BOILER FRONT
2295 2295
BOILER FRONT BOILER FRONT
C
L OF LEFT SIDE WALL TUBE C
L OF LEFT SIDE WALL TUBE
3RY SH 1RY RH
(UPPER)
2RY SH 1RY RH
B B
(LOWER)
1RY SH
ECO
+37850
"C"
3RY SH UPPER
(OUTLET)
3RY SH OUTLET HDR
C
3RY SH LOWER
+31500 (OUTLET)
"C" +31050
3RY SH UPPER
(INTLET)
3RY SH INLET HDR
3RY SH LOWER
+29800 (INTLET)
1RY SH. INLET PIPE 1RY SH. INLET PIPE
"C"
4050
"C"
2RY SH OUTLET HDR
+27664.8 2RY SH LOWER
HORIZONTAL
SH&RH TUBES
ORIGINAL PRESENT
DETAIL C
G
E
G
SKIN CASING SKIN CASING
EXISTING SPACER POLYSTYRENE D-D SPACER
REFARACTORY WHEN REFRACTORY IS MISSING
SKIN BAR (CR-A) SKIN BAR BY LARGE AREA, TO BE POURED SKIN BAR
LOCATION E F
REFRACTORY IN TO FULL SPACE LOCATION G
D AFTER HAVING PUT POLYSTYRENE
2RY RH UPPER 57.1 59 2RY RH UPPER 59
2RY RH LOWER 57.1 59
BOUARD TO TUBE SPACE. 2RY RH LOWER 59
3RY SH UPPER(OUTLET) 54 56 3RY SH UPPER(OUTLET) 56
ORIGINAL 3RY SH LOWER(OUTLET) 54 56 PRESENT (CASE 1) 3RY SH LOWER(OUTLET) 56 PRESENT (CASE 2)
3RY SH UPPER(INLET) 54 56 3RY SH UPPER(INLET) 56
3RY SH LOWER(INLET) 54 56 <WHEN REFRACTORY IS MISSING> 3RY SH LOWER(INLET) 56 <WHEN REFRACTORY IS SOUNDLY>
2RY SH UPPER 57.1 59 2RY SH UPPER 59
2RY SH LOWER 57.1 59 DETAIL C 2RY SH LOWER 59
1RY SH 48.6 50 1RY SH 50
REFRACTORY REPIRING