.000 10.00 - - - -
4+710.000 10.00 - - - -
4+720.000 10.00 - - - -
4+730.000 10.00 - - - -
4+740.000 10.00 - - - -
4+750.000 10.00 - - - -
4+760.000 10.00 - - - -
4+770.000 10.00 - - - -
4+780.000 10.00 - - - -
4+790.000 10.00 - - - -
4+800.000 10.00 - - - -
4+810.000 10.00 - - - -
4+820.000 10.00 - - - -
4+830.000 10.00 - - - -
4+840.000 10.00 - - - -
4+850.000 10.00 - - - -

Page 45
4+860.000 10.00 BASE CORTE-RELLENO
- - - -
4+870.000 10.00 - - - -
4+880.000 10.00 - - - -
4+890.000 10.00 - - - -
4+900.000 10.00 - - - -
4+910.000 10.00 - - - -
4+920.000 10.00 - - - -
4+930.000 10.00 - - - -
4+940.000 10.00 - - - -
4+950.000 10.00 - - - -
4+960.000 10.00 - - - -
4+970.000 10.00 - - - -
4+980.000 10.00 - - - -
4+990.000 10.00 - - - -
5+000.000 10.00 - - - -
Volumen parcial (km 4 - km 5) 34.10 14.10

Page 46
FUNDACION

SOCIEDAD MINERA CERRO VERDE S.A.A. AREQUIPA , PERU


PROYECTO :OBRAS DE MOVIMIENTO DE TIERRA, RELLENOS, PAVIMENTOS
A NIVEL DE BASE IMPRIMADA - CARRETERA AR 115
Unidad : m3
PROGRESIVAS: Km. 6+000 - Km- 13+882

PLANILLA DE METRADOS - FUNDACIN

Volumen de
rea de Relleno rea de Corte Volumen de
Distancia Relleno
Progresiva Fundacin Fundacin Corte Fundacin
(m) Fundacin
(m2) (m2) (m3)
(m3)

6+000.000 - 0.28
6+010.000 10.00 - 0.65 - 4.65
6+020.000 10.00 - 0.34 - 4.95
6+030.000 10.00 - 0.12 - 2.30
6+040.000 10.00 - 0.31 - 2.15
6+050.000 10.00 - 0.75 - 5.30
6+060.000 10.00 - 0.38 - 5.65
6+070.000 10.00 0.03 1.16 - 7.70
6+080.000 10.00 - 0.52 0.08 8.40
6+090.000 10.00 1.29 0.19 - 3.55
6+100.000 10.00 - 0.38 3.23 2.85
6+110.000 10.00 - 1.89 - 11.35
6+120.000 10.00 0.13 1.60 - 17.45
6+130.000 10.00 2.67 0.25 14.00 9.25
6+140.000 10.00 1.16 0.08 19.15 1.65
6+150.000 10.00 0.86 0.09 10.10 0.85
6+160.000 10.00 0.42 0.14 6.40 1.15
6+170.000 10.00 0.56 0.38 4.90 2.60
6+180.000 10.00 0.80 1.23 6.80 8.05
6+190.000 10.00 1.53 0.65 11.65 9.40
6+200.000 10.00 1.50 0.40 15.15 5.25
6+210.000 10.00 0.18 1.51 8.40 9.55
6+220.000 10.00 0.44 1.93 3.10 17.20
6+230.000 10.00 0.71 1.07 7.39 16.87
V. ATRS 6+232.490 2.49 0.61 0.43
V. ADELANTE 6+230.000 0.00 0.61 0.43
6+240.000 10.00 0.59 0.58 6.00 5.05
6+250.000 10.00 0.62 0.50 6.05 5.40
6+260.000 10.00 0.20 0.80 4.10 6.50
6+270.000 10.00 3.24 0.95 17.20 8.75
6+280.000 10.00 4.26 0.75 37.50 8.50
6+290.000 10.00 0.24 2.58 22.50 16.65
6+300.000 10.00 4.64 2.49 24.40 25.35
6+310.000 10.00 5.41 1.71 50.25 21.00
6+320.000 10.00 2.13 4.26 37.70 29.85
6+330.000 10.00 1.16 3.16 16.45 37.10
6+340.000 10.00 9.42 0.15 52.90 16.55
6+350.000 10.00 18.23 - 138.25 0.38
6+360.000 10.00 1.46 1.40 98.45 3.50

Page 47
6+370.000 10.00 FUNDACION
4.99 0.07 32.25 7.35
6+380.000 10.00 0.74 0.71 28.65 3.90
6+390.000 10.00 0.13 1.23 4.35 9.70
6+400.000 10.00 0.12 1.10 1.25 11.65
6+410.000 10.00 0.01 2.01 0.65 15.55
6+420.000 10.00 0.12 2.35 0.65 21.80
6+430.000 10.00 2.28 1.92 12.00 21.35
6+440.000 10.00 1.45 3.00 18.65 24.60
6+450.000 10.00 1.92 1.16 16.85 20.80
6+460.000 10.00 5.99 0.24 39.55 7.00
6+470.000 10.00 10.46 - 82.25 0.60
6+480.000 10.00 12.22 0.02 113.40 0.05
6+490.000 10.00 10.76 0.89 114.90 4.55
6+500.000 10.00 10.37 0.21 105.65 5.50
6+510.000 10.00 0.35 4.03 53.60 21.20
6+520.000 10.00 - 2.19 - 31.10
6+530.000 10.00 - 0.86 - 15.25
6+540.000 10.00 - 0.51 - 6.85
6+550.000 10.00 - 1.80 - 11.55
6+560.000 10.00 - 3.07 - 24.35
6+570.000 10.00 - 6.54 - 48.05
6+580.000 10.00 - 6.24 - 63.90
6+590.000 10.00 - 4.39 - 53.15
6+600.000 10.00 - 11.32 - 78.55
6+610.000 10.00 - 12.62 - 119.70
6+620.000 10.00 5.40 3.57 80.95
6+630.000 10.00 8.15 4.19 67.75 38.80
6+640.000 10.00 2.76 1.34 54.55 27.65
6+650.000 10.00 2.21 0.11 24.85 7.25
6+660.000 10.00 - - - -
6+670.000 10.00 - - - -
6+680.000 10.00 - - - -
6+690.000 10.00 - - - -
6+700.000 10.00 - - - -
6+710.000 10.00 - - - -
6+720.000 10.00 - - - -
6+730.000 10.00 - - - -
6+740.000 10.00 - - - -
6+750.000 10.00 - - - -
6+760.000 10.00 - - - -
6+770.000 10.00 - - - -
6+780.000 10.00 - - - -
6+790.000 10.00 - - - -
6+800.000 10.00 - - - -
6+810.000 10.00 - - - -
6+820.000 10.00 - - - -
6+830.000 10.00 - - - -
6+840.000 10.00 - - - -
6+850.000 10.00 - - - -
6+860.000 10.00 - - - -
6+870.000 10.00 - - - -
6+880.000 10.00 - - - -
6+890.000 10.00 - - - -
6+900.000 10.00 - - - -
6+910.000 10.00 - - - -
6+920.000 10.00 - - - -

Page 48
6+930.000 10.00 FUNDACION
- - - -
6+940.000 10.00 - - - -
6+950.000 10.00 - - - -
6+960.000 10.00 0.71 1.24 - -
6+970.000 10.00 1.90 0.17 13.05 7.05
6+980.000 10.00 0.34 0.07 11.20 1.20
6+990.000 10.00 0.42 0.72 3.80 3.95
7+000.000 10.00 0.03 0.63 2.25 6.75
Volumen parcial (km 6 - km 7) 1,424.19 1,144.34

0.03 0.63
7+010.000 10.00 0.16 0.07 0.95 3.50
7+020.000 10.00 0.31 0.09 2.35 0.80
7+030.000 10.00 0.30 0.44 3.05 2.65
7+040.000 10.00 0.36 0.20 3.30 3.20
7+050.000 10.00 2.45 - 14.05 0.50
7+060.000 10.00 0.24 1.29 13.45 3.23
7+070.000 10.00 0.58 2.43 4.10 18.60
7+080.000 10.00 0.72 3.08 6.50 27.55
7+090.000 10.00 0.82 2.57 7.70 28.25
7+100.000 10.00 1.04 1.78 9.30 21.75
7+110.000 10.00 0.24 1.41 6.40 15.95
7+120.000 10.00 0.21 1.33 2.25 13.70
7+130.000 10.00 0.44 1.11 3.25 12.20
7+140.000 10.00 0.09 1.84 2.65 14.75
7+150.000 10.00 0.09 1.86 0.90 18.50
7+160.000 10.00 0.33 2.13 2.10 19.95
7+170.000 10.00 0.44 1.87 3.85 20.00
7+180.000 10.00 1.06 1.48 7.50 16.75
7+190.000 10.00 0.70 1.72 8.80 16.00
7+200.000 10.00 0.53 1.68 6.15 17.00
7+210.000 10.00 0.25 2.77 3.90 22.25
7+220.000 10.00 0.35 2.37 3.00 25.70
7+230.000 10.00 0.33 2.89 3.40 26.30
7+240.000 10.00 - - - -
7+250.000 10.00 - - - -
7+260.000 10.00 - - - -
7+270.000 10.00 - - - -
7+280.000 10.00 - - - -
7+290.000 10.00 - - - -
7+300.000 10.00 - - - -
7+310.000 10.00 - - - -
7+320.000 10.00 - - - -
7+330.000 10.00 - - - -
7+340.000 10.00 - - - -
7+350.000 10.00 - - - -
7+360.000 10.00 - - - -
7+370.000 10.00 - - - -
7+380.000 10.00 - 4.04 - -
7+390.000 10.00 - 3.30 - 36.70
7+400.000 10.00 0.36 2.05 - 26.75
7+410.000 10.00 - 2.00 0.90 20.25
7+420.000 10.00 - 2.14 - 20.70
7+430.000 10.00 - 1.47 - 18.05
7+440.000 10.00 0.27 1.02 - 12.45
7+450.000 10.00 - 1.48 0.68 12.50

Page 49
7+460.000 10.00 FUNDACION
- 1.74 - 16.10
7+470.000 10.00 - 1.89 - 18.15
7+480.000 10.00 - 1.60 - 17.45
7+490.000 10.00 0.36 1.04 - 13.20
7+500.000 10.00 0.21 1.19 2.85 11.15
7+510.000 10.00 0.13 0.98 1.70 10.85
7+520.000 10.00 0.02 1.18 0.75 10.80
7+530.000 10.00 0.02 1.81 0.20 14.95
7+540.000 10.00 1.11 2.28 5.65 20.45
7+550.000 10.00 3.04 1.57 20.75 19.25
7+560.000 10.00 2.54 1.91 27.90 17.40
7+570.000 10.00 1.65 1.48 20.95 16.95
7+580.000 10.00 1.12 1.13 13.85 13.05
7+590.000 10.00 1.75 0.72 14.35 9.25
7+600.000 10.00 1.82 0.28 17.85 5.00
7+610.000 10.00 0.25 0.49 10.35 3.85
7+620.000 10.00 0.10 0.57 1.75 5.30
7+630.000 10.00 0.60 0.46 3.50 5.15
7+640.000 10.00 0.67 0.53 6.35 4.95
7+650.000 10.00 0.13 0.27 4.00 4.00
7+660.000 10.00 0.30 0.51 2.15 3.90
7+670.000 10.00 0.56 0.16 4.30 3.35
7+680.000 10.00 0.66 0.25 6.10 2.05
7+690.000 10.00 0.84 0.31 7.50 2.80
7+700.000 10.00 0.22 0.47 5.30 3.90
7+710.000 10.00 0.51 0.50 3.65 4.85
7+720.000 10.00 0.44 0.61 4.75 5.55
7+730.000 10.00 0.24 0.68 3.40 6.45
7+740.000 10.00 - 1.26 0.60 9.70
7+750.000 10.00 0.19 0.64 0.48 9.50
7+760.000 10.00 0.20 0.15 1.95 3.95
7+770.000 10.00 0.15 0.57 1.75 3.60
7+780.000 10.00 0.22 0.28 1.85 4.25
7+790.000 10.00 0.17 0.57 1.95 4.25
7+800.000 10.00 0.01 1.18 0.90 8.75
7+810.000 10.00 0.17 0.83 0.90 10.05
7+820.000 10.00 0.62 0.74 3.95 7.85
7+830.000 10.00 0.66 1.88 6.40 13.10
7+840.000 10.00 1.01 1.70 8.35 17.90
7+850.000 10.00 1.41 1.17 12.10 14.35
7+860.000 10.00 0.92 1.42 11.65 12.95
7+870.000 10.00 0.89 1.20 9.05 13.10
7+880.000 10.00 0.87 0.90 8.80 10.50
7+890.000 10.00 1.18 0.66 10.25 7.80
7+900.000 10.00 0.27 0.63 7.25 6.45
7+910.000 10.00 1.16 0.56 7.15 5.95
7+920.000 10.00 0.89 0.29 10.25 4.25
7+930.000 10.00 1.16 0.38 10.25 3.35
7+940.000 10.00 0.96 0.53 10.60 4.55
7+950.000 10.00 0.76 0.65 8.60 5.90
7+960.000 10.00 0.27 1.23 5.15 9.40
7+970.000 10.00 0.14 1.68 2.05 14.55
7+980.000 10.00 0.12 0.46 1.30 10.70
7+990.000 10.00 0.37 0.33 2.45 3.95
8+000.000 10.00 1.27 0.34 8.20 3.35
Volumen parcial (km 7 - km 8) 464.55 990.58

Page 50
FUNDACION
1.27 0.34
8+010.000 10.00 0.01 1.29 6.40 8.15
8+020.000 10.00 2.28 0.01 11.45 6.50
8+030.000 10.00 0.93 0.22 16.05 1.15
8+040.000 10.00 1.43 0.48 11.80 3.50
8+050.000 10.00 1.48 0.17 14.55 3.25
8+060.000 10.00 2.14 0.34 18.10 2.55
8+070.000 10.00 1.92 0.56 20.30 4.50
8+080.000 10.00 1.31 0.90 16.15 7.30
8+090.000 10.00 0.19 2.95 7.50 19.25
8+100.000 10.00 - 2.55 - 27.50
8+110.000 10.00 - 2.31 - 24.30
8+120.000 10.00 0.04 1.47 0.10 18.90
8+130.000 10.00 0.36 2.40 2.00 19.35
8+140.000 10.00 0.25 2.10 3.05 22.50
8+150.000 10.00 0.05 1.12 1.50 16.10
8+160.000 10.00 0.24 2.12 1.45 16.20
8+170.000 10.00 0.23 0.52 2.35 13.20
8+180.000 10.00 1.32 0.12 7.75 3.20
8+190.000 10.00 1.93 0.77 16.25 4.45
8+200.000 10.00 2.91 0.57 24.20 6.70
8+210.000 10.00 1.02 1.17 19.65 8.70
8+220.000 10.00 1.01 0.33 10.15 7.50
8+230.000 10.00 0.47 0.42 7.40 3.75
8+240.000 10.00 0.94 0.30 7.05 3.60
8+250.000 10.00 0.18 0.85 5.60 5.75
8+260.000 10.00 0.17 0.65 1.75 7.50
8+270.000 10.00 0.93 0.74 5.50 6.95
8+280.000 10.00 0.28 2.15 6.05 14.45
8+290.000 10.00 0.13 1.53 2.05 18.40
8+300.000 10.00 0.15 1.23 1.40 13.80
8+310.000 10.00 1.47 0.83 8.10 10.30
8+320.000 10.00 3.28 0.24 23.75 5.35
8+330.000 10.00 0.16 7.20 17.20 37.20
8+340.000 10.00 0.12 8.75 1.40 79.75
8+350.000 10.00 - 6.56 0.30 76.55
8+360.000 10.00 0.71 4.82 1.78 56.90
8+370.000 10.00 1.62 4.10 11.65 44.60
8+380.000 10.00 0.14 2.77 8.80 34.35
8+390.000 10.00 0.03 3.47 0.85 31.20
8+400.000 10.00 0.02 2.67 0.25 30.70
8+410.000 10.00 0.17 1.21 0.95 19.40
8+420.000 10.00 1.08 0.86 6.25 10.35
8+430.000 10.00 0.71 1.55 8.95 12.05
8+440.000 10.00 0.01 2.43 3.60 19.90
8+450.000 10.00 0.42 0.44 2.15 14.35
8+460.000 10.00 1.27 0.38 8.45 4.10
8+470.000 10.00 0.51 0.30 8.90 3.40
8+480.000 10.00 0.09 0.75 3.00 5.25
8+490.000 10.00 - 3.00 - 18.75
8+500.000 10.00 - - - -
8+510.000 10.00 - - - -
8+520.000 10.00 - - - -
8+530.000 10.00 - - - -
8+540.000 10.00 - - - -

Page 51
8+550.000 10.00 FUNDACION
- - - -
8+560.000 10.00 - - - -
8+570.000 10.00 - - - -
8+580.000 10.00 - - - -
8+590.000 10.00 - - - -
8+600.000 10.00 - - - -
8+610.000 10.00 - - - -
8+620.000 10.00 - - - -
8+630.000 10.00 - - - -
8+640.000 10.00 - - - -
8+650.000 10.00 - - - -
8+660.000 10.00 - - - -
8+670.000 10.00 - - - -
8+680.000 10.00 - - - -
8+690.000 10.00 - - - -
8+700.000 10.00 - - - -
8+710.000 10.00 - - - -
8+720.000 10.00 - - - -
8+730.000 10.00 - - - -
8+740.000 10.00 - - - -
8+750.000 10.00 - - - -
8+760.000 10.00 - - - -
8+770.000 10.00 - - - -
8+780.000 10.00 - - - -
8+790.000 10.00 - - - -
8+800.000 10.00 - - - -
8+810.000 10.00 - - - -
8+820.000 10.00 - - - -
8+830.000 10.00 - - - -
8+840.000 10.00 - - - -
8+850.000 10.00 - - - -
8+860.000 10.00 - - - -
8+870.000 10.00 - - - -
8+880.000 10.00 - - - -
8+890.000 10.00 - - - -
8+900.000 10.00 - - - -
8+910.000 10.00 - - - -
8+920.000 10.00 - - - -
8+930.000 10.00 - - - -
8+940.000 10.00 - - - -
8+950.000 10.00 - - - -
8+960.000 10.00 - - - -
8+970.000 10.00 - - - -
8+980.000 10.00 - - - -
8+990.000 10.00 - - - -
9+000.000 10.00 - - - -
Volumen parcial (km 8 - km 9) 363.88 833.40

9+000.000 - -
9+010.000 10.00 - - - -
9+020.000 10.00 - - - -
9+030.000 10.00 - - - -
9+040.000 10.00 - - - -
9+050.000 10.00 - - - -
9+060.000 10.00 - - - -
9+070.000 10.00 - - - -

Page 52
9+080.000 10.00 FUNDACION
- - - -
9+090.000 10.00 - - - -
9+100.000 10.00 - - - -
9+110.000 10.00 - - - -
9+120.000 10.00 - - - -
9+130.000 10.00 - - - -
9+140.000 10.00 - - - -
9+150.000 10.00 - - - -
9+160.000 10.00 - - - -
9+170.000 10.00 - - - -
9+180.000 10.00 0.86 0.64 - -
9+190.000 10.00 0.85 1.20 8.55 9.20
9+200.000 10.00 0.17 0.54 5.10 8.70
9+210.000 10.00 0.44 0.22 3.05 3.80
9+220.000 10.00 0.49 0.22 4.65 2.20
9+230.000 10.00 0.10 0.17 2.95 1.95
9+240.000 10.00 0.57 0.90 3.35 5.35
9+250.000 10.00 0.31 0.12 4.40 5.10
9+260.000 10.00 0.97 0.43 6.40 2.75
9+270.000 10.00 0.02 0.84 4.95 6.35
9+280.000 10.00 0.46 0.53 2.40 6.85
9+290.000 10.00 0.79 0.42 6.25 4.75
9+300.000 10.00 0.28 0.15 5.35 2.85
9+310.000 10.00 - - - -
9+320.000 10.00 - - - -
9+330.000 10.00 - - - -
9+340.000 10.00 - - - -
9+350.000 10.00 - - - -
9+360.000 10.00 - - - -
9+370.000 10.00 - - - -
9+380.000 10.00 - - - -
9+390.000 10.00 - - - -
9+400.000 10.00 - - - -
9+410.000 10.00 - - - -
9+420.000 10.00 - - - -
9+430.000 10.00 - - - -
9+440.000 10.00 - - - -
9+450.000 10.00 - - - -
9+460.000 10.00 - - - -
9+470.000 10.00 - - - -
9+480.000 10.00 - - - -
9+490.000 10.00 - - - -
9+500.000 10.00 - - - -
9+510.000 10.00 - - - -
9+520.000 10.00 - - - -
9+530.000 10.00 - - - -
9+540.000 10.00 - - - -
9+550.000 10.00 - - - -
9+560.000 10.00 - - - -
9+570.000 10.00 - - - -
9+580.000 10.00 - - - -
9+590.000 10.00 - - - -
9+600.000 10.00 - - - -
9+610.000 10.00 - - - -
9+620.000 10.00 - - - -
9+630.000 10.00 - - - -

Page 53
9+640.000 10.00 FUNDACION
- - - -
9+650.000 10.00 - - - -
9+660.000 10.00 - - - -
9+670.000 10.00 - - - -
9+680.000 10.00 - - - -
9+690.000 10.00 - - - -
9+700.000 10.00 - - - -
9+710.000 10.00 - - - -
9+720.000 10.00 - - - -
9+730.000 10.00 - - - -
9+740.000 10.00 - - - -
9+750.000 10.00 - - - -
9+760.000 10.00 - - - -
9+770.000 10.00 - - - -
9+780.000 10.00 - - - -
9+790.000 10.00 - - - -
9+800.000 10.00 - - - -
9+810.000 10.00 - - - -
9+820.000 10.00 - - - -
9+830.000 10.00 - - - -
9+840.000 10.00 - - - -
9+850.000 10.00 - - - -
9+860.000 10.00 - - - -
9+870.000 10.00 - - - -
9+880.000 10.00 - - - -
9+890.000 10.00 - - - -
9+900.000 10.00 - - - -
9+910.000 10.00 - - - -
9+920.000 10.00 - - - -
9+930.000 10.00 - - - -
9+940.000 10.00 - - - -
9+950.000 10.00 - - - -
9+960.000 10.00 - - - -
9+970.000 10.00 - - - -
9+980.000 10.00 - - - -
9+990.000 10.00 - - - -
10+000.000 10.00 - - - -
Volumen parcial (km 9 - km 10) 57.40 59.85

11+000.000 - -
11+010.000 10.00 - - - -
11+020.000 10.00 - - - -
11+030.000 10.00 - - - -
11+040.000 10.00 - - - -
11+050.000 10.00 - - - -
11+060.000 10.00 - - - -
11+070.000 10.00 - - - -
11+080.000 10.00 - - - -
11+090.000 10.00 - - - -
11+100.000 10.00 - - - -
11+110.000 10.00 - - - -
11+120.000 10.00 - - - -
11+130.000 10.00 - - - -
11+140.000 10.00 - - - -
11+150.000 10.00 - 18.33 - -
11+160.000 10.00 - 11.35 - 148.40

Page 54
11+170.000 10.00 FUNDACION
0.02 2.67 - 70.10
11+180.000 10.00 0.12 0.40 0.70 15.35
11+190.000 10.00 0.08 1.94 1.00 11.70
11+200.000 10.00 0.21 1.61 1.45 17.75
11+210.000 10.00 0.26 0.68 2.35 11.45
11+220.000 10.00 2.07 0.07 11.65 3.75
11+230.000 10.00 2.14 - 21.05 -
11+240.000 10.00 1.15 0.01 16.45 -
11+250.000 10.00 3.31 - 22.30 0.03
11+260.000 10.00 0.77 0.14 20.40 0.35
11+270.000 10.00 0.01 0.62 3.90 3.80
11+280.000 10.00 0.15 0.56 0.80 5.90
11+290.000 10.00 0.24 0.15 1.95 3.55
11+300.000 10.00 0.15 0.69 1.95 4.20
11+310.000 10.00 0.10 5.56 1.25 31.25
11+320.000 10.00 0.30 15.30 2.00 104.30
11+330.000 10.00 0.02 6.37 1.60 108.35
11+340.000 10.00 3.58 8.58 18.00 74.75
11+350.000 10.00 3.37 11.82 34.75 102.00
11+360.000 10.00 4.31 19.61 38.40 157.15
11+370.000 10.00 1.78 10.29 30.45 149.50
11+380.000 10.00 0.66 6.70 12.20 84.95
11+390.000 10.00 0.76 2.62 7.10 46.60
11+400.000 10.00 - 4.53 1.90 35.75
11+410.000 10.00 0.02 2.28 0.05 34.05
11+420.000 10.00 0.36 1.99 1.90 21.35
11+430.000 10.00 0.65 3.06 5.05 25.25
11+440.000 10.00 0.31 4.14 4.80 36.00
11+450.000 10.00 - 0.89 - 25.15
11+460.000 10.00 - - - -
11+470.000 10.00 - - - -
11+480.000 10.00 - - - -
11+490.000 10.00 - - - -
11+500.000 10.00 - - - -
11+510.000 10.00 - - - -
11+520.000 10.00 - - - -
11+530.000 10.00 - - - -
11+540.000 10.00 - - - -
11+550.000 10.00 - - - -
11+560.000 10.00 - - - -
11+570.000 10.00 - - - -
11+580.000 10.00 - - - -
11+590.000 10.00 - - - -
11+600.000 10.00 - - - -
11+610.000 10.00 - - - -
11+620.000 10.00 - - - -
11+630.000 10.00 - - - -
11+640.000 10.00 - - - -
11+650.000 10.00 - - - -
11+660.000 10.00 - - - -
11+670.000 10.00 - - - -
11+680.000 10.00 - - - -
11+690.000 10.00 - - - -
11+700.000 10.00 - - - -
11+710.000 10.00 - - - -
11+720.000 10.00 - - - -

Page 55
11+730.000 10.00 FUNDACION
- - - -
11+740.000 10.00 - - - -
V. ATRS 11+741.596 1.60 - - - -
Volumen parcial (km 11 - km 12) 265.40 1,332.73
EE. V.AD 12+260.000 - -
12+270.000 10.00 - - - -
12+280.000 10.00 - 2.92 - -
12+290.000 10.00 - 5.19 - 40.55
12+300.000 10.00 - 7.52 - 63.55
12+310.000 10.00 - 7.38 - 74.50
12+320.000 10.00 - 7.30 - 73.40
12+330.000 10.00 0.02 6.31 - 68.05
12+340.000 10.00 0.02 4.68 0.20 54.95
12+350.000 10.00 - 3.41 - 40.45
12+360.000 10.00 - 2.39 - 29.00
12+370.000 10.00 - 0.99 - 16.90
12+380.000 10.00 - 1.50 - 12.45
12+390.000 10.00 0.01 0.31 - 9.05
12+400.000 10.00 - 0.80 0.03 5.55
12+410.000 10.00 - 0.77 - 7.85
12+420.000 10.00 0.36 0.13 - 4.50
12+430.000 10.00 0.09 0.47 2.25 3.00
12+440.000 10.00 - 1.63 - 10.50
12+450.000 10.00 0.02 0.45 0.05 10.40
12+460.000 10.00 0.46 - 2.40 -
12+470.000 10.00 0.02 0.94 2.40 2.35
12+480.000 10.00 0.02 1.03 0.20 9.85
12+490.000 10.00 0.17 0.52 0.95 7.75
12+500.000 10.00 0.07 0.61 1.20 5.65
12+510.000 10.00 0.03 0.85 0.50 7.30
12+520.000 10.00 0.09 0.54 0.60 6.95
12+530.000 10.00 0.11 0.80 1.00 6.70
12+540.000 10.00 0.03 0.34 0.70 5.70
12+550.000 10.00 0.21 0.40 1.20 3.70
12+560.000 10.00 0.15 0.57 1.80 4.85
12+570.000 10.00 0.04 1.37 0.95 9.70
12+580.000 10.00 0.17 1.18 1.05 12.75
12+590.000 10.00 0.17 0.39 1.70 7.85
12+600.000 10.00 0.07 0.29 1.20 3.40
12+610.000 10.00 0.34 1.55 2.05 9.20
12+620.000 10.00 0.33 1.22 3.35 13.85
12+630.000 10.00 0.18 1.60 2.55 14.10
12+640.000 10.00 - 3.30 - 24.50
12+650.000 10.00 0.17 4.35 0.43 38.25
12+660.000 10.00 0.12 5.43 1.45 48.90
12+670.000 10.00 - 6.41 - 59.20
12+680.000 10.00 0.18 2.19 0.45 43.00
12+690.000 10.00 - 1.73 - 19.60
12+700.000 10.00 1.17 0.23 2.93 9.80
12+710.000 10.00 0.61 0.74 8.90 4.85
12+720.000 10.00 0.36 0.18 4.85 4.60
12+730.000 10.00 0.22 - 2.90 -
12+740.000 10.00 0.53 0.23 3.75 0.58
12+750.000 10.00 - 2.74 - 14.85
12+760.000 10.00 0.05 4.26 0.13 35.00

Page 56
12+770.000 10.00 FUNDACION
- 6.07 - 51.65
12+780.000 10.00 0.64 2.12 1.60 40.95
12+790.000 10.00 4.35 0.10 24.95 11.10
12+800.000 10.00 0.38 0.81 23.65 4.55
12+810.000 10.00 0.45 1.39 4.15 11.00
12+820.000 10.00 0.01 1.18 2.30 12.85
12+830.000 10.00 0.01 3.04 0.10 21.10
12+840.000 10.00 0.06 3.68 0.35 33.60
12+850.000 10.00 - 3.14 0.15 34.10
12+860.000 10.00 0.01 3.52 0.03 33.30
12+870.000 10.00 0.06 2.14 0.35 28.30
12+880.000 10.00 0.71 1.51 3.85 18.25
12+890.000 10.00 0.64 0.91 6.75 12.10
12+900.000 10.00 0.67 1.08 6.55 9.95
12+910.000 10.00 2.12 0.94 13.95 10.10
12+920.000 10.00 1.19 1.57 16.55 12.55
12+930.000 10.00 0.34 1.65 7.65 16.10
12+940.000 10.00 0.77 5.05 5.55 33.50
12+950.000 10.00 0.05 3.78 4.10 44.15
12+960.000 10.00 - 1.57 - 26.75
12+970.000 10.00 - 5.66 - 36.15
12+980.000 10.00 0.01 1.32 - 34.90
12+990.000 10.00 - - 0.03 -
13+000.000 10.00 - - - -
Volumen parcial (km 12 - km 13) 176.70 1,496.43

13+000.000 - -
13+010.000 10.00 - - - -
13+020.000 10.00 - - - -
13+030.000 10.00 - - - -
13+040.000 10.00 - - - -
13+050.000 10.00 - - - -
13+060.000 10.00 - - - -
13+070.000 10.00 - - - -
13+080.000 10.00 - - - -
13+090.000 10.00 - - - -
13+100.000 10.00 - - - -
13+110.000 10.00 - - - -
13+120.000 10.00 - - - -
13+130.000 10.00 - - - -
13+140.000 10.00 - - - -
13+150.000 10.00 - - - -
13+160.000 10.00 - - - -
13+170.000 10.00 - - - -
13+180.000 10.00 - - - -
13+190.000 10.00 - - - -
13+200.000 10.00 - - - -
13+210.000 10.00 - - - -
13+220.000 10.00 - 0.45 - -
13+230.000 10.00 0.11 1.57 - 10.10
13+240.000 10.00 0.37 1.61 2.40 15.90
13+250.000 10.00 0.60 1.67 4.85 16.40
13+260.000 10.00 0.49 2.54 5.45 21.05
13+270.000 10.00 1.14 3.51 8.15 30.25
13+280.000 10.00 0.55 1.78 8.45 26.45
13+290.000 10.00 0.68 1.69 6.15 17.35

Page 57
13+300.000 10.00 FUNDACION
0.71 0.89 6.95 12.90
13+310.000 10.00 0.60 0.74 6.55 8.15
13+320.000 10.00 - 0.84 - 7.90
13+330.000 10.00 - 0.55 - 6.95
13+340.000 10.00 - 0.80 - 6.75
13+350.000 10.00 - 1.74 - 12.70
13+360.000 10.00 0.06 0.45 - 10.95
13+370.000 10.00 0.17 0.12 1.15 2.85
13+380.000 10.00 0.38 0.14 2.75 1.30
13+390.000 10.00 - 0.17 - 1.55
13+400.000 10.00 - 0.73 - 4.50
13+410.000 10.00 - 0.38 - 5.55
13+420.000 10.00 0.73 0.74 - 5.60
13+430.000 10.00 0.14 1.61 4.35 11.75
13+440.000 10.00 0.49 0.26 4.86 10.62
V. ATRS 13+443.250 3.25 0.56 0.52
V. ADELANTE
13+450.000 10.00 0.81 0.58 6.85 5.50
13+460.000 10.00 0.36 0.71 5.85 6.45
13+470.000 10.00 0.25 0.33 3.05 5.20
13+480.000 10.00 0.29 0.54 2.70 4.35
13+490.000 10.00 0.21 1.30 2.50 9.20
13+500.000 10.00 0.81 0.22 5.10 7.60
13+510.000 10.00 - - - -
13+520.000 10.00 - - - -
13+530.000 10.00 - - - -
13+540.000 10.00 - - - -
13+550.000 10.00 - - - -
13+560.000 10.00 - - - -
13+570.000 10.00 - - - -
13+580.000 10.00 - - - -
13+590.000 10.00 - - - -
13+600.000 10.00 - - - -
13+610.000 10.00 - - - -
13+620.000 10.00 - - - -
13+630.000 10.00 - - - -
13+640.000 10.00 - - - -
13+650.000 10.00 - - - -
13+660.000 10.00 - - - -
13+670.000 10.00 - - - -
13+680.000 10.00 - - - -
13+690.000 10.00 - - - -
13+700.000 10.00 - - - -
13+710.000 10.00 - - - -
13+720.000 10.00 - - - -
13+730.000 10.00 - - - -
13+740.000 10.00 - - - -
13+750.000 10.00 - - - -
13+760.000 10.00 - - - -
13+770.000 10.00 - - - -
13+780.000 10.00 - - - -
13+790.000 10.00 - - - -
13+800.000 10.00 - - - -
13+810.000 10.00 - - - -
13+820.000 10.00 - - - -
13+830.000 10.00 - - - -

Page 58
13+840.000 10.00 FUNDACION
- - - -
13+850.000 10.00 - - - -
13+860.000 10.00 - - - -
13+870.000 10.00 - - - -
13+880.000 10.00 - - - -
13+882.090 2.09 - - - -
Volumen parcial (km 13 - km 14) 88.11 285.82