SBA DRAWINGS STATUS REVIEW/ TNG QUT TNH TRNG BN V D N SBA 6/30/2017

Required Action/Issue Date/


Item/ Request Date/ Status/
Description/ M t Hnh ng yu cu/ Ngy pht Comments/ Ch thch
S TT Ngy yu cu Tnh trng
hnh
Architectural Revit Model Set out - Grid line issues:
Gridlines for Ground floor and all floors above doesn't line up, there were
two sets of Grids for the whole package and there were no interface for
understanding. We will not be able to set up on site or determine where
the risers for comms and Electrical are. there were another set of gridlines
for electrical drawings. Tu to check, reissue - incorrect labelling, grids and
Trnh by m hnh kin trc Revit - Vn v cc ng k : outstanding/
1 6/30/2017 6/30/2017 model used/ Mr. T kim tra, pht hnh li - khung tn
Cc ng k ca tng trt v cc tng trn khng ngay hng, c gi ch ang ch
sai, mng li v m hnh s dng.
c 02 b mng li v khng c mt phn gii d hiu.Chng ta khng
th ci t ti cng trng hoc ch nh v tr cc trc thng tng ca... v
h thng in. C 01 b mng li khc cho bn v in.

Revit Master Model use:


Electrical Draftee has used Revit Master Model of type A, B, C to draft
electrical layout and this will affect the whole model for architecture,
master revit should be locked from being accessed unless other approved
formally
outstanding/ Shane to instruct to lock master model/ Shane s
2 S dng m hnh Revit Master: 6/30/2017 6/30/2017
Cc k s s dng m hnh Revit Master loi A, B, C phc tho bn v ang ch hng dn kha m hnh master.
b tr in v iu ny s nh hng n c m hnh kin trc, v th, ch
c s dng master revit khi c s ph duyt chnh thc.

Riser required for COMMS (NBN, TELSTRA, FOXTEL, ACCESS


CONTROL and ETC) Electrical, Wet Fire, Dry Fire Shane to provide ammended layouts post discussion
Trc thng tng c yu cu . (NBN, TELSTRA, FOXTEL, ACCESS outstanding/ with peter james and MEP team / Shane cung cp bn
6/7/2017 7/4/2017
CONTROL and ETC) in, h thng CC nc, h thng CC kh ang ch v b tr chnh sa sau khi trao i vi Peter James
v i MEP.
3
Draftee, Checker and approval delgation to be on all title blocks of SBA/
Trn tt c khung tn bn v SBA phi c tn ngi phc tho, ngi kim 6/29/2017 6/30/2017 closed/ ng
4 tra v ph duyt
Fire Wall details outstanding - incorrect details were drawn where fire
collars will be required for every downlights, details were issued by fire
Engineers for rectification
Cc chi tit tng chng chy cn tn ti - nhng chi tit khng chnh outstanding/
6/8/2017 7/3/2017
xc ti cc vnh ai CC c v s c yu cu cho mi v tr n m ang ch
trn, nhng chi tit c pht hnh bi cc k s PCCC chnh sa.
5
Roof Layout, roof drainage and other drainage drawings (balconies
between floor, common areas): whats the final building height after lifting
roof 100 mm up to accommodate box gutter and vertical downpipe
Bn v b tr mi,thot nc trn mi v cc bn v thot nc khc
outstanding/
(ban cng gia cc tng, khu vc chung): ta nh cao bao nhiu sau 6/23/2017 7/4/2017
ang ch
khi nng mi ln 100mm cha mng nc ma hnh hp v cc mng
xi thng ng.

6
Details for pool common areas and the extra balcony areas - required / outstanding/
6/30/2017 7/6/2017
7 Chi tit khu vc b bi chung v khu vc ban cng ph - yu cu ang ch
Pool area sections done via building over all sections for BCA review on
compliance / Cc mt ct khu vc b bi tun theo tt c cc mt ct ca outstanding/
6/30/2017 7/4/2017
ta nh theo tiu chun BCA ang ch
8
architectural drawing package for structural engineer to compare with
structural model to determine load bearing and non load bearing elements
and sign off - this is requied by fire engineers to assist with fire rating
details - have cost implication outstanding/
Gi bn v kin trc cho cc k s kt cu c so snh vi m hnh kt 6/8/2016 7/6/2017
ang ch
cu quyt nh v ph duyt cc yu t trc nng v khng trc nng -
cc k s PCCC yu cu vic ny phi h tr cc chi tit t l PCCC - c ...
9
MEP TEAM Managers? Tu and Shane? Tu and shane responsible - company procedures
Qun l i MEP ? Mr. T v Shane 6/29/2017 6/30/2017 closed / ng required from Nigel / T v Shane cng chu trch
10 nhim - y l quy trnh ca cng ty t Nigel
Fire Engineers query in regards to other fire walls to be responded and
clarified / Cc k s PCCC yu cu vn tng chng chy phi c outstanding/
6/29/2017 7/6/2017
tr li v lm r. ang ch
11
Clash check issues/ Kim tra s xung t outstanding/
6/22/2017 7/4/2017
12 ang ch
Ammendment of ground floor changes to comply with BCA requirements/
Vic sa i nhng thay i tng trt tun theo tiu chun BCA outstanding/
6/7/2017 7/6/2017
ang ch
13
common areas design - required drainage will impact layout, cleaner store
requirements - due to tiled floors/ Bn v thit k cc khu vc chung - yu outstanding/
cu vic thot nc tc ng n vic b tr v d tr sch s - bi v y 6/6/2017 7/6/2017
ang ch
14 l sn p gch.
blind pelmets clashes with sprinklers service/ Cc mnh g vng vo h outstanding/
6/30/2017 7/6/2017
15 thng phun nc cha chy ang ch
proposal of external wall finish material to sync with 3D renders/ ngh outstanding/
6/9/2017 7/6/2017
16 m rng vt liu tng hon thin lin kt vi trt va 3D ang ch
bulkhead layout on reflected ceiling plans, MEP issued their required
space for bulkhead to Architectural team 29/6/17 / B tr vch ngn trn outstanding/
cc mt bng trn phn quang, MEP pht hnh khng gian yu cu ca 6/30/2017 7/6/2017
ang ch
17 cc vch ngn cho i kin trc ngy 29/06/2017.