TITLE PAGE ANTHONY BRIANNE S. DANDOY EPHEGEN D. TIGMO JOHN CARL O. TAMBAHOYOT CHRISTIAN GEORGE B. PAL-ING NORMAN C. CARPIO ELVIS G. CALUNOD
Engineer III
Engineer II Draftsman II Engineer II Assistant District Engineer OIC - District Engineer
Chief, Planning & Design Section
Luzon
Strait
South
China
Sea Luzon
Philippine
Sea
Mindoro
THIS SITE
Samar
REGION VII
Panay
Leyte
Palawan Cebu
Negros
Bohol
Sulu Sea
Mindanao
KEY MAP
INDEX OF SHEETS
SHEET NO. SHEET CONTENTS
1 TITLE PAGE
2 LOCATION PLAN
3 SUMMARY OF QUANTITIES
4 PROJECT LAY-OUT
GENERAL NOTES,GENERAL LEGEND,GENERAL ABBREVIATIONS, Cebu
5
SHEET NO. LEGEND
al
ent
TYPICAL TRENCH DETAIL,BUTT STRAP CLOSURE JOINT DETAIL,
6 VERTICAL CONCRETE THRUST BLOCKS(DOWNWARD THRUST)
Ori
Bohol
PIPE SUPPORT DETAIL,CONCRETE ANCHOR BLOCK 1,PIPE ROAD CROSSING,
s
gro
7 CONCRETE ANCHOR BLOCK,ELEVATION,STEEL CASING FOR STEEL WELDED
PIPE,TYPICAL DETAIL OF ISOLATION VALVE
Ne
VALVE BOX AND COVER,19mm(3/4) AIR VACUUM AND AIR RELEASE ASSEMBLY,
8 INSTALLATION OF BURIED GATE VALVE 300mm(12")AND SMALLER,FIRE
HYDRANT INSTALLATION (RESIDENTIAL TYPE)
THIS SITE
BLOW-OFF ASSEMBLY VALVE,TYPICAL DETAILS FOR STUB-OUT CONNECTION, Siquijor
9
SINGLE SERVICE CONNECTION,TYPICAL DETAILS FOR DEEP WELL REGION VII MAP
THIS SITE
Bitaug
Sandugan
Lomangcapan
Cangmalalag Cabulihan
Taculing Ponong
Poblacion ENRIQUE VILLANUEVA
Bino-ongan
Manan-ao
Canlambo Bolot
Balolang
Camogao
Bagacay Balolong
Parian Libo
Helen (Datag)
LARENA
North
South Poblacion Olave
Poblacion
Cangbagsa
Nonoc Bontod
Cangmangki
Sabang
Canlasog
Bintangan
Cang-allas
Sabang
Luyang Lotloton
Paliton
Cangmohao Calunasan
Cantabon Cantaroc A
Candura Sawang
Lala-o Cantugbas
Candaping A
Cansayang Tebjong
Poblacion Candaping B
Cangomantong
Capalasanan
Luzong
Maite
SAN JUAN Logucan
Tubod Nabutay
Napo Cangmatnog
Ponong Poo Tagmanocan
Cangclaran
Cang-atuyom Kimba
Liloan
Saguing
Tag-ibo
Kinamandagan
Cang-asa
Nagerong
Tigbawan(Pob.)
Ytaya
Catulayan
Catamboan(Pob.) Minalulan
Tignao
Simacolong
Timbaon
Upper Cabangcalan
LAZI
Gabayan
Cangmunag
Campalanas
Talayong
Lower Cabangcalan
VICINITY MAP
Designed:
Project Title and Location: Sheet Contents: Submitted: Recommending Approval: Approved: Set No. Sht No.
Republic of the Philippines JOHN CARL O. TAMBAHOYOT
Engineer II
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Drawn:
SIQUIJOR DISTRICT ENGINEERING OFFICE EPHEGEN D. TIGMO 2
CONSTRUCTION OF WATER SUPPLY PROJECT,
REGIONAL OFFICE VII INDEX OF SHEET Draftsman II
SAN JUAN CHRISTIAN GEORGE B. PAL-ING NORMAN C. CARPIO ELVIS G. CALUNOD
Larena, Siquijor Checked:
Engineer II
10
ANTHONY BRIANNE S. DANDOY OIC-Chief Planning & Design Section
Asst. District Engineer OIC - District Engineer
Engineer II
SUMMARY OF QUANTITIES
Designed:
Project Title and Location: Sheet Contents: Submitted: Recommending Approval: Approved: Set No. Sht No.
ANTHONY BRIANNE S. DANDOY
Republic of the Philippines Engineer II
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Drawn:
SIQUIJOR DISTRICT ENGINEERING OFFICE EPHEGEN D. TIGMO
CONSTRUCTION OF WATER SUPPLY PROJECT,
REGIONAL OFFICE VII
SAN JUAN, SIQUIJOR
SUMMARY OF QUANTITIES Draftsman II
CHRISTIAN GEORGE B. PAL-ING NORMAN C. CARPIO ELVIS G. CALUNOD
Larena, Siquijor Checked:
Engineer III
JOHN CARL O. TAMBAHOYOT Asst. District Engineer OIC - District Engineer
Engineer II Chief Planning & Design Section
PR
O PO
PI SE
PE D
PR
OP
OS
PIP ED
E
E
PIP
VC
LALA-O
uP
E
PIP
VC
uP
POBLACION
PE
PI
VC
uP
Designed:
Project Title and Location: Sheet Contents: Submitted: Recommending Approval: Approved: Set No. Sht No.
Republic of the Philippines JOHN CARL O. TAMBAHOYOT
Engineer II
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Drawn:
SIQUIJOR DISTRICT ENGINEERING OFFICE EPHEGEN D. TIGMO 4
CONSTRUCTION OF WATER SUPPLY PROJECT,
REGIONAL OFFICE VII PROJECT LAY-OUT Draftsman II
SAN JUAN CHRISTIAN GEORGE B. PAL-ING NORMAN C. CARPIO ELVIS G. CALUNOD
Larena, Siquijor Checked:
Engineer II
10
ANTHONY BRIANNE S. DANDOY OIC-Chief Planning & Design Section
Asst. District Engineer OIC - District Engineer
Engineer II
GENERAL NOTES GENERAL LEGEND
1. THE MINIMUM DESIGN PRESSURE SHALL BE 1,035 MPo (150psi) UNLESS OTHERWISE SHOWN OR SPECIFIED.
2. CONCRETE THRUST BLOCK SHALL BE PROVIDED ON ALL NON-WELDED STEEL PIPE LINES, WHETHER SHOWN OR NOT, IN ACCORDANCE WITH THE STANDARD
DRAWING CD-102R-A (SEE SHT. C-2).
STEEL WOOD CONCRETE EARTH GRAVEL
3. PIPE JOINTS MAY BE DELFECTED WITHIN THE LIMITS RECOMMENDED BY THE PIPE MANUFACTURERS. ROUGH
(SECTION)
4. INDICATED METRIC EQUIVALENT USED ON THESE PLANS FOR PIPE SIZES ARE AS FOLLOWS. PLYWOOD
= 13mm
SECT
PLAN
= 19mm
ELEV
= 25mm
BRICKS- CHB ROCK SAND CONC. C.H.B.
= 32mm
6. THE MINIMUM (28) TWENTY-EIGHT DAY CYLINDER COMPRESSIVE STRENGTH OF ALL CONCRETE SHALL BE TWO HUNDRED AND ELEVEN Kg/SQ.M.
Designed:
Project Title and Location: Sheet Contents: Submitted: Recommending Approval: Approved: Set No. Sht No.
ANTHONY BRIANNE S. DANDOY
Republic of the Philippines Engineer II
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Drawn:
SIQUIJOR DISTRICT ENGINEERING OFFICE EPHEGEN D. TIGMO
REGIONAL OFFICE VII
CONSTRUCTION OF WATER SUPPLY PROJECT,
Draftsman II
Larena, Siquijor SAN JUAN, SIQUIJOR CHRISTIAN GEORGE B. PAL-ING NORMAN C. CARPIO ELVIS G. CALUNOD
Checked:
Engineer III
JOHN CARL O. TAMBAHOYOT Asst. District Engineer OIC - District Engineer
Engineer II Chief Planning & Design Section
0.90 MIN. (FOR 300mm & LARGER
VAR
VAR
TRENCH WIDTH
6.44
6.44
0.15 (6") 0.152 " " " " " " " "
d
0.20 (8") " " " " " " " " " "
NORMAL INSTALLATION IN ROCK OR WHEN ACPP & PVC INSTALLATIONS
d/2
WHERE SAND BEDDING ORDERED BY ENGINEER IN NON-GRANULAR SOIL AS 0.25 (10") " " " " " " " " " "
BACKFILL NOT REQUIRED DETERMINED BY ENGINEER
0.30 (12") 0.203(8") 0.152(6") 0.1541(6.065") 0.1683(6.625") 0.00476(3/16")
CONCRETE
0.35 (14") " " " " " " " " " "
O
THRUST
BLOCK
LEGEND: 0.40 (16") " " " " " " " " " "
1. COMPACTED SELECTED NATIVE MATERIAL BACKFILL (SEE SPEC.)
2. COMPACTED SELECTED NATIVE (SEE SPEC.) 0.45 (18") " " " " " " " " " "
3. APPROVE SAND BEDDING & BACKFILL HAND PLACED AND COMPACTED B .
4. PAYMENT FOR ANY RESURFACING WILL BE BASED IN MAXIMUM TRENCH WIDTHS PER SIZE PIPE SHOWN BELOW
0.50 (20") 0.254(10") " " " " " " " " 0 MIN
0.3 A
NOTE: ALL DIMENSIONS IN METERS EXCEPT WHERE OTHERWISE SHOWN. SPACE SHALL BE PROVIDED FOR PIPE
JOINTS TO PREVENT BRIDGING. 0.60 (24") " " " " " " " " " "
ELEVATION SECTION
3"& LEGEND:
PIPE DIAMETER in UNDER 4" 6" 8" 10" 12" 14" 16" 18" 20" 22" 1. COMPACTED SELECTED NATIVE MATERIAL BACKFILL (SEE SPEC)
75"&
NOTES:
PIPE DIAMETER mm 100 160 200 250 300 350 400 450 500 600 2. I.D. OF BUTTS STRAP EQUALS OD OF PIPE
UNDER
3. SEE SPECS. FOR COATING AND LINING OF BUTT STRAP AND REPAIR OF PIPE LINING
EXCAVATION WIDTH m .20 .40 .45 .50 .55 .60 .65 .70 .75 .80 .90
1. ABOVE AREAS BASED ON AN ASSUMED SOIL BEARING PRESSURE 96kPa (2000psi).
2. REDUCE OR INCREASE AREAS PROPORTIONATELY TO SUIT ACTUAL FIELD
EXCAVATION DEPTH m .30 .70 .75 .80 .85 .90 .95 1.00 1.05 1.10 1.20 CONDITIONS UPON APPROVAL OF ENGINEER.
3. CONCRETE FOR THRUST BLOCK SHALL BE 13.8MPa (2000psi).
4. THRUST BLOCKS NOT REQUIRED ON STEEL PIPELINES WITH WELDED OR FLANGED
JOINTS OR ON SOLVENT.
TYPICAL TRENCH DETAIL 5. WHERE PIPE CONNECTS TO A FITTING ON A STEEL PIPELINE THE STEEL PIPELINE
SHALL BE BLOCKED AS SHOWN HEREON.
6. BEARING AREAS BASED ON INTERNAL PRESSURE OF 106m (150psi).
TRENCH WIDTH
MIN-PIPE O.D. +.30
MAX-PIPE O.D. +.60 TABLE OF MINIMUM THRUST BLOCK DIMENSIONS FOR
mm(in.) METERS
16mm CONT.
(AS SHOWN) 75(3") & 100(4") 0.25 0.14 0.12
(A)
AFTER REPAIR OF LINING 0.12
150(6") 0.25 0.31 0.17
0.15
ELEVATION OF CURB
ELEVATION OF CURB
ELEVATION OF
ELEVATION OF
ROADWAY
ROADWAY
U BOLTS W/ KNOT
1
4" x 2" FLAT BAR (HALF THREAD)
WS
B ISOMETRIC VIEW
TURN BUCKLE
TURN BUCKLE S-1 SCALE 1:40 MTS.
WIRE
WIRE
TURN BUCKLE
435
TURN BUCKLE
1 W/ KNOT (HALF THREAD)
4 x 1 21 ANGLE BAR
CURB
250 63 350
JOINT SECTION FAB. RUBBER
JOINT SECTION
600
B SIDE ELEVATION
WS
S-1 SCALE 1:30 MTS.
U BOLTS W/ KNOT
(HALF THREAD)
ISOMETRIC VIEW
350
5
43
400
MACHINE BOLT W/
NUT & WASHER
PIPE SUPPORT DETAIL
6mm x 60mm FLAT BAR
REST @ 200mm O.C.
POST
1000
1800
435
1200
1000
C1/F1
B FRONT ELEVATION
800
S-1
400
450mm TO 60mm
BY ENGINEER
AS DIRECTED
1P THREAD COUPLING
900
G.I. = GALVANIZED IRON
(COMPRESSION TYPE)
6. THE SERVICE CONNECTION SHALL BE LOCATED AS DETERMINED BY MUNICIPAL WATER
0.30m
250mm
TYP
TAIL PIECES SYSTEM.
END COATING 7. USE DUAL SERVICE CONNECTION ONLY ON 3 CUBIC METER INSTALLATIONS AND WHEN
FINISHED TYPE "B" DIRECTED BY THE MUNICIPAL WATER SYSTEM.
100
SURFACE C.I. & D.I. PIPE 8. USE COPPER TO I.P. THREAD COUP. STOP AS ADDITIONAL FITTING FOR WET TAPPING (SEE
CONCRETE PEDESTAL RUBBER BUSHING
4.60 MIN.
300
SPECS)
0.30mm RADIUS
9. MIN. TUBING TRENCH WIDTH SHALL BE 0.15m PAVEMENT FOR RESURFACING WILL BE BASE
TWO LAYERS
PLASTIC SHEET 38mm (1 21") G.I. PIPE SLEEVE 0.20m TRENCH WIDTH
MIN LENGTH = 0.50m 10. ALL G.I. PIPES AND FITTINGS SHALL BE SCHEDULE 40.01 PIPE SLEEVE. HOWEVER, SHALL BE
100mm (4") SCHED 40 STEEL SCHED 20.
VALVE AND VALVE BOX PIPE W/ CEMENT MORTAR
INSTALLATION CONC 11. INSTALL PVC TEE IN LIEU OF SADDLE IN 25mm PIPE.
LINING & COATING
BLOCK MAY BE OMITTED
0.30 MIN RADIUS 25mm ISO SIZE x 19mm (34")
CONCRETE THRUST BLOCK 0.12 SQ.M. METER
ANGLE METER STOP (TYPICAL)
BEARING AREA POUR AGAINST UNDISTURBED SOIL
100mm (4") FLANGE (MAYBE OMITTED ON WELDED STEEL PIPELINES)
0.25mm (I.S.O. SIZE) I.P. THREAD
COUPLING (COMPRESSION TYPE)
2.6 ft.
LEAD WIRES
TYPE "B" FILL WITH GRAVEL
IN CONDUIT
C.I. & D.I. PIPE
NIPPLE, THREADED RUBBER BUSHING
4.60 MIN.
90 ft.
2" ELL AND NIPPLE SLIPPED
25mm POLYETHYLENE OR OVER CABLES OR USE PIECES
GATE VALVE (THREADED) POLYETHYLENE PLASTIC ALL ANODES SUPPORTED OF RUBBER HOSE
50mm (2") G.I. PIPE SLEEVE
SERVICE LINE (I.S.O. SIZE) BY KYMAR ROPE TIED
MIN. LENGTH = 0.50m
OFF AT THE TOP
CONCRETE PEDESTAL
FILL TO THIS POINT WITH
ST. COUPLING/ADAPTER
LUBRICATED CALCINED
150mm
20 ft.
760mm MIN
150 ft.
CORPORATION STOP SINGLE SERVICE CONNECTION
THREADED (verify actual length)
ANODES
ELBOW (THREADED)
20 ft.
FLAT STRAP BRONZE BRASS DUCTILE IRON OR
CAST IRON SERVICE CLAMP I.P. THREAD STAINLESS
STEEL BOLTS (SEE SPECIFICATIONS)
BRASS COUPLING, COMPRESSION
SDR 11(variable length) TYPE W/ STIFFENER
TYPICAL DETAILS FOR STUB-OUT CONNECTION TYPICAL DETAILS FOR DEEP WELLS
Designed:
Project Title and Location: Sheet Contents: Submitted: Recommending Approval: Approved: Set No. Sht No.
Republic of the Philippines ANTHONY BRIANNE S. DANDOY
Engineer II
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS Drawn:
SIQUIJOR DISTRICT ENGINEERING OFFICE EPHEGEN D. TIGMO
REGIONAL OFFICE VII Draftsman II
CHRISTIAN GEORGE B. PAL-ING NORMAN C. CARPIO ELVIS G. CALUNOD
Larena, Siquijor Checked:
JOHN CARL O. TAMBAHOYOT Engineer III
Asst. District Engineer OIC - District Engineer
Engineer II Chief Planning & Design Section