B —= >,
Set
i ——)
ny s
Climb to the
i! top with
“Rightway”’
Steel
Scaffolding
if
ee)
a
WOISTEST-
Tubular Fabricating Co., Inc.
7 cop
205) 785-4197
¢
Peete Os eee ey mcm
for NELGuard Post,
Toe Boards
may be
required as
needed -
End
Frame
Because there Is NO stacking pin on top,
RIGHTWAY" SCAFFOLD can be used as
shoring without the costly labor of removing
pins {not to montion the cost of lost pins),
NOTE:
*RIGHTWAY'S”
exclusive
stacking
devi
"RIGHTWAY" Brace Lock can be
used with the scaffold upside down.
Most other brands can not.MA
|
east
z I sorisaim—i 2
B
ver anan-
| ! r = ee
mi ae
\ Cl 5
: Jere) |
——l i Su
Revernsun—et Legos Resor say at
z | fd
8 z | 1 +
z a 2 é
| I 8 & z
roa 4 4 i
fakin eae Medinet eSB
“ " 10. 762M) “ we7emre!
SK soar caraciee
{alvanized Fash)
Upper Sil 4.9° 0D - Base 24" 0
— EASY ADJUSTMENT -
— RANGE OF sizes —
NOTE: All end frames of the same width are interchangeable, With the use of Transfer U's, 2'6" wide end frame
can be used on top of the 5'U” wide end frames, The width to be spanned between two end frames determines th
brace spread,
STRAIGHT BRACE OR GUARD RAIL
aS
5/18" BOLT
4
‘eTuD
CENTER:
AHO ‘SPREAD |
Crossbrace available in these different spreads
1O ft (3.05 meters}
8ft (244 meters) Other spreads can be
Tt. (219 meters) special ordered to
ft. (1.83 meters) your specifications
Bit (1.52 meters)
4ft? (1.15 meters)
3ft (91 meters)
24/2 ft. (76 meters)
2ft (61 meters)
"Actual spread is '0-3/8"
69-1/2" (2.07M)
SIDEWALK BARRICADEi &
nero e
exon
SHORING (SIDEVIEW)
om laa ne
CoNcneTEsuoRie
SHE aes ricxocene ca ait pik, se eat Ud a ajinston wh “HLTA
Scaffolding are to be determined by the equipment user.
This ie an EXAMPLE ONLY of how to uta “RIGHTWAY" Seatolding 08 shoring, BE SAFE! Remember i tf
SSRIURla pou ell wrorkncut ERLE Cae CTS eee
je itl abe 6TH Wo liv aT te NGS GE lng
aes
| TUBE AND CLAMP SCAFFOLDING
THIS EQUIPMENT WILL ALLOW YOU TO
SCAFFOLD ANY IRREGULAR OBJECT. IT
CAN ALSO BE USED IN CONJUNCTION
WITH OUR STANDARD WELDED TUBULAR
eel
be
WE MEMRERS RIGID RIGHT