EVENT ANALYSIS REPORT Unit Capacity: 210 MW No, of days from last synch. 19 Days UNITNO: 3 1. *HO Code: 13.04.2017 2. Last COH / AOH Date: 3. Operating conditions at the time of Event Load MW: Coal Cycles in service: Oil Support: 130 A.B,D&F ‘AB/CD/ EF (06 guns) | 4. Nature of Event: Boiler tripped on Furnace Pressure very low. 5. Name of First Up, Main Protections & protection on which GCB tripped: First Up: Boiler tripped on protection, Generator Tripped on: Turbine Trip. Turbine Tripped on: — Hand tripped. Boiler Tripped on: Furnace Pressure Very Low. 6 A) Observations: ALO7:10hrs. RCF ‘B" tripped due to stone trapped. Three Mills A, D, F were in service. Oil support at AB, CD, EF elevation (06 guns) in service. Furmace was unstable, suddenly boiler tripped on “Fumace Pressure Very Low’ 6B) Remedial Action / work done: RCF *B° stone removed, CMC’ & 9 light up activity started. ermal inspection permit given & boiler 7. Root Cause Analysis: Only 3 Mills A, D, F was running with wide gap between C/M A & D, with powdered coal feeding (sandy coal) resulted in furnace instability & boiler tripped. 8. Preventive action suggested (Short Term): Informed to CHP to bunker crushed size coal without stone shells. 9. Preventive action suggested (Long Term): 10, Similar event occurred last time: | Unit No. Time: Hrs. ‘| Date: 10A. Implementation Status of Long Term / Short Term measures stated at Sr. No. 9: II. Boiler ighted up: Date: - 13.04.2017 — 12. TG Set Synchronized: ‘Time : 09:17 Hrs. Date:- 13.04.2017 na 13. Remark : E49 BTPS, Deepnagar 14, Recommendations of Works Section: 1. Procurement/Replacement Plan: 2. Operational Error: 3. Delay in Maintenance: z 4. Delay in bringing back the Unit 5. Training of Staff: 6. Whether remedial act C.E./ Dy. CE (Works) *HO Code will be given by Works Section.

You might also like