REVISED EVENT ANALYSIS REPORT
UNITNO:OF "TS: PARAS THERMAL POWER STATION ‘Unit Capac: 250 mW,
1LHO Code: Station Code: 006 | Time- 01:30 Fs. | Date- 24/12/2014 Tio of days from last syne
{53 days 12 hs. 53 mins.
Opting conden the ie of avnt=
Load MW (Coal Cycles in service ‘Oi'Seppor
200 26, EF
3. Nature of Event:
Bole tripped on both Fan off due to ¥ phase PT. bust at 220KV switch yard TA set tied on bolle tri protection
“Name of Protection Operated [Fist Up) and any ather main protections Operated:
REL 186A, 185 A 186 hy, 286A, 286 Ay 286 Ay operated,
“THiping seauence logics ok,
5. Observationsi=
Tepped dve to external problem. n-house UAT suppy C/O tote station transformer not dane on Auto
6 Remedial Acton / Work done
Damages metering P's replaced by 220KV switch yard staf
7, Root Cause Analyse =
GT phase metering PT at 220KV switchyard found burst
'. Preventive ation suggested Ghort Term) =
Inthe scope of Mahe Transco,
9, Breventve ation suggested (Long Tem
Inthe scope of Maha Transco letter sent rgarding remedial ation to avo recurrence.
0 Sir event occurred at tine [Nit | Timer
{10Amplomentation status of Long / Shor Term measures ated at Sr. No. 10=NiL
1 oiler Lighted up Time- 23:00 ie | ate: 25/13/2018
[2 F-Aset synchronised Time 02552 Wis | Date: 26/12/2014
13. Remark =
satis
44, Recommendations of Work Section:
4. Procurement/ Replacement Plan:
2 Operational ror:
3. Delay in Malntenance:
4. Delay in binging back the units
5. Training of Stat
6. Whether remedial action Is completed satisfactory & point Is dosed:
{ce/Dy CE (Works)