You are on page 1of 1
REVISED EVENT ANALYSIS REPORT UNITNO:OF "TS: PARAS THERMAL POWER STATION ‘Unit Capac: 250 mW, 1LHO Code: Station Code: 006 | Time- 01:30 Fs. | Date- 24/12/2014 Tio of days from last syne {53 days 12 hs. 53 mins. Opting conden the ie of avnt= Load MW (Coal Cycles in service ‘Oi'Seppor 200 26, EF 3. Nature of Event: Bole tripped on both Fan off due to ¥ phase PT. bust at 220KV switch yard TA set tied on bolle tri protection “Name of Protection Operated [Fist Up) and any ather main protections Operated: REL 186A, 185 A 186 hy, 286A, 286 Ay 286 Ay operated, “THiping seauence logics ok, 5. Observationsi= Tepped dve to external problem. n-house UAT suppy C/O tote station transformer not dane on Auto 6 Remedial Acton / Work done Damages metering P's replaced by 220KV switch yard staf 7, Root Cause Analyse = GT phase metering PT at 220KV switchyard found burst '. Preventive ation suggested Ghort Term) = Inthe scope of Mahe Transco, 9, Breventve ation suggested (Long Tem Inthe scope of Maha Transco letter sent rgarding remedial ation to avo recurrence. 0 Sir event occurred at tine [Nit | Timer {10Amplomentation status of Long / Shor Term measures ated at Sr. No. 10=NiL 1 oiler Lighted up Time- 23:00 ie | ate: 25/13/2018 [2 F-Aset synchronised Time 02552 Wis | Date: 26/12/2014 13. Remark = satis 44, Recommendations of Work Section: 4. Procurement/ Replacement Plan: 2 Operational ror: 3. Delay in Malntenance: 4. Delay in binging back the units 5. Training of Stat 6. Whether remedial action Is completed satisfactory & point Is dosed: {ce/Dy CE (Works)

You might also like