SB Action Plan 170703 (E-V)
SB Action Plan 170703 (E-V)
6
Details for pool common areas and the extra balcony areas - required / outstanding/
6/30/2017 7/6/2017
7 Chi tit khu vc b bi chung v khu vc ban cng ph - yu cu ang ch
Pool area sections done via building over all sections for BCA review on
compliance / Cc mt ct khu vc b bi tun theo tt c cc mt ct ca outstanding/
6/30/2017 7/4/2017
ta nh theo tiu chun BCA ang ch
8
architectural drawing package for structural engineer to compare with
structural model to determine load bearing and non load bearing elements
and sign off - this is requied by fire engineers to assist with fire rating
details - have cost implication outstanding/
Gi bn v kin trc cho cc k s kt cu c so snh vi m hnh kt 6/8/2016 7/6/2017
ang ch
cu quyt nh v ph duyt cc yu t trc nng v khng trc nng -
cc k s PCCC yu cu vic ny phi h tr cc chi tit t l PCCC - c ...
9
MEP TEAM Managers? Tu and Shane? Tu and shane responsible - company procedures
Qun l i MEP ? Mr. T v Shane 6/29/2017 6/30/2017 closed / ng required from Nigel / T v Shane cng chu trch
10 nhim - y l quy trnh ca cng ty t Nigel
Fire Engineers query in regards to other fire walls to be responded and
clarified / Cc k s PCCC yu cu vn tng chng chy phi c outstanding/
6/29/2017 7/6/2017
tr li v lm r. ang ch
11
Clash check issues/ Kim tra s xung t outstanding/
6/22/2017 7/4/2017
12 ang ch
Ammendment of ground floor changes to comply with BCA requirements/
Vic sa i nhng thay i tng trt tun theo tiu chun BCA outstanding/
6/7/2017 7/6/2017
ang ch
13
common areas design - required drainage will impact layout, cleaner store
requirements - due to tiled floors/ Bn v thit k cc khu vc chung - yu outstanding/
cu vic thot nc tc ng n vic b tr v d tr sch s - bi v y 6/6/2017 7/6/2017
ang ch
14 l sn p gch.
blind pelmets clashes with sprinklers service/ Cc mnh g vng vo h outstanding/
6/30/2017 7/6/2017
15 thng phun nc cha chy ang ch
proposal of external wall finish material to sync with 3D renders/ ngh outstanding/
6/9/2017 7/6/2017
16 m rng vt liu tng hon thin lin kt vi trt va 3D ang ch
bulkhead layout on reflected ceiling plans, MEP issued their required
space for bulkhead to Architectural team 29/6/17 / B tr vch ngn trn outstanding/
cc mt bng trn phn quang, MEP pht hnh khng gian yu cu ca 6/30/2017 7/6/2017
ang ch
17 cc vch ngn cho i kin trc ngy 29/06/2017.
18