Questions

19 to 26

SPEED HOURLY
INSPECTOR ACCURACY( HEIGHT
(units/hr) WAGE ($)
%)
Lotta $ 300.00 $ 98 11.8 5 ft 10 in.
Claire $ 200.00 $ 99 10.4 4 ft 3 in.
Finny $ 350.00 $ 96 11 5 ft 2 in.
Problem 3-3

LABOR-HOUR
REQUIREMENT
DEPARTMENT Product 1 Product 2
1 1 2
2 1 3
3 2 3
Problem 3-4

PROFIT PER
MODEL CUTTING (hr) ASSEMBLING (hr) PAINTING (hr)
TABLE ($)
A 3 4 5 25
B 1 2 5 20
C 4 5 4 50
Unpainted C 4 5 0 30
Capacity 150 200 300
Problem 3-5

ESTIMATED MAXIMUM
PRICE PER ANNUAL RETURN PO5SIBLE
STOCK SHARE $ PER SHARE $ INVESTMENT $
Gofer Crude 60 7 60,000
Can Oil 25 3 25,000
Sloth Petroleum 20 3 30,000
Problem 3-6

COST PER
GRAIN POUND PROTEIN CARBOHYDRATE
PRODUCT ($) (%) (%)
A 0.45 62 5
B 0.38 55 10
C 0.27 36 20
FAT
(%)
3
2
1
Problem 3-7
SALES PRICE
PER QUART
Ingredient SAUCE ($)
Sauce A B
Spicy Diablo at least 25% at least 50% 3.35
Red Baron at most 75% * 2.85
Cost per Quart $1.60 $2.59

* No explicit maximum or minimum percentage.


Problem 3-8

INGREDIENTS (oz/bottle)
DEMAND
HBO1 HBO2 HB03 (bottles)
Turmeric 4 2 1 1700
Paprika 3 2 3 Unlimited
Availability (ounces) 8,000 9,000 7,000
SALES PRICE PER
BOTTLE ($)
3.25
2.75
Problem 3-9
MINIMUM
MINERAL WEIGHT (Ib)
Nitrogen 10
Phosphorus 7
Potash 5

NITROGEN PHOSPHORUS POTASH


FERTILIZER CONTENT (Ib) CONTENT (Ib) CONTENT (lb)
I 25 10 5
II 10 5 10
III 5 10 5
Fertilizer Characteristics (per 1000 Ib)
PRICE (b)
10
8
7
Problem 3-10

MACHINE-HOUR REQUIREMENT
MACHINE Product 1 Product 2
1 3 2
2 1 4
3 5 3
Problem 3-11
PROFIT VARIABLE FIXED
MODEL CONTRIBUTION PRODUCTION COST ($)
($) TIME (hours)
Sedan 6,000 12 2.000,000
Station Wagon 8,000 15 3,000,000
Coupe 11,000 24 7,000.00
Problem 3-12
SELLING VARIABLE
PRODUCT PRICE PER COST PER FIXED
UNIT ($) UNIT ($) COST ($)
Umidaire 450 240 150,000
Depollinator 700 360 240,000
Problem 3-13
MAXIMUM
EXPECTED ALLOWABLE
INVESTMENT EARNED INVESTMENT
POSSIBILlTY RETURN (%) (MILLIONS $)
Treasury Bonds 8 5
Common Stock 6 7
Money Market 12 2
Municipal Bonds 9 4
Problem 3-14
LABOR HOURS
USABLE AVAILABLE PER
FARM ACREAGE MONTH
1 500 1700
2 900 3000
3 300 900
4 700 2200

MONTHLY
LABOR HOURS EXPECIED
MAXIMUM REQUIRED PER PROFlT PER
CROP ACREAGE ACRE ACRE ($)
A 700 2 500
B 800 4 200
C 300 3 300
Problem 3-15
VINTAGE
SALES PRICE PER
BLEND 1 2 3 4 GALLON
at least 2 & 3 in any at least
A * 75% proportion 8% 80
at least at most
B * 10% * 35% 50
at least 35% 2 & 3 in any
C * proportion * 35
SUPPLY
(gallons) 130 200 150 350
*Indicates no restriction
Problem 3-16
MINIMUM NUMBER
OF WAITER
DAY HOURS REQUIRED
Monday 150
Tuesday 200
Wednesday 400
Thursday 300
Friday 700
Saturday 800
Sunday 300
Problem 3-17
MACHINE
MAXIMUM
PRODUCT 1 2 3 4 DEMAND
A 5 10 6 3 400
B 3 6 4 8 100
C 4 5 3 3 150
D 4 2 1 2 500
Problem 3-18
TIME REQUIRED (hr)
COST PER
HOUR OF SHOP TIME
SHOP TIME AVAIIABLE
SHOP A B C D ($) (hr)
1 32 151 72 118 89 160
2 39 147 61 126 81 160
3 46 155 57 121 84 160
Problem 3-19
M TU W TH F
A.M. 900 1000 450 800 700
P.M. 800 500 1000 300 750
Problem 3-20
INPUTS OUTPUTS
PROCES Starter Lighter
S Kerosene Benzene Fluid Fluid
1 3 9 15 6
2 12 6 9 24
Problem 3-21
MAXIMUM
ALLOWABLE
INVESTMENT INVESTMENT
POSSIBILITY BETA (MILLIONS $)
Treasury Bonds 0 7
Common Stock 1 2
Money Market 0.3333 5
Municipal Bonds 0.5 4
Problem 3-23
Regular Daily
Demand (Waiter Scheduled Larger
Day Hours) Group Meetings
Monday 125 1
Tuesday 200 0
Wednesday 350 1
Thursday 300 0
Friday 650 3
Saturday 725 4
Sunday 250 2

Number of
Group
Meetings per Waiter Hours
Day Needed
0 0
1 24
2 36
3 52
4 64
5 80
Problem 3-24
LABOR HOURS
USABLE AVAILABLE PER
FARM ACREAGE MONTH
1 500 1700
2 900 3000
3 300 900
4 700 2200

MONTHLY
LABOR HOURS EXPECTED HARV.
REQUIRED PER PROFIT PER MACHINE
CROP ACRE ACRE ($) Lamda n COST/hr ($)
A 2 500 0.02 2 15
B 4 200 0.02 3 20
C 3 300 0.03 1 20
Problem 3-25
DURATION TRANSMISSION
PHASES (hrs) (units/hr)
Setup 8 0
Startup 120 0.5
Regular
Production 1
Problem 3-26
Retailer
Warehouse 1 2 3
1 5 7 6
2 8 9 10
3 4 3 11
Problem 3-28
Srerver
1 2 3 Request Demand
Web 1 1 1 310
Database 2.5 NA 4 40
eCommerce 2 5 NA 120

Server Capacity 230 360 160


Problem 3-29
Perfume Shampoo Skin Crme
Labor 1.5 2 2
Raw Material A 5 7 4
Raw Material B 2 2 5
Raw Material C 3 5 3
Demand 10000 7000 15000
Problem 3-30

Facility Assembly Fabrication


1 20000 100000
2 30000 100000
3 10000 70000
Total 60000 270000

Player Assembly Fabrication


Basic 3 8
Delixe 4 11
Laptop 8 16
Problem 3-31

Feul Energy Availability Cost


Manure 10 100 $ (50.00)
Wood Chips 7 200 $ 25.00
Natural Gas 40 Unlimited $ 120.00