ARTICLE

Adoptimn of nelv ccncepts


in material hand*ing irc cement
and ather rnir.neral industries
Jai P. Gupta, Chief General Manager, P. K. Mittal, Chief General Manager,
HOLTEC Consulting Private Limited, Gurgaon, Haryana

r Similor requirements ore olso required to hove rcilwoy siding.


emerging from cool industry, non
The poper briefly covers the
ferrous metol industries etc.
concept, principle of operoiion ond
lntroduction . The need for high copocity how it could be odopted by the
lndian cemenf industry has moteriol movement qt o foster Industry. Likely benefits ond certoin
witnessed rapid growth in past rote ond inodequocy of rood pre-requisites, which ore needed
2-3 decades. The overall networks in remote oreos. for odoptotion ore olso covered to
leoding to increoses relionce on
production capacity of the roil tronsportotion.
o certoin extent. ln cose of ony
industry, which used ro be customized needs, Holtec could be
approximately 60 million The poper covers moiority of the consulted for further help.
tonnes in early 90s, has more suggestions reloting to the mqteriol
In motion loading of clinker/
than quadrupled in about 20 movement through roil routes. The
years. moiority of moteriol tronsportotion coal in Railway rakes
Such rapid growth has
includes bulk tronsportotion of Cool, For the moteriol tronsport
clinker, flyosh ond cement. This connectivity ihrough roilwoys,
posed several challenges in
poper covers certoin concepts clinker/ cool looding is usuolly
front of the Industry, some of which could substontiolly reduce
which are: done through overlond hoppers,
looding ond unlooding time. These constructed on top of the roilwoy
. New projects ore forced to go concepts hove been successfully trocks ond looding of moteriol is
for difficult to occess / opprooch employed by Holtec in cement os done through telescopic chutes.
limestone deposits. well os other industries. ond could Depending upon the copocity ond
r Induslry being forced to go help the cement industry in speed requirements, more ond more
owoy from the morkets due to optimizing expenses on moteriol /
number of hoppers silos cqn be
difficulties in lond ovoilobility / hondling. constructed so thot more number of
ocquisition. The paper covers the following wogons could be loqded
o Unit sizes becoming lorger to 3 concepts: simultoneously. As per the usuol
horness economies of scqle. The concept opproximotely one roke
i. In motion looding of clinker or
usuol copocity of new cool in roilwoy rokes.
moteriol is stored in the overlond
production lines ronges from hoppers. The usuol time token for
5,000 - 10,000 fPD clinker ii. Use of bottom dischorge wogons one complete roke, vories from 3-6
production, os compored to for cool ond clinker tronsport hrs depending upon the number of
2000 to 3000 TPD in eorly 90s. qnd its eosy ond fost unlooding.
hoppers ovoiloble for looding of
This is leoding to need for highe, iii. Use of wogon shifters to reduce moteriql. Although more number of
volumes to be hondled. the oreo for the industriol units

J-S'1 4 PROCESS & PLANT ENGINEERING


ARTICLE

hoppers reduces totol time for filling operotion roilwoy roke moves ot the usuol ropid looding system,
the roke, but adds to other speed of obout 0.6 to Q.7 kn / hr. however hove been performing
complications, such as: Thot meons o full roke of clinker very successfully for lost Z-8 yeors.
. High number of equipments, {obout 650 m in length} is likely to At this locotion roke of obout 40
their drives.
get looded in obout I hr of time. wogons ore being looded in obout
45 minutes. Although the system is
r Heovy to very heovy civil A typicol pictoriol view is shown
locoted close to o densely
construction. populoted oreo, but os it hordly
r Constroint of more permonenr generotes ony nuisonce dust,
structures, os per roilwoy norms. Owners do not foce ony difficulties
in operotion.
o Occupotion of lorge oreo.
r The moteriol filling ond closing
More number of operotors.
ore through hydroulic gotes, ond
This poper suggests looding of wogon positioning is sensed
roil rokes in motion (Ropid looding through the proximity switches. A
system). With Ropid looding syslem, little bit of mointenonce qnd core
the entire roke could be looded in in operotion, hos been enough to
obout 60-80 minutes, from o single keep the system spilloge free.
dischorge point.
The orrongement os instolled for
What is Rapid Loading? lignite looding hos been depicted
shown in Figure 2.
ln ropid looding of moteriol,
moteriol is looded on roke, while Expected Benefits
the roilwoy roke is in motion. One Figure tr: ffapld lcadrng System ln
0peratian o The conventionol system of roil
silo {of obout one full roke copocity} looding, requires 3 to 6 hrs for
is constructed on iop of roil trock. in shown in Figure 1. looding of one compleie roil roke,
Below the hopper, onother smoll whereos with ropid looding
hopper is provided on lood cells, The moiority of the collieries in
Indio hove been using ropid system, the entire looding
which con occommodote obout I ooerqtion for one roke could be
wogon lood of moieriol. The obove looding system for cool roke completed in obout one hour.
2 hoppers ore connected through looding. Adopting the similor Assuming obout 3 hrs soving on
hydroulic gotes, ond lorge chute, concept, Holtec designed one ropid
one roke, could result into obout
so thot within seconds, moteriol looding system for lignite. As the ?000 hrs of rcke hondling time,
gets tronsferred from the moin system wos designed for lignite, it for o clinkrizotion unit of obout 2
hopper to the pre-weigh hopper wos substontiolly different from the mio tpo copocity. Such foster
{mounted on lood cell}.
Before o roke orrives, silo is
filled, so thot fost moteriol looding
on the roke, does not get disturbed.
In the beginning the lood cell
hopper is filled with pre-weighed
moteriol. As soon os the wogon
comes in position, the looding storts
ond the complete wogon is looded,
by the time it crosses. During the
period of wogon chonge, pre-
weigh hopper ogoin receives the
moteriol from moin hopper, so thot
by the time onother wogon comes
into position, it is reody with the
moteriol. During this entire Figure 2: Lignite !-aading System in Operation

42 VOL.XXXII NO,2
ARTICLE
movemenis of roke, sholl help in time (ie 15- l8 wogons unlooding orrongement. As ogoinst normol
better utilizoiion of
rokes, per hour). trock hoppers, Holtec designed o
especiolly if the compony owns very simple but effective sysiem for
the rokes. As Roilwoys wish to go for
longer rokes, with lorger copocity lignite unlooding in the yeor of
The totol investment required for wogons/ {recently RDSO 2A02, which is running successfully
hos
ropid looding ore substontiolly releqsed certoin new guide lines), since then. A brief description of
lower os comoored to the occording to whic[, oll new BOBRN iype wogon is os below:
conventionol systems.
BOBRN:Open hopper car with rapid
Numbers of drives required ore
{pneumalic) trotlom discharge dcors. air-
very few, os compored to the braked. EOBRN and BOBR (see above)
multiple units ond equipments are most olten used for carrying coal to
thermal power plants. and also for ore,
required for conventionol systems.
stone, track ballast, etc" fach wagon
Number of operotors ond holds some 60t of coal loaded trom ihe top
and unloaded from the bottom by means
ottendonts required would be 2 - of the pneumatically operated doors. The
3 (ot the time of looding) for entire contents of the ,wagon can be diseharged
completely in about 15 seconds.
operotions os compored lo 4 - 5
The door-opening mechanism is iriggered
{ot the time of looding) for by lineside devices running on a 24V or 32v DC source. As the wagons in a rake pass by the
conventionol system due to the triggering devices, their doors open and theif contents are unloaded into the pits below the
size of the system ond high tracks {the 'meny-Eo-round' system). The versions used by the power planls have 12 bottorn
doors. whereas lR uses variants that have B doors.
number of equipments.
o Dust nuisonce substontiolly
instollotions {olter December 201 0) Bosed on success of eorlier
reduces os compored to the
conventionol systems. sholl toke into considerotion lorger designs system for Ligniie, Holtec is
wogon size ond unlooding speed designing onother system for other
Pre-requisites sholl be increosed to obout 25 moteriols such os cool, copper
For the houling of roilwoy roke wogons per hour. As per the new concenirotes ond rock phosphote.
ot o constont speed of 0.6 to 0.7 designs of wogon tipplers, size of AII these moteriols ore quite difficult
km/hr, creep drive need to be wogon tippler ond its civil to flow ond cquses substontiql
instolled on the locomotive. As the construction requirements hove omount of dust nuisonce,
normol locomotives from roilwoys substontiolly increosed olong with occordingly the trock hoppers ore
do not hove this focility, Plont will copocities of the moteriol hondling being designed.
hove to mointoin their own equipments down the line.
The proposed wogon unlooding
locomotive for houloge of the As such instqllotion of wogon system is quite simple, with
roilwoy roke. tippler ond ossocioted ouxiliories underground hoppers ond opron
Use of bottom discharge wos expensive, ond recent feeder instolled for eoch wogon
enforcement from roilwoys, hos unlooding trock hopper. Typicolly
wagons for coaland clinker
further escoloted the cost of qbout 7 to 8 minutes of time is
transport and its easy instollotions of the wogon tippler required to unlood one set of
unloading ond its ossocioted ouxiliories. wogons, which include, wogon
Troditionolly, cement industry As ogoinst BQXC ond BOXN plocement, connection of
hqs been using normol BOX / type of wogon, ollocoted in cement compressed oir qnd unlooding. lf
BOXN type of wogons for the indusiry, power plonts qre the system is designed with 4
tronsportotion of cool & clinker. For ollocoted bottom dischorge wogons hoppers, opproximotely 2 hrs ore
the unlooding of these wogons, sufficient fo empty out complete
{BOBRNI, which con be emptied
wogon tipplers ore instolled, through pneumotic gotes instolled roke of 58 wogons. With more
through which these wogons ore below the wogons. For the number of unlooding hoppers, still
unlooded. As Roilwoys ollows 5 dischorge of such wogons, Thermol better speed of emptying could be
hrs lime for mechonized unlooding,
power plont instolls long trock ochieved. The system requires
wogon tipplers were typicolly hoppers with plough feeders. This shore compressed oir orrongement,
designed to unlood full roke of 5g is ogoin quite which needs to be connected to the
expensive
wogons in opproximotely 3-4 hrs wogons ond with one stroke the

J-S 14 PROCESS & PLANT ENGINEERING


ARTICLE

complete wogon gets emptied in o looding {Wogon tippler) requires wogonsr but groduolly fhey need
motter of seconds. obout 4 hrs for un-looding of one to switch over. As mony of the
roke, whereos with proposed industry ployers ore interested to go
A generol orrongement of trock
orrongement, the entire un- for iheir own wogons. it could be
hopper hos been shown in Figure
looding operotion for one roke, better to go for bottom dischorge
3A ond Figure 3B. could be completed in obout 2 wogons rqfher thon going for

4.....;

l1
f: ir ,r t1 flL.t. tf.ifl r Lti nt

iliri{ It
r!
il
. *ffii* -!,!
ri

1l
I 1l

1l
l
il
l
lr
AFFtir iLtijili

Figure Tra* tlapper Unloading $ysfem (Elevation View)

hrs. This 2 hrs soving on conventionol BOXC / BOXN


one roke, could result into wogons.
substontiolly lorge onnuol Use of Wagon Traverser
'* l*'-'1 sovings, considering both
I
c, ,.
drrlf:l)rl
;J
!
clinker qnd cool As exploined eorlier,
l
F"i-Si movement bottom by nowodoys the trend is to go for
dischorge wogons. Iorge copocity clinkrizoiion units,
locoted close to the limestone
o The totol investmenr deposit ond construct split locoted
required for proposed grinding units neorer to the source
system sholl be sub- of flyosh {Thermol Power Plonts).
sto n tio lly lowe r o s As moiority of the thermol power
compored to the wogon plont ore locoted closer to the
tippler especiolly of new densely populoted oreos, split
des ig n (G-3 3, Rev-0 I locoied grinding units olso gets
Moy 2010). locoted in these oreos. Due to high
Figure 38: Track Hopper Untoading System
{Secfronal l/r'ewj e Reliobility of the system density of populotion in these
lf the lndustry insists for bottom sholl be much better os oreos, lond is generolly expensive
dischorge wogons from Roilwoys, compored to the wogon iippler. ond ocquisition of odequote size
of plot for such units is olwoys o
similor syslems could be used in the r Dust nuisonce substontiolly chollenoe.
industry, for cool ond clinker reduces os compored to the
unlooding. The system proposed is conventionol systems. As mosl of these grinding units
quite simple, effective, fost ond ore receiving clinker through
economicql {not only on instollotion Pre-requisites roilwoy rokes they need to instoll
cost, but olso on its operotion). Initiolly could be difficult for the wogon tipplers. For the effective
Expected benefits industry io switch over to bottom utilizotion of wogon tipplers ond to
dischorge wogons, os roilwoys meet the time ollocoted by roilwoys
o The conventionol system of un- hove limited quontity of such for unlooding, it becomes must to

44 VOL.XXXII NO.2
ARTICLE

hove sufficient spoce (equivolent to roil trock {Exit trock} through o Authors
one roke lengthf before and ofter wogon troverser where pusher Jal Ffe,t#sft Gupf*,
the wogon tippler. There{ore even eiecting out empty wogon from is warkitlg as Qhief
though the totol lond requirement troverser to exit trock. The enclosed Gefisral lt$afieger, with
HALTEC Cansulting
for the grinding unit is only 5 orrongement drowing ond Frivate Ltd. l4e has done
hecfores, obout 2.5 hectores of photogroph shows functioning of graduatian in
lond need to be ocquired only for Mecfi :wr'dal engrneerlng
wogon rroverser.
trom 8lT Mesra in 1982
roilwoys. The plot size for the and later tu184 througlt
The wogon shifter works ol the
roilwoys olso becomes odd {Approx carrespandence. He
50 m wide x 1500 m longl. In our some speed os the wogon lippler kas over 32 yrs af experien*e and has
ond bofh these equipments work b*en with H3LTC 6inc t995. He has
recent proiects we hove Foced lot i:*en respr:n$ibfe fur execllfion of nany
of problems on this occount. in tondem. This woy the spoce seffient projecls f ram e onsept fo
c*mmissianing" tle has wide escpasure to
prcjects sufside tndla, ineluding ifi
Vietnam, Az*rbaijan, Ffhicpia, .Saudl
A{ebia, Fakisfen, Li$ya, Mang*lia etc.

Pradeep Kurnar
Mittal, is w*&iftg as Chiet
Gsneral Meneper, with
H}LTgQ Q$nsulting
Fryale fid l4e has done
graduatian ifi Mechanica]
engineering with post
,grsduaffbn in Suslness
.; Atlministrati*n. Ile Flas
pver $9 yrs of *xpariene afid has besn
with HOLT*.$ sinee 1982. t'fe has been
r*sponsible for Fusiness dev*lopment for
eansulting assigrrnents, exeeutian af
rfiany cement ptant rclated cansulting
essigtnrnenfs reJaled fo feasr&iJrdy stodies,
due diligen#, $\a{keting, i:f systern$, a$
well as sfud/'es {at ather "5clars, in lndia
e8 wetl as in ather aauntries like,
Switzerlafid, Uganda, l'lungary, China,
AlEaria, Atrgeria, UAE, Sanglad*sh, lrary,
frenrnark, #hatan etc. tr
Attention
Readers/Purchase Managers
Figure 4: Typical Arrangemenf Wagan lraverusr {$htr?e$ While writing to the Advertisers,
To tockle this issue one of the requirement for the roil trocks Manufacturers, whose Products
supplier's for wogon tippler, come reduces to qlmost holf. However, are described in this issue
out with the sofulion of wogon one porollel roil trock needs be please mention that you have
troYer3er, immediotely sfier the constructed besides the trock for seen their Product description/
wogon tippler. Keeping in mind removol of wogons. Advertisements in this
the limiiotions of lond ond
Expected benefits Magazine, A copy of letter
confidence on designs, the wogon
troverser ore being instolled in one r Sovings in lsnd cost qnd veriiqble addressed to them may please
of Holtec prolect. size of plot. be endorsed to:

After the wogon is unlooded on Benefits of wogon lroverser ore


wogon tippler, side orm chorger usuolly cose specific, ond in some
ploces empty wogon on troverser of the coses, its inclusion could help
toble, wogon is shifted to onother the unit greotly.

J-S'14 PROCESS & PLANT ENGINEERING 45