Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with

ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

SHEET NO. STATION AREA REMARKS

1 100+574.890 to 100+980.000 2,767.24


100+980.000 to 101+011.785 106.32
2 101+011.785 to 101+400.000 2,621.04
101+400.000 to 101+800.000 106.32
3 101+800.000 to 102+200.000 2,766.00
102+200.000 to 102+600.000 2,470.82
4 102+600.000 to 103+000.000 1,558.92

5 123+600.000 124+000.000 -
124+000.000 124+400.000 -
6 124+400.000 124+800.000 -
124+800.000 125+200.000 -
7 125+200.000 125+600.000 2,110.00
125+600.000 126+000.000 2,737.00
8 126+000.000 126+400.000 2,747.50
126+400.000 126+800.000 2,682.00
9 126+800.000 127+200.000 2,673.80
127+200.000 127+600.000 2,743.00
10 127+600.000 128+000.000 2,680.00
128+000.000 128+400.000 2,766.50
11 128+400.000 128+800.000 2,787.50
128+800.000 129+200.000 2,840.50
12 129+200.000 129+600.000 2,680.00
129+600.000 130+000.000 2,328.25

TOTAL 44,172.71 SQ. M.

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Project Manager Deputy Project Manager
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT


AREA COMPUTATION AREA COMPUTATION
STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

100+574.890 3.350 3.350 6.70 100+980.000 3.340 3.350 6.69


25.11 168.24 31.79 106.32
100+600.000 3.350 3.350 6.70 101+011.785 3.350 3.350 6.70
20.00 134.00
100+620.000 3.350 3.350 6.70
20.00 137.00
100+640.000 3.650 3.350 7.00
20.00 142.00
100+660.000 3.850 3.350 7.20
20.00 144.00
100+680.000 3.850 3.350 7.20
20.00 141.00
100+700.000 3.550 3.350 6.90
20.00 136.00
100+720.000 3.350 3.350 6.70
20.00 134.00
100+740.000 3.350 3.350 6.70
20.00 134.00
100+760.000 3.350 3.350 6.70
20.00 134.00
100+780.000 3.350 3.350 6.70
20.00 137.50
100+800.000 3.700 3.350 7.05
20.00 139.00
100+820.000 3.500 3.350 6.85
20.00 137.00
100+840.000 3.500 3.350 6.85
20.00 139.30
100+860.000 3.350 3.730 7.08
20.00 137.80
100+880.000 3.350 3.350 6.70
20.00 134.00
100+900.000 3.350 3.350 6.70
20.00 134.00
100+920.000 3.350 3.350 6.70
20.00 134.00
100+940.000 3.350 3.350 6.70
20.00 136.50
100+960.000 3.600 3.350 6.95
20.00 133.90
100+980.000 3.340 3.350 6.69
Sub - total 2767.24 Sub - total 106.32

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT


AREA COMPUTATION AREA COMPUTATION
STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

101+011.785 3.350 3.350 6.70 101+400.000 3.350 3.350 6.70


8.21 55.04 20.00 134.00
101+020.000 3.350 3.350 6.70 101+420.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+040.000 3.350 3.350 6.70 101+440.000 3.350 3.350 6.70
20.00 134.00 20.00 135.00
101+060.000 3.350 3.350 6.70 101+460.000 3.450 3.350 6.80
20.00 134.00 20.00 140.50
101+080.000 3.350 3.350 6.70 101+480.000 3.900 3.350 7.25
20.00 134.00 20.00 144.00
101+100.000 3.350 3.350 6.70 101+500.000 3.800 3.350 7.15
20.00 134.00 20.00 138.50
101+120.000 3.350 3.350 6.70 101+520.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+140.000 3.350 3.350 6.70 101+540.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+160.000 3.350 3.350 6.70 101+560.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+180.000 3.350 3.350 6.70 101+580.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+200.000 3.350 3.350 6.70 101+600.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+220.000 3.350 3.350 6.70 101+620.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+240.000 3.350 3.350 6.70 101+640.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+260.000 3.350 3.350 6.70 101+660.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+280.000 3.350 3.350 6.70 101+680.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+300.000 3.350 3.350 6.70 101+700.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+320.000 3.350 3.350 6.70 101+720.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
101+340.000 3.350 3.350 6.70 101+740.000 3.350 3.350 6.70
20.00 139.00 20.00 134.00
101+360.000 3.350 3.850 7.20 101+760.000 3.350 3.350 6.70
20.00 144.00 20.00 134.00
101+380.000 3.350 3.850 7.20 101+780.000 3.350 3.350 6.70
20.00 139.00 20.00 135.00
101+400.000 3.350 3.350 6.70 101+800.000 3.450 3.350 6.80
Sub - total 2621.04 Sub - total 2703.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

101+800.000 3.450 3.350 6.80 102+200.000 3.350 3.350 6.70


20.00 139.50 20.00 134.00
101+820.000 3.800 3.350 7.15 102+220.000 3.350 3.350 6.70
20.00 143.00 20.00 134.00
101+840.000 3.800 3.350 7.15 102+240.000 3.350 3.350 6.70
20.00 146.00 20.00 139.00
101+860.000 4.100 3.350 7.45 102+260.000 3.850 3.350 7.20
20.00 149.00 20.00 145.50
101+880.000 4.100 3.350 7.45 102+280.000 4.000 3.350 7.35
20.00 149.00 20.00 148.00
101+900.000 4.100 3.350 7.45 102+300.000 4.100 3.350 7.45
20.00 149.00 20.00 145.00
101+920.000 4.100 3.350 7.45 102+320.000 3.700 3.350 7.05
20.00 145.00 18.15 124.78
101+940.000 3.700 3.350 7.05 102+338.150 3.350 3.350 6.70
20.00 137.50 21.85
101+960.000 3.350 3.350 6.70 102+360.000
20.00 134.00 23.65
101+980.000 3.350 3.350 6.70 102+383.650 3.350 3.350 6.70
20.00 134.00 16.35 114.04
102+000.000 3.350 3.350 6.70 102+400.000 3.350 3.900 7.25
20.00 134.00 20.00 148.00
102+020.000 3.350 3.350 6.70 102+420.000 3.350 4.200 7.55
20.00 134.00 20.00 151.00
102+040.000 3.350 3.350 6.70 102+440.000 3.350 4.200 7.55
20.00 134.00 20.00 146.00
102+060.000 3.350 3.350 6.70 102+460.000 3.350 3.700 7.05
20.00 134.00 20.00 137.50
102+080.000 3.350 3.350 6.70 102+480.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
102+100.000 3.350 3.350 6.70 102+500.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
102+120.000 3.350 3.350 6.70 102+520.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
102+140.000 3.350 3.350 6.70 102+540.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
102+160.000 3.350 3.350 6.70 102+560.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
102+180.000 3.350 3.350 6.70 102+580.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
102+200.000 3.350 3.350 6.70 102+600.000 3.350 3.350 6.70
Sub - total 2766.00 Sub - total 2470.82

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

102+600.000 3.350 3.350 6.70


20.00 134.00
102+620.000 3.350 3.350 6.70
20.00 134.00
102+640.000 3.350 3.350 6.70
20.00 134.00
102+660.000 3.350 3.350 6.70
20.00 134.00
102+680.000 3.350 3.350 6.70
20.00 134.00
102+700.000 3.350 3.350 6.70
20.00 134.00
102+720.000 3.350 3.350 6.70
20.00 134.00
102+740.000 3.350 3.350 6.70
20.00 134.00
102+760.000 3.350 3.350 6.70
20.00 134.00
102+780.000 3.350 3.350 6.70
20.00 134.00
102+800.000 3.350 3.350 6.70
20.00 134.00
102+820.000 3.350 3.350 6.70
25.35 84.92
102+845.350 3.350 3.350 6.70
14.65 0.00
102+860.000 0.00
20.00 0.00
102+880.000 0.00
20.00 0.00
102+900.000 0.00
20.00 0.00
102+920.000 0.00
20.00 0.00
102+940.000 0.00
20.00 0.00
102+960.000 0.00
20.00 0.00
102+980.000 0.00
20.00 0.00
103+000.000 0.00
Sub - total 1558.92 Sub - total 0.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

123+600.000 124+000.000 0.000 0.000 0.00


20.00 20.00 0.00
123+620.000 124+020.000 0.00
20.00 20.00 0.00
123+640.000 124+040.000 0.00
20.00 20.00 0.00
123+660.000 124+060.000 0.00
20.00 20.00 0.00
123+680.000 124+080.000 0.00
20.00 20.00 0.00
123+700.000 124+100.000 0.00
20.00 20.00 0.00
123+720.000 124+120.000 0.00
20.00 20.00 0.00
123+740.000 124+140.000 0.00
20.00 20.00 0.00
123+760.000 124+160.000 0.00
20.00 20.00 0.00
123+780.000 124+180.000 0.00
20.00 20.00 0.00
123+800.000 124+200.000 0.00
20.00 20.00 0.00
123+820.000 124+220.000 0.00
20.00 20.00 0.00
123+840.000 124+240.000 0.00
20.00 20.00 0.00
123+860.000 124+260.000 0.00
20.00 20.00 0.00
123+880.000 124+280.000 0.00
20.00 20.00 0.00
123+900.000 124+300.000 0.00
20.00 20.00 0.00
123+920.000 124+320.000 0.00
20.00 20.00 0.00
123+940.000 124+340.000 0.00
20.00 20.00 0.00
123+960.000 124+360.000 0.00
20.00 20.00 0.00
123+980.000 124+380.000 0.00
20.00 20.00 0.00
124+000.000 124+400.000 0.00
Sub - total 0.00 Sub - total 0.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

124+400.000 0.00 124+800.000 0.000 0.000 0.00


20.00 0.00 20.00 0.00
124+420.000 0.00 124+820.000 0.00
20.00 0.00 20.00 0.00
124+440.000 0.00 124+840.000 0.00
20.00 0.00 20.00 0.00
124+460.000 0.00 124+860.000 0.00
20.00 0.00 20.00 0.00
124+480.000 0.00 124+880.000 0.00
20.00 0.00 20.00 0.00
124+500.000 0.00 124+900.000 0.00
20.00 0.00 20.00 0.00
124+520.000 0.00 124+920.000 0.00
20.00 0.00 20.00 0.00
124+540.000 0.00 124+940.000 0.00
20.00 0.00 20.00 0.00
124+560.000 0.00 124+960.000 0.00
20.00 0.00 20.00 0.00
124+580.000 0.00 124+980.000 0.00
20.00 0.00 20.00 0.00
124+600.000 0.00 125+000.000 0.00
20.00 0.00 20.00 0.00
124+620.000 0.00 125+020.000 0.00
20.00 0.00 20.00 0.00
124+640.000 0.00 125+040.000 0.00
20.00 0.00 20.00 0.00
124+660.000 0.00 125+060.000 0.00
20.00 0.00 20.00 0.00
124+680.000 0.00 125+080.000 0.00
20.00 0.00 20.00 0.00
124+700.000 0.00 125+100.000 0.00
20.00 0.00 20.00 0.00
124+720.000 0.00 125+120.000 0.00
20.00 0.00 20.00 0.00
124+740.000 0.00 125+140.000 0.00
20.00 0.00 20.00 0.00
124+760.000 0.00 125+160.000 0.00
20.00 0.00 20.00 0.00
124+780.000 0.00 125+180.000 0.00
20.00 0.00 20.00 0.00
124+800.000 0.00 125+200.000 0.00
Sub - total 0.00 Sub - total 0.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

125+200.000 0.00 125+600.000 3.350 3.350 6.70


20.00 0.00 20.00 134.00
125+220.000 0.00 125+620.000 3.350 3.350 6.70
18.00 0.00 20.00 134.00
125+238.000 0.00 125+640.000 3.350 3.350 6.70
22.00 0.00 20.00 134.00
125+260.000 0.00 125+660.000 3.350 3.350 6.70
20.00 0.00 20.00 134.00
125+280.000 0.00 125+680.000 3.350 3.350 6.70
20.00 0.00 20.00 134.00
125+300.000 3.350 3.350 6.70 125+700.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
125+320.000 3.350 3.350 6.70 125+720.000 3.350 3.350 6.70
20.00 134.50 20.00 134.00
125+340.000 3.350 3.400 6.75 125+740.000 3.350 3.350 6.70
20.00 140.50 20.00 134.00
125+360.000 3.350 3.950 7.30 125+760.000 3.350 3.350 6.70
20.00 149.00 20.00 134.00
125+380.000 3.350 4.250 7.60 125+780.000 3.350 3.350 6.70
20.00 152.00 20.00 134.00
125+400.000 3.350 4.250 7.60 125+800.000 3.350 3.350 6.70
20.00 151.00 20.00 134.00
125+420.000 3.350 4.150 7.50 125+820.000 3.350 3.350 6.70
20.00 148.50 20.00 134.00
125+440.000 3.350 4.000 7.35 125+840.000 3.350 3.350 6.70
20.00 146.00 20.00 134.00
125+460.000 3.350 3.900 7.25 125+860.000 3.350 3.350 6.70
20.00 144.50 20.00 139.00
125+480.000 3.350 3.850 7.20 125+880.000 3.850 3.350 7.20
20.00 139.50 20.00 144.00
125+500.000 3.350 3.400 6.75 125+900.000 3.850 3.350 7.20
20.00 134.50 20.00 144.00
125+520.000 3.350 3.350 6.70 125+920.000 3.850 3.350 7.20
20.00 134.00 20.00 144.00
125+540.000 3.350 3.350 6.70 125+940.000 3.850 3.350 7.20
20.00 134.00 20.00 144.00
125+560.000 3.350 3.350 6.70 125+960.000 3.850 3.350 7.20
20.00 134.00 20.00 142.50
125+580.000 3.350 3.350 6.70 125+980.000 3.700 3.350 7.05
20.00 134.00 20.00 137.50
125+600.000 3.350 3.350 6.70 126+000.000 3.350 3.350 6.70
Sub - total 2110.00 Sub - total 2737.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

126+000.000 3.350 3.350 6.70 126+400.000 3.350 3.350 6.70


20.00 134.00 20.00 134.00
126+020.000 3.350 3.350 6.70 126+420.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+040.000 3.350 3.350 6.70 126+440.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+060.000 3.350 3.350 6.70 126+460.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+080.000 3.350 3.350 6.70 126+480.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+100.000 3.350 3.350 6.70 126+500.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+120.000 3.353 3.350 6.70 126+520.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+140.000 3.350 3.350 6.70 126+540.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+160.000 3.350 3.350 6.70 126+560.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+180.000 3.350 3.350 6.70 126+580.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+200.000 3.350 3.350 6.70 126+600.000 3.350 3.350 6.70
20.00 140.50 20.00 134.00
126+220.000 3.650 3.350 7.00 126+620.000 3.350 3.350 6.70
20.00 143.50 20.00 134.00
126+240.000 4.000 3.350 7.35 126+640.000 3.350 3.350 6.70
20.00 147.00 20.00 134.00
126+260.000 4.000 3.350 7.35 126+660.000 3.350 3.350 6.70
20.00 147.00 20.00 134.00
126+280.000 4.000 3.350 7.35 126+680.000 3.350 3.350 6.70
20.00 147.00 20.00 134.00
126+300.000 4.000 3.350 7.35 126+700.000 3.350 3.350 6.70
20.00 143.50 20.00 134.00
126+320.000 3.650 3.350 7.00 126+720.000 3.350 3.350 6.70
20.00 137.00 20.00 134.00
126+340.000 3.350 3.350 6.70 126+740.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+360.000 3.350 3.350 6.70 126+760.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
126+380.000 3.350 3.350 6.70 126+780.000 3.350 3.350 6.70
20.00 134.00 20.00 136.00
126+400.000 3.350 3.350 6.70 126+800.000 3.350 3.550 6.90
Sub - total 2747.50 Sub - total 2682.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

126+800.000 3.350 3.550 6.90 127+200.000 3.350 3.350 6.70


20.00 141.50 20.00 138.00
126+820.000 3.350 3.900 7.25 127+220.000 3.350 3.750 7.10
20.00 109.90 20.00 143.00
126+840.000 3.350 0.390 3.74 127+240.000 3.350 3.850 7.20
20.00 109.90 20.00 144.00
126+860.000 3.350 3.900 7.25 127+260.000 3.350 3.850 7.20
20.00 145.50 20.00 141.00
126+880.000 3.350 3.950 7.30 127+280.000 3.350 3.550 6.90
20.00 146.00 20.00 136.00
126+900.000 3.350 3.950 7.30 127+300.000 3.350 3.350 6.70
20.00 142.50 20.00 135.50
126+920.000 3.350 3.600 6.95 127+320.000 3.500 3.350 6.85
20.00 136.50 20.00 139.50
126+940.000 3.350 3.350 6.70 127+340.000 3.750 3.350 7.10
20.00 134.00 20.00 142.00
126+960.000 3.350 3.350 6.70 127+360.000 3.750 3.350 7.10
20.00 134.00 20.00 142.00
126+980.000 3.350 3.350 6.70 127+380.000 3.750 3.350 7.10
20.00 134.00 20.00 140.00
127+000.000 3.350 3.350 6.70 127+400.000 3.550 3.350 6.90
20.00 134.00 20.00 136.00
127+020.000 3.350 3.350 6.70 127+420.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+040.000 3.350 3.350 6.70 127+440.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+060.000 3.350 3.350 6.70 127+460.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+080.000 3.350 3.350 6.70 127+480.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+100.000 3.350 3.350 6.70 127+500.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+120.000 3.350 3.350 6.70 127+520.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+140.000 3.350 3.350 6.70 127+540.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+160.000 3.350 3.350 6.70 127+560.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+180.000 3.350 3.350 6.70 127+580.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+200.000 3.350 3.350 6.70 127+600.000 3.350 3.350 6.70
Sub - total 2673.80 Sub - total 2743.00

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

127+600.000 3.350 3.350 6.70 128+000.000 3.350 3.350 6.70


20.00 134.00 20.00 134.00
127+620.000 3.350 3.350 6.70 128+020.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+640.000 3.350 3.350 6.70 128+040.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+660.000 3.350 3.350 6.70 128+060.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+680.000 3.350 3.350 6.70 128+080.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+700.000 3.350 3.350 6.70 128+100.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+720.000 3.350 3.350 6.70 128+120.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+740.000 3.350 3.350 6.70 128+140.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+760.000 3.350 3.350 6.70 128+160.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+780.000 3.350 3.350 6.70 128+180.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+800.000 3.350 3.350 6.70 128+200.000 3.350 3.350 6.70
20.00 134.00 20.00 136.50
127+820.000 3.350 3.350 6.70 128+220.000 3.600 3.350 6.95
20.00 134.00 20.00 139.00
127+840.000 3.350 3.350 6.70 128+240.000 3.600 3.350 6.95
20.00 134.00 20.00 139.00
127+860.000 3.350 3.350 6.70 128+260.000 3.600 3.350 6.95
20.00 134.00 20.00 143.00
127+880.000 3.350 3.350 6.70 128+280.000 4.000 3.350 7.35
20.00 134.00 20.00 151.00
127+900.000 3.350 3.350 6.70 128+300.000 4.400 3.350 7.75
20.00 134.00 20.00 155.00
127+920.000 3.350 3.350 6.70 128+320.000 4.400 3.350 7.75
20.00 134.00 20.00 151.50
127+940.000 3.350 3.350 6.70 128+340.000 4.050 3.350 7.40
20.00 134.00 20.00 141.00
127+960.000 3.350 3.350 6.70 128+360.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
127+980.000 3.350 3.350 6.70 128+380.000 3.350 3.350 6.70
20.00 134.00 20.00 136.50
128+000.000 3.350 3.350 6.70 128+400.000 3.350 3.600 6.95
Sub - total 2680.00 Sub - total 2766.50

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

128+400.000 3.350 3.600 6.95 128+800.000 3.350 3.350 6.70


20.00 143.00 20.00 134.00
128+420.000 3.350 4.000 7.35 128+820.000 3.350 3.350 6.70
20.00 145.50 20.00 134.00
128+440.000 3.350 3.850 7.20 128+840.000 3.350 3.350 6.70
20.00 139.00 20.00 135.50
128+460.000 3.350 3.350 6.70 128+860.000 3.350 3.500 6.85
20.00 140.50 20.00 144.00
128+480.000 4.000 3.350 7.35 128+880.000 3.350 4.200 7.55
20.00 147.00 20.00 151.00
128+500.000 4.000 3.350 7.35 128+900.000 3.350 4.200 7.55
20.00 147.00 20.00 151.00
128+520.000 4.000 3.350 7.35 128+920.000 3.350 4.200 7.55
20.00 142.50 20.00 151.00
128+540.000 3.550 3.350 6.90 128+940.000 3.350 4.200 7.55
20.00 141.00 20.00 146.00
128+560.000 3.350 3.850 7.20 128+960.000 3.350 3.700 7.05
20.00 148.50 20.00 137.50
128+580.000 3.350 4.300 7.65 128+980.000 3.350 3.350 6.70
20.00 148.50 20.00 134.00
128+600.000 3.350 3.850 7.20 129+000.000 3.350 3.350 6.70
20.00 139.00 20.00 140.50
128+620.000 3.350 3.350 6.70 129+020.000 3.350 3.550 6.90
20.00 134.00 20.00 142.50
128+640.000 3.350 3.350 6.70 129+040.000 3.350 4.000 7.35
20.00 134.00 20.00 147.00
128+660.000 3.350 3.350 6.70 129+060.000 3.350 4.000 7.35
20.00 134.00 20.00 143.00
128+680.000 3.350 3.350 6.70 129+080.000 3.350 3.600 6.95
20.00 134.00 20.00 139.00
128+700.000 3.350 3.350 6.70 129+100.000 3.600 3.350 6.95
20.00 134.00 20.00 142.50
128+720.000 3.350 3.350 6.70 129+120.000 3.950 3.350 7.30
20.00 134.00 20.00 146.00
128+740.000 3.350 3.350 6.70 129+140.000 3.950 3.350 7.30
20.00 134.00 20.00 145.00
128+760.000 3.350 3.350 6.70 129+160.000 3.850 3.350 7.20
20.00 134.00 20.00 141.00
128+780.000 3.350 3.350 6.70 129+180.000 3.550 3.350 6.90
20.00 134.00 20.00 136.00
128+800.000 3.350 3.350 6.70 129+200.000 3.350 3.350 6.70
Sub - total 2787.50 Sub - total 2840.50

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATION

PAY ITEM NO. 311 PORTLAND CEMENT CONCRETE PAVEMENT

AREA COMPUTATION AREA COMPUTATION


STATION Distance Left Right Total Area STATION Distance Left Right Total Area
(m) (m) (m) (m) (sq.m.) (m) (m) (m) (m) (sq.m.)

129+200.000 3.350 3.350 6.70 129+600.000 3.350 3.350 6.70


20.00 134.00 20.00 134.00
129+220.000 3.350 3.350 6.70 129+620.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+240.000 3.350 3.350 6.70 129+640.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+260.000 3.350 3.350 6.70 129+660.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+280.000 3.350 3.350 6.70 129+680.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+300.000 3.350 3.350 6.70 129+700.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+320.000 3.350 3.350 6.70 129+720.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+340.000 3.350 3.350 6.70 129+740.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+360.000 3.350 3.350 6.70 129+760.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+380.000 3.350 3.350 6.70 129+780.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+400.000 3.350 3.350 6.70 129+800.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+420.000 3.350 3.350 6.70 129+820.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+440.000 3.350 3.350 6.70 129+840.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+460.000 3.350 3.350 6.70 129+860.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+480.000 3.350 3.350 6.70 129+880.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+500.000 3.350 3.350 6.70 129+900.000 3.350 3.350 6.70
20.00 134.00 20.00 134.00
129+520.000 3.350 3.350 6.70 129+920.000 3.350 3.350 6.70
20.00 134.00 27.50 184.25
129+540.000 3.350 3.350 6.70 129+947.500 3.350 3.350 6.70
20.00 134.00 12.50 0.00
129+560.000 3.350 3.350 6.70 129+960.000 0.00
20.00 134.00 20.00 0.00
129+580.000 3.350 3.350 6.70 129+980.000 0.00
20.00 134.00 20.00 0.00
129+600.000 3.350 3.350 6.70 130+000.000 0.00
Sub - total 2680.00 Sub - total 2328.25

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Resident Engineer
CONSULTANT CONSULTANT