Project No. MC 1312
Main Works Contract
Royal Oman Police Officers’ Club
‘Mechanical Specifications
1.36 Ductwork, connected to equipment , with an extemal static pressute exceeding two
hundred and fity (250) Pascal (Pa) and all ductwork exposed to external ambient
- conadtions or within uncondtioned spaces must be pressure tested prior to occupancy in
accordance with a method approved by Oman Municipality Authority and a compliant
137 Any damages resulting from tests shall be repaired andlor damaged materials replaced,
all to the satisfaction of the Engineer, and at no additional cost to the Employer.
138 ‘The duration of tests shall be as determined by all parties having jurisdiction, but in no
‘case less than the time prescribed in each subsection of the specification
139 In the event of any repair or any adjustment having to be made other than normal running
adjustment, the test shall be void and shall be repeated affer the adjustment or repairs
ave been mad
1.3.40 When pipes, valves, equipment etc., are to be covered or embedded or insulated; their
specific tests shall be carried out on them before any covering is applied. These tests shall
not relieve the contractor of any of his responsibilties and he shall take all necessary
precautions to insure the safely and protection of such tested items unt the termination of
the work.
1.3.11 Three copies of all test results shall be submitted to the Engineer.
14 ‘Submittals
144 ‘Two copies of Testing, Adjusting and Air Balancing strategies plans to be submitted. Plans
should show step-by-step procedures as specified in Part 3 Include also a complete set of
report forms intended for use on this Project.
142 ‘Submit two coples of reports prepared, as specified in this Section, on approved forms
cerified by Testing, Adjusting and Air Balancing firm.
143 Warranties if specified in this Section.
18 Quality Assurance
164 Ensure the participation of Testing, Adjusting and Air Balancing team members,
‘equipment manufacturers’ authorized service representatives, HVAC controls installers,
‘and other support personnel. Provide notice in advance of scheduled meeting time and
lecation
162 Coordinate the efforts of factory-authorized service representatives for systems and
equipment, HVAC controls installers, and other mechanics to operate HVAC systems and
equipment to support and assist Testing, Adjusting and Air Balancing activities.
153 Certify Testing, Adjusting and Air Balancing field data reports by reviewing field data
reports to validate accuracy of data, and certify that Testing, Adjusting and Air Balancing
team complied with approved Testing, Adjusting and Air Balancing plan and the
procedures specified and referenced in this Specification,
154 Use approved standard forms.
185 Calibrate instruments at least every six months or more frequently as required by
instrument manufacturer.
Khatib & Alam’ and Partners Section 23 05 63
Testing, Adjusting and Balancing for HVAC
2305.93-3