Professional Documents
Culture Documents
1 USG 4D 1 set
2 Ruangan 4 M * 4 M * 2,8 M 16 m2
3 Ruang Tunggu 2M * 4M * 2,8 M 8 M2
4 Air Conditioner 1,5 PK 2 Unit
5 Meubelair (meja 1 biro) 1 Unit
6 Meubelair (kursi) 3 unit
7 Seperangkat Komputer (PC + Multi fungsi Printer, Jaringan) 1 set
8 Alat Pelindung Diri 3 Set
9 Kursi Tunggu 2 Set
10 Pelatihan Paramedis 1 Pkt
1,350,000,000 Umur Sisa Depresiasi
1,100,000,000 per set 1,100,000,000 7 5% Rp157,142,857.14
5,000,000 per m2 80,000,000 7 0 Rp11,428,571.43
2,500,000 per m3 20,000,000 7 0 Rp2,857,142.86
4,000,000 per unit 8,000,000 3 0 Rp2,666,666.67
2,000,000 per unit 2,000,000 3 0 Rp666,666.67
300,000 per unit 900,000 3 0 Rp300,000.00
10,000,000 per set 10,000,000 3 0 Rp3,333,333.33
25,000,000 per set 75,000,000 7 0 Rp10,714,285.71
2,050,000 per set 4,100,000 3 0 Rp1,366,666.67
50,000,000 per pkt 50,000,000 5 Rp10,000,000.00
Rp200,476,190.47
BIAYA OPERASIONAL
Harian UMUM
Senin 20
Selasa 15
Rabu 10
Kamis 15
Jum'at 15
Sabtu 20
Minggu 15
Rerata 16 Per Hari
5594 Per Tahun
Harga Pokok
Dokter 30% 600,000 5,594 1,006,971,429
Paramedis 5% 600,000 5594 167,828,571
Alat Pembantu 2.50% 600,000 5594 83,914,286
Biaya Listrik 1% 600,000 5594 33,565,714
ATK 1% 600,000 5594 33,565,714
Pemeliharaan 1% 600,000 5594 33,565,714
Administrasi Penyelenggaraan 3% 600,000 5594 100,697,143
Menejemen 2% 600,000 5,594 67,131,429
Total Harga Pokok 1,527,240,000
Depresiasi 200,476,190
Bunga 10%
NPV Rp3,010,488,852.24
IRR 124%
MIRR 66%