You are on page 1of 1
EVENT ANALYSIS REPORT "TPS: PARAS THERATAL POWER STATION z Unit Capacity: 50 mW Station Code: T005 | Time- 1619 Hrs. | Date- 2903/2015 No. of days from last syne =| (00 days 04 hes 13 Min, 2. Operating conditions at the time of event:- toad MW ‘Coal Cycles inservice I ‘ilSupport 143 0, &F L NL 3. Nature of Event ‘TASet withdrawn at 16:19 His due to boiler tube leakage. Boller Hand tripped. Turbine tipped on boller trip protection, 4. Name of Protections/Relays Operated 41) STG 2 AVR COM ALARM 3 OPERATED, 2)STG 2 TR REL 186 8 OPERATED. 3) STG 2 TRREL286 B OPERATED | '4)220KV GEN CB 104 AUTO TRIP OPERATED. ‘Tripping sequence logics ok, Observations: = rum level was not maintaining, variation in drum level was (-400 to 100mm) also there was district varition In Furnace pressure. 6. Remedial Action / Work done “Tbe no 5 and its adjacent Two tubes (on each sides) cut & require size spool pieces welded .WSB-39 vicinity tubes found {eroded Thickness taken of 18 tubes (9 each from both sides) & severely eroded tubes (thickness <20%) was replaced. | Tota-28 joints 7. Root Cause Analysis: In interna inspection Burner panel tube no-S commer -2has fish mouth opening (thick lip rupture), This type of leakage may cause due to Abnormal firing rate lame impingement .This isa fist time fallure ia ths comer since commissioning. Also burner tip got eroded & profile changes ofall corners, must be replaced in AOH '. Preventive action suggested (Short Term): ‘Avoid flame impingement caused by fireball shifting due to any one burner out of service 9. Preventive action suggested {Long Term) =~ \WS® vcinty tube will be checked & replaced in forth coming ROH, 10. Similar event ocaurved lst imer= [U4 = NIL Times Date: a :10A.implementation status of Long / Short Term measures stated at Sr. No. 10> = 11. Boiler Lighted up [Time- 06:18 Hrs _| Date: 25/01/2015 12. TAset Synchronized —Trime= 1:27 rs | Date: 25/03/2035 =] 13. Remark i= ei 14, Recommendations of Work Section: 1. Procurement/ Replacement Plan: 2. Operational Error: 3. Delay in Maintenance: 4, Delay in bringing back the unit: 5. Training of Staff: 6, Whether remedial ction is completed satisfactory & point i closed : [Dy CE (Works)

You might also like